QA_Set_1_Whiteman.pdf
PDF 88 KB Posted
- Attached to
- MMHS Materials Handling System, Whiteman AFB Missouri Federal contract opportunity
- Solicitation number
- FA8604-19-R-8117
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| GWH803-01.dwg | DWG drawing | |
| FA860419R8117007.pdf | ||
| QA_Set_6_Whiteman.pdf | ||
| FA860419R8117006.pdf | ||
| FA860419R8117005.pdf | ||
| QA_Set_5_Whiteman.pdf | ||
| GWH803-01.dwg | DWG drawing | |
| QA_Set_4_Whiteman.pdf | ||
| FA860419R8117004.pdf | ||
| QA_Set_3_Whiteman.pdf | ||
| GWH803-01.dwg | DWG drawing | |
| FA860419R8117003.pdf | ||
| FA860419R8117002.pdf | ||
| GWH803-03.dwg | DWG drawing | |
| GWH803-01.dwg | DWG drawing | |
| FA860419R8117001.pdf | ||
| QA_Set_2_Whiteman.pdf | ||
| RFP_FA8604-19-R-8117.pdf | ||
| GWH803-01.dwg | DWG drawing | |
| GWH803-02.dwg | DWG drawing | |
| Proposal_Checklist.Pricing_Summary_Sheet.pdf | ||
| GWH803-03.dwg | DWG drawing |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA8604-19-R-8117
Questions Set 1 05/09/19 Answers Set 1 Nathan Meyer 05/09/19
Q1. Appendix D, in-processing modular office, paragraph 3.3.4, Communication Service. The paragraph ends with "Contractor shall obtain final approval for final connection to existing base communication system from the COTR." Do you mean we actually connect to the base system or do you want us to run the cable within the modular office and pigtail it on the outside of the two modular offices?
A1. Connect to the existing COM system at the base. The base will provide the tie off points for the electric and COM hookup.
RE: Cover – Demo – there is information in the appendix, nor scale on the drawing to suggest the size of the office to be removed.
Added dimensions of the existing modular office to be removed to the Cover PD section 3.1.8. Noted in Cover PD (REV 3) document.
Q2. Is there sprinkler to be disconnected / removed in the existing office?
Sprinkler system in the existing office is to be disconnected and removed.
Q3.Are there AC units to be removed / disposed of?
AC units in the existing modular office are to be removed and disposed of as well.
I added existing photos to the Cover PD (REV 3) section 3.1.8 in regards to the sprinkler and AC units in the existing modular office. These are to be removed with the existing modular office.
There is also no information forum on the pallet rack or shelving supported mezzanine in bldg. 26 provided that we can assess a proposal to remove / dispose of with.
Building 26 required security clearance. No electronics were allowed. No photos of the existing equipment to be removed were available. I updated AF Drawing GWH803-03 to include detail of the bin shelving constructed mezzanine to be removed in building 26. Cover PD (Rev 3) now states in section
3.1.8. “Building 26 existing bin shelving constructed mezzanine, and existing Pallet Rack shall be removed as shown on AF Drawing GWH803-03. The Pallet Rack to be removed consist of 18 bays each with 6 storage levels. Each bay is 15’H x 9’W x 3.5’D. The bin shelving constructed mezzanine to be removed consist of 324 bays of bin shelving, row light fixtures, bar grate decking, and fire suppression system. Each bay is approximately 3’W x 2’D x 89”H. Bin shelving bays range from 3 to 12 shelves. The top level of the existing bin shelving constructed mezzanine system consist of 14 bays of widespan rack to be removed.
FA8604-19-R-8117
Questions Set 1 05/09/19
RE: Appendix “C” –
Q4. 3.2.12.3.1 – would LED fixtures be accepted over fluorescent?
Yes that is acceptable.
Q5. 3.2.12.3.2. – confirm there is only 1 switch for the lighting
There is only 1 switch for the lighting.
Q6. 3.2.12.7 – confirm only the (1) row will be protected as a secure area
Only one row will be protected as a secure area as shown on AF Drawing GWH803-01.
RE: Appendix “D” -
Will the roll up door be required to be fire rated?
No.
Q7. Is the AC unit mentioned in 3.3.5. the same as the units required for the (2) modular offices in 3.2.18.?
One AC unit per modular office.
Q8. Or is this an additional unit?
RE: Appendix “E” –
Q9. 3.2.7.1. – are 5 hook waterfall hooks acceptable?
5 hook waterfall hooks are acceptable.
Q10. Or is there a different configuration you are wanting?
RE: 3.1.7. - GOV'T HAS REQUESTED A JLG MODEL 10MSP.
HOWEVER 3.1.7.3. SPEC ASKS FOR 500# CAPACITY PLATFORM AND 28" X 48" PLATFORM. THAT
CAPACITY & PLATFORM SIZE RELATES TO A 15MSP.
See revision in Cover PD (REV 3) section 3.1.7.2 “The combined operator and pick platform shall be a minimum of 20 inches by 27 inches. The platform capacity shall be a minimum 350 pounds. The carry deck capacity shall be a minimum 250 lbs.”