*****DRAFT RFP 1442**** This is a DRAFT of the upcoming SABER solicitation. Please review and let us know your thoughts.

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
926001NN.11R.tiff TIFF file
H-004_CONTROLS.dgn —
H-001_LEGEND_AND_SCHEDULES.dgn —
H-002_DETAILS.dgn —
699981NM.06R.tiff TIFF file
039959NC.01R.tiff TIFF file
926001NC.01R.tiff TIFF file
926001NM.20R.tiff TIFF file
926001NM.18R.tiff TIFF file
699981NM.05R.tiff TIFF file
599951RA.01R.tiff TIFF file
0399591A.03R.tiff TIFF file
926001NA.09R.tiff TIFF file
926001NE.25R.tiff TIFF file
926001NM.17R.tiff TIFF file
926001NE.21R.tiff TIFF file
926001NM.13R.tiff TIFF file
-_0616_-_15-2025_page_2_of_2.dwg DWG drawing
579969NM.03R.tiff TIFF file
926001NN.32R.tiff TIFF file
699981NS.04R.tiff TIFF file
H-003_SCHEDULES.dgn —
926001NE.27R.tiff TIFF file
0399591A.02R.tiff TIFF file
A100.DWG DWG drawing
579969NA.01R.tiff TIFF file
926001NN.10R.tiff TIFF file
-_0616_-_15-2025_page_1_of_2.dwg DWG drawing
A400.dwg DWG drawing
OH160002_-7-8-2016.pdf PDF
OH160102_-7-8-2016.pdf PDF
FA860116R0010_RFP_-_SABER_Amendment_3.pdf PDF
SABER_Source_Selection_RFIs.pdf PDF
FA860116R0010_RFP_-_SABER.pdf PDF
FA860116R0010_RFP_-_SABER_Amendment_2.pdf PDF
Attachment_16_-_Seed_As-Builts.pdf PDF
Attachment_13_Addendum_Number_01_Doc.doc DOC document
FA860116R0010_RFP_-_SABER_Amendment.pdf PDF
Attachment_14_-_Seed_SOO_Addendum.pdf PDF
StateOfObjective_REVISED.pdf PDF
Attachment_9_-_SABER_RFP_Pricing_Worksheet.xlsx XLSX spreadsheet
FA860116R0010_RFP_-_SABER.pdf PDF
Attachment_2_-_SABER_WPAFB_Master_Specifications.pdf PDF
Attachment_6_DBA_WD_OH160114.pdf PDF
FINAL_Draft_RFP_Questions.docx DOCX document
Attachment_8_DBA_WD_OH150002.pdf PDF
Attachment_4_DBA_WD_OH150011.pdf PDF
Attachment_2_SABER_WPAFB_Master_Specifications.pdf PDF
Attachment_3_DBA_WD_OH150114.pdf PDF
Attachment_1_DRAFT_SABER_STATEMENT_OF_WORK.docx DOCX document
Show all 50

Simplified Acquisition of Base Engineering Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT: ZHTV151004, SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS (SABER), WRIGHT-PATTERSON AFB

THIS ACQUISITION IS SET ASIDE FOR 8(a) COMPETITION LIMITED TO 8(a) FIRMS LOCATED WITHIN THE GEOGRAPHICAL AREA OF THE STATE OF OHIO AND OTHER 8(a) FIRMS WITH BONAFIDE PLACE OF BUISNESS WITHIN THE GEOGRAPHICAL COMPETIIVE AREA, AND ASSIGNED NAICS CODE. ALL OTHER 8(A) BUSINESS DEVELOPMENT PARTICIPANTS ARE DEEMED INELIGIBLE TO SUBMIT OFFERS.

THE TOTAL AGGREGATE AMOUNT OF THE SABER IS $85M.

The insurance required for FARS 52.228-5 shall be IAW FAR 28.310.

EVAN E KAUFMAN 937-522-4576

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

27-Jan-2016

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

AFLCMC/PZIOCA - CONSTRUCTION SECTION A

POC: EVAN E KAUFMAN

1940 ALLBROOK DRIVE, ROOM 109

WRIGHT-PATTERSON AFB OH 45433-5344

FA8601

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

937-257-2825FAX:TEL: 937-522-4576 TEL: FAX:

FA8601-16-R-0010 67

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA8601-16-R-0010

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Project

IDIQ (SABER) - Ordering Period 1

FFP

Ordering Period: 14 June 16 - 13 June 17 The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration, restoration and/or new construction work on various real property facilities at WPAFB. Type of work the contractor can expect (not all inclusive): New construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JP-8 fuel systems and miscellaneous services including hazardous waste removal. All work is to be accomplished in accordance with the terms and conditions of the contract and the attachments listed in Section J.

The total value of orders placed during the ordering period covered by this CLIN shall comply with the constraints of the order limitations shown in FAR 52.216-19 and shall not exceed the overall contract maximum.

