FA8604-18-R-8104_0003.pdf
PDF 787 KB Posted
- Attached to
- Storage Aid System at Holloman AFB, NM Federal contract opportunity
- Solicitation number
- FA8604-18-R-8104
About this file
RFP Amendment FA8604-18-R-8104 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8604-18-R-8104_0004.pdf | ||
| Question_Set_5.pdf | ||
| Question_Set_4_.pdf | ||
| FA8604-18-R-8104_0002.pdf | ||
| Question_Set_3.pdf | ||
| Question_Set_2.pdf | ||
| Question_Set_1.pdf | ||
| FA8604-18-R-8104_0001.pdf | ||
| RFP_FA8604-18-R-8104.pdf | ||
| RFP_FA8604-18-R-8104.pdf | ||
| AHL706-04.dwg | DWG drawing | |
| AHL706-03.dwg | DWG drawing | |
| AHL706-01.dwg | DWG drawing | |
| Proposal_Checklist-Pricing_Summary_Sheet.docx | DOCX document | |
| AHL706-02.dwg | DWG drawing | |
| AHL706-05.dwg | DWG drawing |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
See Block #2
PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ.NO.
5. PROJECT NO. (If applicable)
6. ISSUED BY AFLCMC/PZIEB CODE FA8604 7. ADMINISTERED BY (If other than Item 6) CODE
USAF/AFMC/AFLCMC
AF LIFE CYCLE MANAGEMENT CENTER
2275 D STREET, BLDG 16, RM 128
WRIGHT-PATTERSON AFB OH 45433-7228
MICHAEL W. WILKERSON 937-656-7519
michael.wilkerson.7@us.af.mil
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
FA8604-18-R-8104
X
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X )
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM
10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Non-ACAT, MMHS, Storage Aids System, Holloman AFB, NM - Amendment 0003 - Revision 1 to Attachment 8 (Appendix G Modular Office) and Attachment 15 (Drawing AHL706-04). This Request For Proposal date is hereby extended to 30 March 2018 by 2:00 PM EST. The last day for questions is due by 22 March 2018 by 2:00 PM EST.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print).
16A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
(Signature of person authorized to sign)
BY________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)
PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.15.4 FAR (48 CFR) 53.243 Created 14 Mar 2018 10:06 AM
SCHEDULE
FA8604-18-R-8104 0003
SECTION A - SOLICITATION FORM:
1. PURPOSE: This solicitation amendment to FA8604-18-R-8104 is issued to revise Attachment #8 and Attachment #15, and to extend the Request For Proposal due date to 30 March 2018 by 2:00 PM EST. The last day for questions is due by 22 March 2018 by 2:00 PM EST.
2. SUMMARY OF CHANGES:
a. Section J - Attachments/Exhibits:
1. Attachment 8, Appendix G Modular Office, has been revised to include REV 1, dated 13 March 2018.
2. Attachment 15, Drawing AHL706-04, has been revised to include REV 2, dated 13 March
2018.
**This Request For Proposal date is hereby extended to 30 March 2018 by 2:00 PM EST.
The last day for questions is due by 22 March 2018 by 2:00 PM EST.
All other terms and conditions of this solicitation remain the same.
