QA_Set_2_Whiteman.pdf

PDF 76 KB Posted

Attached to
MMHS Materials Handling System, Whiteman AFB Missouri Federal contract opportunity
Solicitation number
FA8604-19-R-8117
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to MMHS Materials Handling System, Whiteman AFB Missouri, newest first.
File Type Posted
FA860419R8117007.pdf PDF
GWH803-01.dwg DWG drawing
FA860419R8117006.pdf PDF
QA_Set_6_Whiteman.pdf PDF
FA860419R8117005.pdf PDF
QA_Set_5_Whiteman.pdf PDF
GWH803-01.dwg DWG drawing
QA_Set_4_Whiteman.pdf PDF
FA860419R8117004.pdf PDF
QA_Set_3_Whiteman.pdf PDF
GWH803-01.dwg DWG drawing
FA860419R8117003.pdf PDF
FA860419R8117002.pdf PDF
QA_Set_1_Whiteman.pdf PDF
GWH803-03.dwg DWG drawing
GWH803-01.dwg DWG drawing
FA860419R8117001.pdf PDF
GWH803-01.dwg DWG drawing
GWH803-02.dwg DWG drawing
Proposal_Checklist.Pricing_Summary_Sheet.pdf PDF
RFP_FA8604-19-R-8117.pdf PDF
GWH803-03.dwg DWG drawing
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8604-19-R-8117

Questions Set 2 05/15/19 Q1. What are all required conveyor dimensions necessary to meet the specifications? There are no dimensions on the drawings.

Reference App-F, paragraph 3.2.3. INTERFACE:

• It states: these units must interface with the tine cut-out openings, conveying height, and physical dimensions of the existing gravity conveyor. And also the existing gravity conveyor and dunnage.

Section 3.2.4 and 3.2.11 in App F references the dimensional requirements. Dimensions were added to AF Drawing GWH803-01 showing the dimensions of the existing GRC.

Then in the TPQ’s, item 12. Reference paragraph 3.2.3.:

• It states: these pallet trucks are to interface with: (a) both wide and narrow lift conveyors, (b) the pre-pack dock conveyor, (c) vault conveyor, and the (d) refrigerator conveyor. These are not identified or shown on any of the drawings.

Updated TPQ item 12. It now states, “Will the pallet jacks interface with the tine cut-out openings, conveying height, and physical dimensions of the existing gravity conveyor as specified? “ See Appendix

F (REV 1)

File details come from the government source that posted it.