FOB: Destination

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Project

IDIQ (SABER) - Ordering Period 2

FFP

Ordering Period: 14 June 17 - 13 June 18 The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration, restoration and/or new construction work on various real property facilities at WPAFB. Type of work the contractor can expect (not all inclusive): New construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JP-8 fuel systems and miscellaneous services including hazardous waste removal. All work is to be accomplished in accordance with the terms and conditions of the contract and the attachments listed in Section J.

The total value of orders placed during the ordering period covered by this CLIN shall comply with the constraints of the order limitations shown in FAR 52.216-19 and shall not exceed the overall contract maximum.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Project

IDIQ (SABER) - Ordering Period 3

FFP

Ordering Period: 14 June 18 - 13 June 19 The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration, restoration and/or new construction work on various real property facilities at WPAFB. Type of work the contractor can expect (not all inclusive): New construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JP-8 fuel systems and miscellaneous services including hazardous waste removal. All work is to be accomplished in accordance with the terms and conditions of the contract and the attachments listed in Section J.

The total value of orders placed during the ordering period covered by this CLIN shall comply with the constraints of the order limitations shown in FAR 52.216-19 and shall not exceed the overall contract maximum.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 1 Project

IDIQ (SABER) - Ordering Period 4

FFP

Ordering Period: 14 June 19 - 13 June 20 The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration, restoration and/or new construction work on various real property facilities at WPAFB. Type of work the contractor can expect (not all inclusive): New construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JP-8 fuel systems and miscellaneous services including hazardous waste removal. All work is to be accomplished in accordance with the terms and conditions of the contract and the attachments listed in Section J.

The total value of orders placed during the ordering period covered by this CLIN shall comply with the constraints of the order limitations shown in FAR 52.216-19 and shall not exceed the overall contract maximum.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 1 Project

IDIQ (SABER) - Ordering Period 5

FFP

Ordering Period: 14 June 20 - 13 June 21 The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration, restoration and/or new construction work on various real property facilities at WPAFB. Type of work the contractor can expect (not all inclusive): New construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JP-8 fuel systems and miscellaneous services including hazardous waste removal. All work is to be accomplished in accordance with the terms and conditions of the contract and the attachments listed in Section J.

The total value of orders placed during the ordering period covered by this CLIN shall comply with the constraints of the order limitations shown in FAR 52.216-19 and shall not exceed the overall contract maximum.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006 1 Project OPTION 6-Month Option for Extension of Services

FFP

Ordering Period: 14 June 21 - 14 December 21 The contractor shall furnish all personnel, equipment, tools, materials, supervision and other items and services necessary to design, manage and accomplish a broad range of maintenance, repair, alteration, restoration and/or new construction work on various real property facilities at WPAFB. Type of work the contractor can expect (not all inclusive): New construction of buildings and structures, alteration and repair of buildings, structures, roads, grounds, roofs, specialty construction, utilities including JP-8 fuel systems and miscellaneous services including hazardous waste removal. All work is to be accomplished in accordance with the terms and conditions of the contract and the attachments listed in Section J.

The total value of orders placed during the ordering period covered by this CLIN shall comply with the constraints of the order limitations shown in FAR 52.216-19 and shall not exceed the overall contract maximum.

Section C - Descriptions and Specifications

PZIOC C-001

PZIOC C-001 - Descriptions and Specifications (NOV 2012)

All drawings, specifications, and addenda (if applicable) are included as attachments to this document as indicated in Section J, List of Attachments.

Section E - Inspection and Acceptance

PZIOC E-001

PZIOC E-001 - INSPECTION AND ACCEPTANCE (NOV 2012)

(IAW FAR 46.401(b) and 46.503)

Inspection and acceptance of the overall effort will be performed at Wright-Patterson AFB OH by 88 CEG/CEN.

(End of Clause)

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction AUG 1996 52.246-13 Inspection--Dismantling, Demolition, or Removal of

Improvements

AUG 1996

CLAUSES INCORPORATED BY FULL TEXT

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

(a) "Definition. Contracting officer's representative" means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.

(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.

(End of clause)

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 POP 14-JUN-2016 TO

13-JUN-2017

N/A 88 CEG CERF

CE COR

1450 LITTRELL RD

WRIGHT-PATTERSON AFB OH 45433-5209

937-000-0000 FOB: Destination

F4F2AA

0002 POP 14-JUN-2017 TO

13-JUN-2018

N/A (SAME AS PREVIOUS LOCATION)

FOB: Destination

F4F2AA

0003 POP 14-JUN-2018 TO

13-JUN-2019

N/A (SAME AS PREVIOUS LOCATION)

FOB: Destination

F4F2AA

0004 POP 14-JUN-2019 TO

13-JUN-2020

N/A (SAME AS PREVIOUS LOCATION)

FOB: Destination

F4F2AA

0005 POP 14-JUN-2020 TO

13-JUN-2021

N/A (SAME AS PREVIOUS LOCATION)

FOB: Destination

F4F2AA

0006 POP 14-JUN-2021 TO

14-DEC-2021

N/A (SAME AS PREVIOUS LOCATION)

FOB: Destination

F4F2AA

CLAUSES INCORPORATED BY REFERENCE

52.242-17 Government Delay Of Work APR 1984 52.247-34 F.O.B. Destination NOV 1991

Section G - Contract Administration Data

PZIOC G-002

PZIOC G-002 - CONTRACT HOLIDAYS (NOV 2012)

The following days are contract holidays: New Year’s Day; Martin Luther King’s Birthday; Presidents’ Day;

Memorial Day; Independence Day; Labor Day; Columbus Day; Veteran’s Day; Thanksgiving Day; Christmas Day.