CONTRACT DOCUMENTS, EXHIBITS AND ATTACHMENTS
FA8604-18-R-8104 0003
DOCUMENT PGS DATE TITLE
ATTACHMENT 8 15 13 MAR 2018 APPENDIX G (REV 1) FOR MODULAR OFFICE AT
49TH LOGISTICS READINESS SQUADRON,
BUILDINGS 310, 311, 809, AND 310
OUTBUILDINGS, CSN: AHL706
ATTACHMENT 15 1 13 MAR 2018 DRAWING AHL706-04 (REV 2)
Holloman AFB, NM – App G - Page ii
APPENDIX G
FOR
MODULAR OFFICE
AT
HOLLOMAN AIR FORCE BASE, NEW MEXICO
BUILDING 809
CSN: AHL706
DATE: 1 NOVEMBER 2017
REVISION 1: 13 MARCH 2018
PREPARED BY:
James F. Rowland
JAMES F. ROWLAND
PROJECT ENGINEER
AFLCMC/EZPAE
Brad Thompson Brad Thompson
REVIEWER
AFLCMC/EZPAE
FA8604-18-R-8104 0003 Attachment 8 Page 1 of 15
Holloman AFB, NM – App G - Page iii
Table of Contents
1. SCOPE
2. APPLICABLE DOCUMENTS
3. REQUIREMENTS
3.1. SYSTEM DESCRIPTION
3.2. PHYSICAL AND PERFORMANCE CHARACTERISTICS
3.2.1. DIMENSIONS
3.2.2. STRUCTURE
3.2.3. FLOOR
3.2.4. BASE PLATES
3.2.5. BASE TRIM
3.2.6. POSTS
3.2.7. PANELS
3.2.7.1. PANEL CORE
3.2.7.2. PANEL SURFACE
3.2.8. WINDOWS
3.2.9. PANEL CAPS
3.2.10. DOORS
3.2.11. ROOF DECK
3.2.12. CEILING
3.2.13. FORKLIFT GUARDRAILS GUARD POSTS REV1
3.2.14. FIRE SUPPRESSION SYSTEM
3.2.15. FIRE EXTINGUISHER CABINET
3.2.16. EXIT SIGNS
3.2.17. AIR CONDITIONER PANELS
3.3. ELECTRICAL CHARACTERISTICS
3.3.1. LIGHT FIXTURES
3.3.2. LIGHT SWITCHES
3.3.3. ELECTRICAL OUTLETS
3.3.4. COMMUNICATION SERVICE
3.3.5. AIR CONDITIONING (A/C) UNITS
4. QUALITY ASSURANCE PROVISIONS
4.1. INSPECTIONS
4.2. TEST
4.3. CERTIFICATIONS
FA8604-18-R-8104 0003 Attachment 8 Page 2 of 15
Holloman AFB, NM – App G - Page 1
1. SCOPE
This appendix establishes the minimum performance, design, fabrication, installation, and test requirements for one Modular Office for Bldg 809 at Holloman AFB, NM. The work shall be completed in accordance with this appendix, the Cover Purchase Description (PD), and Air Force (AF) Drawing AHL706-04. This appendix covers all equipment, materials, and labor necessary to complete installation of the system.
2. APPLICABLE DOCUMENTS
Applicable documents shall be in accordance with Section 2 of the Cover PD.
3. REQUIREMENTS
3.1. SYSTEM DESCRIPTION
The Contractor shall provide one modular office as shown on AF Drawing AHL706-04. The modular office will function as the central receiving, staging, and processing point for small and medium sized property. The modular office shall provide an environmentally controlled area to shelter and protect Government-furnished computer workstations and bar code reading stations.
3.2. PHYSICAL AND PERFORMANCE CHARACTERISTICS
3.2.1. DIMENSIONS
The modular office shall be a minimum 24 feet long by 20 feet wide by no greater than 10 feet high. The interior clear height of the modular office shall be a minimum of 8 feet from the floor to the ceiling.
3.2.2. STRUCTURE
The modular office shall be a freestanding, pre-fabricated, pre-wired, modular structure. The walls shall consist of panels connected to posts for ease of assembly. All panel connections shall allow the wall panels to be connected to one another making the wall structure totally non-progressive to the extent that any panel can be easily removed and/or replaced without disturbing the adjacent wall panels or the ceiling support structure. All construction materials shall be non-combustible.
3.2.3. FLOOR
FA8604-18-R-8104 0003 Attachment 8 Page 3 of 15
Holloman AFB, NM – App G - Page 2
The modular office shall use the existing concrete slab floor of the installation site. The floor of the modular office shall be covered with a direct glue, fire retardant, minimum 20 ounce nylon roll or equivalent flooring material that complies ETL 07-
4. A sample of standard colors shall be provided with the shop drawings for selection by the Contracting Officer’s Technical Representative (COTR). No carpet tiles shall be used in the construction of the floor of the modular office.
