Question_Set_1.pdf

PDF 219 KB Posted

Attached to
Storage Aid System at Holloman AFB, NM Federal contract opportunity
Solicitation number
FA8604-18-R-8104
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Storage Aid System at Holloman AFB, NM, newest first.
File Type Posted
FA8604-18-R-8104_0004.pdf PDF
Question_Set_5.pdf PDF
Question_Set_4_.pdf PDF
FA8604-18-R-8104_0003.pdf PDF
FA8604-18-R-8104_0002.pdf PDF
Question_Set_3.pdf PDF
Question_Set_2.pdf PDF
FA8604-18-R-8104_0001.pdf PDF
RFP_FA8604-18-R-8104.pdf PDF
RFP_FA8604-18-R-8104.pdf PDF
AHL706-04.dwg DWG drawing
AHL706-02.dwg DWG drawing
AHL706-05.dwg DWG drawing
AHL706-01.dwg DWG drawing
Proposal_Checklist-Pricing_Summary_Sheet.docx DOCX document
AHL706-03.dwg DWG drawing
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

28 February 2018

Question Set 1

Question 1: Drawing -04 and -05 both have Type "I" Widespan. -04 says the widespan is 36" deep, -05 says the widespan is 48" deep. Is the specific section of type "I" widespan on drawing -04 36" and the rest is all 48"?

Response: The Type "I" Wide-Span in Drawing -04 has been changed to Type "J" to match the lettering used in Drawing -05. No dimensions have been changed, just the terminology.

Question 2: Also, both drawings -04 and -05 state solid steel decking for the widespan but the spec 3.2.4 of Appendix B states wire mesh decking. Which is correct?

Response: Types "A" and "B" wide-span shall have the wire mesh decking already specified. Types "I" and "J" wide-span shown in drawings -02, -04, and -05 shall have solid decking; specification for this decking have been added to Appendix B.

Question 3: For the wire partition cages in App J is a ceiling required?

Response: Yes, a ceiling is required for the wire partitions cages specified in Appendix J.

Question 4: App G Modular Office, para 3.3.4 communication service, is the contractor running cable from the outlets to a tie in point outside the office or all the way to the communication room? If to the communication room, what is the approx. distance from the office?

Response: The contractor shall run cables from the office to the communications room which will not exceed 75 feet (not including risers).

Question 5: App A para 3.2.9 forklift guard posts states that the bollards are shown on drawing -01 and - 05, however the only drawing that shows bollards is drawing-04 (QTY 2). Please advise.

Response: Drawings -01 and -05 have been updated to include the referenced bollards. Drawing -01 has a total of 13, -04 has a total of 3, and -05 has a total of 5.

Question 6: There are no depth dimensions for Type "E" or Type "F" Pallet Rack on drawing AHL706-01.

Please advise.

Response: Type "E" and Type "F" pallet racks shall both be 48"D, Drawing -01 has been updated to clarify this dimension.

*Note this updated drawing shall encompass this update and the bollards question referenced earlier*

Question 7: Type "I" Wide Span shelving shows a depth of 4'-0" on AHL706-02 and 3'-0" on AHL706-05.

Will Type "I" have different depths in each building?

Response: The Type "I" Wide Span should be 36"D, Drawing -02 has been corrected to show this.