3.2.4. BASE PLATES
The base plates shall be anodized aluminum channel or angle extrusion, steel channels, or equivalent as approved by the COTR. The base plates shall support and secure the panels specified 3.2.7. The base plates shall be anchored to the floor in accordance with 3.3.2.3 of the Cover PD. The base plates shall be pre-cut and pre-mitered for ease of assembly and leveling. Any gap between the base plate and the floor shall be sealed by caulking with a non-shrinking material.
3.2.5. BASE TRIM
The base trim shall be rubber, vinyl, or equivalent as approved by the COTR. The base trim shall be attached to both the interior and exterior base perimeter of the modular office to provide a finished appearance. The base trim shall be easily removable clip-on or screw-on type and have no exposed screws or fasteners.
3.2.6. POSTS
The posts shall be anodized aluminum extrusions alloy 6063-T5 or equivalent as approved by the COTR. The posts shall permit connection of wall panels to one another allowing for one-, two- , three-, or four-way panel junctions. The posts shall be the major structural elements and shall support loads up to 3,500 pounds each. The posts shall provide an aesthetic contrast/match to the panel facings. The posts shall act as channeled raceways for electrical and communication lines. All interior post extrusions shall be factory die-cut to provide openings for a full range of electrical and communication outlet options. All posts shall have a clear anodized finish coating for carefree maintenance.
3.2.7. PANELS
The panels shall be modular and interchangeable with a minimum thickness of three inches. Panel construction shall consist of
FA8604-18-R-8104 0003 Attachment 8 Page 4 of 15
Holloman AFB, NM – App G - Page 3 an inner insulating core permanently laminated to an outer skin.
Panels shall be installed square and level on all four sides.
The panels shall be completely fabricated at the factory and ready for installation without additional on-site labor. Panels shall not be spliced together. The panels shall meet UL Class A fire-rating with a 0-25 flame spread.
3.2.7.1. PANEL CORE
The panels shall have an insulating polystyrene core with a minimum insulating factor of R-11. The panels shall provide at least a 30 dB(A) sound reduction for the offices.
3.2.7.2. PANEL SURFACE
The panel surface shall be a minimum of 3/8-inch thick tempered hardboard or minimum 5/8-inch thick gypsum board (type X). The panel surface shall be durable and impact resistant. The panel surface shall have a durable vinyl cover with a clear embossed sheet permanently laminated to the finish or equivalent as approved by the COTR. Interior finishes shall comply with Life Safety Code (LSC) 101, Chapter 10. A selection chart of standard interior and exterior finishes shall be provided with the shop drawings for selection by the COTR.
3.2.8. WINDOWS
Windows shall be installed in panels as shown on AF Drawing AHL706-04. Windows shall be of the picture-window type.
The window glass shall be a minimum 3/16-inch thick clear, tempered safety glass premounted in an aluminum frame.
Windows shall be a nominal 40 inches in height and extend across the full width of its supporting panel. The window sill height shall be no less than 35 inches and no greater than 42 inches from the floor.
3.2.9. PANEL CAPS
Anodized aluminum panel caps or manufacturer's standard panel caps incorporating a vertical fascia shall be installed securely on the top perimeter of the wall panels. The panel caps shall provide a neat appearance where the wall panels and roof deck come together.
3.2.10. DOORS
FA8604-18-R-8104 0003 Attachment 8 Page 5 of 15
Holloman AFB, NM – App G - Page 4
The modular office shall have a total of two personnel doorways installed in accordance with AF Drawing AHL706-04. All doors shall be prehung at the factory and assembled into panels or equivalent as approved by the COTR to ensure easy installation and proper fit. Doors shall be a nominal 36 inches wide by 89 inches high and have a minimum thickness of 1-1/2 inches. The interior and exterior finish of the doors shall match the exterior finish of the wall panels or have the same finish on both sides as approved by the COTR to provide an aesthetic contrast to the wall panels. Door edges shall be protected with an anodized aluminum edge molding. Door jambs shall have a door threshold and a vinyl or felt gasket around the entire opening.
Doors shall swing in the direction indicated on AF Drawing AHL706-04. Doors shall be arranged to be opened readily from the egress side whenever the modular offices are occupied. All doors shall be equipped with a key-in-knob lockset. Locks shall not require the use of a key, a tool, or special knowledge or effort for operation from the egress side. The locksets on each modular office shall be keyed alike; but differently from the other modular office. The upper half of all doors shall have a minimum 3/16-inch thick clear tempered safety glass picture-window type window. All doors shall meet UL Class A Fire Rating with a 0-25 flame spread and a minimum 30 dB(A) sound reduction for the offices.
3.2.11. ROOF DECK
The roof deck shall be pre-painted roll-formed ribbed steel interlocking panels. The roof deck panels shall have a minimum 22-gauge wall thickness. Panels shall be designed to achieve optimum structural efficiency. The roof deck shall span the full length and width of the modular office. Rubber seals shall be inserted in the roof flutes to contain heated or conditioned air.
3.2.12. CEILING
The ceiling shall be suspended from the roof deck and supported by the wall perimeter or in accordance with the manufacturer's standard installation procedures. The suspended ceiling shall consist of white enameled T-bar ceiling grid hung from wires, white vinyl-faced fiberglass or mineral fiber tiles with a random-fissured finish, and light fixtures as specified in
3.3.1. The ceiling panels shall be 2 feet wide by 4 feet long by minimum 5/8-inch thick lay-in acoustical panels or equivalent as approved by the COTR. The ceiling structure shall meet UL Class A Fire Rating with 0-25 flame spread. A six-inch
FA8604-18-R-8104 0003 Attachment 8 Page 6 of 15
Holloman AFB, NM – App G - Page 5 fiberglass, unfaced, batt insulation with at least an R-19 insulating factor, meeting the requirements UFC 3-600-01, Section 2-7, shall be installed above the ceiling panels. The T-bar ceiling grid shall provide support for the light fixtures and shall be supported at each corner of each light fixture.
3.2.13. FORKLIFT GUARDRAILS GUARD POSTS REV1
The forklift guardrails shall protect the modular offices against being bumped or damaged by at least a 4,000 pound capacity forklift. Guard rails shall not to impede the means of egress from the office. The guardrails shall be located as shown on AF Drawing AHL706-04. The guardrail shall not be attached in any way to the in-checking modular offices. The guardrail shall be attached to the floor with a minimum of 7/8-inch diameter by 4-1/2-inch long anchor bolts. Supports for the guardrail shall be all steel construction and shall not be spaced more than 10 feet apart. Guardrails shall be made of steel channel iron, I-beam, or equivalent as approved by the COTR. The top of the guardrail shall be a nominal 36 inches above ground level.
A steel pipe guard post shall be provided as shown on AF Drawing AHL706-04. The guard post shall extend a minimum 3 feet above the floor and shall be installed in such a manner that it does not interfere with the normal usage of the modular office. A cap shall be installed on the top of the guard post. The guard posts shall protect the corner of the moduar office from an accidental impact with a 4,000 pound capacity forklift. Each forklift guard post shall be anchored to the floor with a minimum of four anchor bolts in accordance with 3.3.2.3. of the Cover PD. The guard post shall be painted safety yellow.
3.2.14. FIRE SUPPRESSION SYSTEM
The Contractor shall design and install a wet-pipe fire suppression system in the in-checking modular office in accordance with NFPA 13 and applicable fire codes at Holloman AFB, NM. All appendices of NFPA 13 will be considered to be a part of the main body of the standard; all "shoulds" will be considered "shalls" in this project. Sprinkler size, spacing and location shall be in accordance with NFPA 13, and designed for occupancy classification Ordinary Hazard (Group 1) as defined in NFPA 13. Sprinkler heads and piping shall be located so not to be susceptible to damage or interfere with normal operations in the in-checking modular offices. The Contractor
FA8604-18-R-8104 0003 Attachment 8 Page 7 of 15
Holloman AFB, NM – App G - Page 6 shall install the piping above the suspended ceiling with only the sprinkler heads protruding through the ceiling panels. The Contractor shall connect the fire suppression system to the existing system piping at the most economical point permitted by NFPA 13 criteria and approved by the COTR. The Contractor shall provide a minimum of five days prior notification to Civil Engineering Offices prior to connecting to existing system.
The Contractor shall perform a test on the existing system to determine flow and pressure characteristics and design a system compatible with the existing system.
To allow for future water supply degradation, a 5-psi safety margin shall be provided between the in-checking modular office sprinkler system demand pressure and water supply pressure at the calculated combined roof-level and modular office design flow rate. The proposed sprinkler design, with supporting hydraulic calculations, shall be approved by the COTR prior to initiation of any work on the fabrication or installation of the sprinkler system. Prior to impairing the existing system for connection of the mezzanine sprinkler system, the Contractor shall notify the Base Fire Department. The existing fire suppression system shall not be inoperative for any time longer than that required to make the required connections.
The fire suppression design and hydraulic calculations shall be sealed by a qualified registered Professional Engineer or a R.M.E. (NICET Level IV) technician.
3.2.15. FIRE EXTINGUISHER CABINET
The Contractor shall provide one fire extinguisher cabinet in each modular office as shown on AF Drawing AHL706-04. Each cabinet shall have a nominal dimension of 8-1/2 inches deep x 12 inches wide x 27 inches high. The top of the cabinet shall be 48 to 50 inches above floor level.
3.2.16. EXIT SIGNS
The Contractor shall provide an illuminated exit sign with battery backup meeting the requirements of LSC 101 above all exits.
3.2.17. AIR CONDITIONER PANELS
Air conditioner (A/C) panels shall be located in accordance with AF Drawing AHL706-04. The A/C panels shall be of solid construction, but shall be modified at the site to accommodate
FA8604-18-R-8104 0003 Attachment 8 Page 8 of 15
Holloman AFB, NM – App G - Page 7
Contractor furnished A/C units. The A/C panels shall have reinforced openings to support a minimum 150 pound A/C unit and shall be lined with aluminum trim. There shall be at least 60 inches between the floor and the bottom of the A/C opening.
3.3. ELECTRICAL CHARACTERISTICS
Electrical service shall be provided as shown on AF Drawing AHL706-04 and 3.2.1. of the Cover PD. The Government-furnished power source is located as shown on AF Drawing AHL706-04.
3.3.1. LIGHT FIXTURES
All light fixtures shall be recessed in the ceiling. The lay-in light fixtures shall be 2 feet wide by 4 feet long. Light fixtures shall be energy efficient T-8 fluorescent lighting fixtures with a 160 watt capacity and equipped with diffuser lens and lamps. The appropriate quantity of light fixtures shall be located in the ceiling such that a minimum of 50 foot candles lighting at a height of 3 feet from the floor is evenly maintained throughout the modular offices.
3.3.2. LIGHT SWITCHES
A light switch shall be provided at each doorway. Light switches shall be located on the interior wall and opposite the door hinges. Light switches shall be conveniently placed for easy access. Light switches shall be located 52 inches plus or minus 2 inches in height from the floor. Light switches shall be provided with recessed cover plates. Light switches shall conform to the National Electric Code.
3.3.3. ELECTRICAL OUTLETS
Wall and power pole outlets shall be standard 110 volt AC duplex outlets. Wall outlets and power poles shall be located as shown on AF Drawing AHL706-04. Wall outlets shall be a nominal 12 inches in height from the floor. Each power pole shall be installed with a minimum of 10 feet of flex conduit available to allow easy relocation in the event equipment or operational constraints require changes to initial location. A 220 volt outlet shall be installed near the A/C panels at a height of at least sixty inches to interface with the A/C power cord.
3.3.4. COMMUNICATION SERVICE
Each modular office shall have phone outlets and communication outlets installed as shown in AF Drawing AHL706-04. Each wall
FA8604-18-R-8104 0003 Attachment 8 Page 9 of 15
Holloman AFB, NM – App G - Page 8 mounted phone outlet shall be connected with one 4-pair, CAT 6 plenum, 24-gauge cable. Each communication outlet shall be connected with 4-pair, CAT 6 plenum, 24-gauge cable to support phone instruments and computer terminals. All work shall be done in accordance with AFM 88-15. Contractor shall obtain final approval for final connection to existing base communication system from the COTR.
3.3.5. AIR CONDITIONING (A/C) UNITS
The contractor shall provide a self-contained, thermostatically adjustable Air conditioning (A/C) unit for the In-Checking Modular Office. The A/C unit shall comply with UFC 3-600-01, Section 2-11. The unit shall be sufficiently sized so as to provide a comfortable working environment for the personnel assigned to the office areas. The unit shall be capable of maintaining a minimum 30 degree Fahrenheit difference between the outside and inside temperatures. A/C ducts shall be properly sized and located to minimize drafts on office personnel. Controls for the unit shall be mounted in an easily accessible location. The thermostat shall have a clear locked cover so that only authorized personnel can adjust the temperature setting. The contractor shall provide a means to properly handle the condensate removed during the conditioning process. The condensate shall not cause damage to property or pose a health hazard to warehouse personnel. The air conditioning unit shall be UL approved and energy star rated.
4. QUALITY ASSURANCE PROVISIONS
4.1. INSPECTIONS
The system shall be inspected to verify that it meets all the requirements of sections 1, 2, and 3 of this appendix and the Cover PD. These inspections shall be completed as part of the system checkout test and again as a part of the quality conformance test.
4.2. TEST
The following test shall be performed on the system as part of the system checkout test and again as a part of the quality conformance test.
No. Paragraph Description
FA8604-18-R-8104 0003 Attachment 8 Page 10 of 15
Holloman AFB, NM – App G - Page 9
1. 3.3.1. Measure with a light meter the light intensity inside the modular office. If the light intensity inside the modular office is not at least 50 foot candles, then the system shall fail the test.
4.3. CERTIFICATIONS
The Contractor shall provide certification that the following requirements have been met. All certifications shall be provided in accordance with the Contract Data Requirements List.
No. Paragraph Certifications
1. 3.2.2. All construction materials are non-combustible.
2. 3.2.7.
3.2.11.
3.2.13.
All panels, doors and ceiling structures meet UL Class A Fire Rating with a 0-25 flame spread.
3. 3.2.7.
3.2.11.
All panels and doors are sound reducing (up to 30 dB(A) drop over outside conditions).
4. 3.2.7.1. All panels have a minimum insulation factor of R-11.
5. 3.2.13. All ceiling insulation has a minimum factor of R-19.
6. 3.2.15. Certify sprinkler design.
FA8604-18-R-8104 0003 Attachment 8 Page 11 of 15
TECHNICAL PROPOSAL QUESTIONNAIRE
FOR A
Holloman AFB, NM - App G - Modular Office TPQ - Page 1 of 4
IN-CHECKING MODULAR OFFICE
Solicitation Number: F33600- -R- Project Title: Storage Aid System Base: Holloman AFB, NM CSN: AHL706 Appendix G, Modular Office, 1 November 2017
This questionnaire shall be completed by the Offeror. All entries to this questionnaire shall be typed. The questionnaire will be used to determine the Offeror's understanding of the requirements and acceptability of the proposed equipment.
Please attach product literature/cut sheets for all equipment detailed in this questionnaire and attach any exceptions to the Purchase Description Appendix as detailed below.
Modular Offices Manufacturer:
Model Number:
Paragraph Characteristics
3.2.1. Modular Office Dimensions:
Length: ________________ ft. ______________ in.
Width: _________________ ft. ______________ in.
Height: ________________ ft. ______________ in.
Lower Level Interior Clear Height:
_________________________ ft. _______________ in.
3.2.2. Is the wall structure such that any panel can be
easily removed and/or replaced without disturbing the adjacent wall panels or the ceiling support structure? YES NO
Are construction materials noncombustible?
YES NO
3.2.3. Type(s) of flooring provided:
Lower level: ___________________________________
FA8604-18-R-8104 0003 Attachment 8 Page 12 of 15
Solicitation Number: FA8604- -R-
Holloman AFB, NM - App G - Modular Office TPQ - Page 2 of 4
3.2.6. Are posts the major structural element capable of
supporting loads up to 3,500 pounds each?
Are posts the channeled raceways for electrical and communication lines? YES NO
Are posts clear anodized finished? YES NO
3.2.7. Total panel thickness: __________________inches
Will the panels provide at least a 30 dB(A) sound reduction over outside conditions as specified?
3.2.7.2. Panel surface thickness/type: __________________
3.2.8. Window type(s) provided: _______________________
Dimension(s): __________________________________
Are window locks provided? YES NO
3.2.9. Are panels modified as shown on AF Drawing(s)
AHL706-04 and framed in aluminum? YES NO
Are plastic strip door(s) provided?
3.2.11. Number of doorways provided: ___________________
Dimensions: ____________________________________
Will the doors provide at least a 30 dB(A) sound reduction over outside conditions as specified?
YES NO
Are the following provided as specified:
Door threshold with gasket YES NO
Key-in-knob lockset YES NO
3.2.12. Are rubber seals provided? YES NO
FA8604-18-R-8104 0003 Attachment 8 Page 13 of 15
Holloman AFB, NM - App G - Modular Office TPQ - Page 3 of 4
3.2.13. Are Glass fiber, unfaced, batt insulation with at
least an R-19 insulating factor provided?
3.2.14. Are forklift guardrails provided? YES NO
3.2.15. Is a fire suppression system provided?
3.2.17.
Are exit signs provided as required?
3.2.18. Number of A/C panels provided: _________________
Minimum capacity: _______________________ pounds
3.3.1. Are light fixtures provided as required?
3.3.2. Are light switches provided as required?
3.3.3. Wall and power pole outlets YES NO
220 volt a/c outlet(s) YES NO
3.3.4. Are phone and communication outlets provided as
required? YES NO
THIS AREA LEFT BLANK INTENTIONALLY
FA8604-18-R-8104 0003 Attachment 8 Page 14 of 15
Holloman AFB, NM - App G - Modular Office TPQ - Page 4 of 4
EXCEPTIONS
Attach any exceptions taken to the Purchase Description Appendix. Please outline those concerns in detail. Your exceptions will be reviewed to determine acceptability.
Are exceptions taken? YES NO
Number of pages attached: ____________________________________
FA8604-18-R-8104 0003 Attachment 8 Page 15 of 15
FA8604-18-R-8104 0003 Attachment 15 Page 1 of 1
| SCOPE |
| APPLICABLE DOCUMENTS |
| REQUIREMENTS |
| System description |
| Physical and Performance Characteristics |
| Dimensions |
| Structure |
| Floor |
| Base plates |
| Base trim |
| Posts |
| Panels |
| Panel core |
| Panel surface |
| Windows |
| Panel caps |
| Doors |
| Roof deck |
| Ceiling |
| Forklift guardrails GUARD POSTS REv1 |
| Fire suppression system |
| fire extinguisher cabinet |
| eXIT sIGNS |
| Air conditioner panels |
| Electrical characteristics |
| Light fixtures |
| Light switches |
| Electrical outlets |
| Communication service |
| AIR CONDITIONING (A/C) UNITS |
| QUALITY ASSURANCE PROVISIONS |
| Inspections |
| Test |
| Certifications |
File details come from the government source that posted it.