(End of Clause)

CLAUSES INCORPORATED BY FULL TEXT

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)

(a) Definitions. As used in this clause--

Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.

Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.

(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:

(1) Document type. The Contractor shall use the following document type(s).

(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor's business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable”.)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Specified Per Individual Task Order Issue By DoDAAC FA8601 Admin DoDAAC FA8601 Inspect By DoDAAC F4F2AA Ship To Code F4F2AA Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) Service Acceptor (DoDAAC) FA8601 Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____

(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.

(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.

Contract Administrator Specified Per Individual Task Order Contracting Officer: Specified Per Individual Task Order Inspector: Specified Per Individual Task Order Additional Contact michael.burns.4@us.af.mil

(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Contract Administrator: 937-522-4578 or joshua.grubb@us.af.mil Contracting Officer: 937-522-4545 or kevin.parks.1@us.af.mil

(Contracting Officer: Insert applicable information or “Not applicable.”)

(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.

Section H - Special Contract Requirements

PZIOC H-008

PZIOC H-008 - GOVERNMENT DOWN TIME FOR VARIOUS AUTHORITIES INCLUDING THE

PRESIDENT, SECRETARY OF DEFENSE, SECRETARY OF THE AIR FORCE, AFMC/CC,

AFLCMC/CC, 88 ABW/CC, AND PROGRAM MANAGERS (NOV 2012)

(a) Base Closures Due to Emergencies. From time to time, the Center or Base Commander or other authority may decide to close all or part of the base in response to an unforeseen emergency or similar occurrence. Sample emergencies include, but are not limited to, adverse weather such as snow or flood, an act of God such as a tornado or earthquake, acts of war or terrorism, computer failures, or a base disaster such as a natural gas leak or fire.

Contractor personnel are “non-essential” for purposes of any instructions regarding the emergency.

(1) Contractor shall be officially dismissed upon notification of a base closure in accordance with paragraph b. Contractor shall promptly secure all government furnished property appropriately and evacuate in an expedient but safe manner.

(2) With regard to work under the contract, the Government shall retain the following options:

(i) Government may grant a time extension for any effort delayed by the closure equal to the time of the closure, subject to the availability of funds.

(ii) Government may forego the work. The Contractor will not be paid for work not performed. This shall be accomplished via Termination for Convenience of the Government or change order to descope work.

(iii) Government may reschedule the work on any day satisfactory to both parties.

(iv) In rare instances, Government may request that the Contractor continue on-site performance during the base closure period. Such a request shall be subject to agreement by Contractor.

(b) Base Closure Notification Procedures.

(1) After an official decision to close Wright-Patterson AFB has been made by the Base Commander, the following radio and television stations shall be notified of the closure:

Television:

WHIO 7

WDTN 2

WTJC 26

WKEF 22

Radio:

WHIO AM 1290 WBVE FM 96-5

WONE AM 98 WTUE FM 104.7

WBLY AM 1600 WBZI FM 95.3

WIZE AM 1340 WYSO FM 91.3

WLW AM 700 WYMJ FM 103.9

WDAO AM 1210 WFCJ FM 93.7

WING AM 1410 WHKO FM 99.1

WAZU FM 102.9 WVUD FM 99.9

(2) The Contractor is directed to listen or watch one of the radio or television stations listed in paragraph b.1 for a base closure. Contractor should follow instructions intended for non-essential personnel.

(3) The Contractor will not receive any other form of notification of a base closure from the Government.

The Contractor is responsible for notification of his or her employees.

(4) If the decision to close all or part of the base is made during the duty day, and the Base Commander’s decision is transmitted through official notification channels, the Contractor shall follow the instructions as given.

Contractor personnel shall notify their task monitor and act in accordance with the task monitor’s instruction.

(c) Base Closure Due to Non-Emergencies. The Center or Base Commander or other authority may elect to close all or part of the base for non-emergency reasons such as time-off award, base open house, etc. In the event of a non-emergency base closure, the Contract Task Monitor and the Contractor shall jointly choose a course of action..

(End of Clause)

PZIOC H-017

PZIOC H-017 – Options (NOV 2012)

The contractor grants to the Government options to acquire the supplies described in Section B as “Option Items”, and identified as CLINs 006 at the price set forth in the schedule. The Government may exercise said options unilaterally by giving the contractor written notice of intent to exercise an option at a minimum of 60 days prior to exercise of the option. Period of performance (see Schedule F) for each option CLIN will be from the Notice to Proceed issued after each unilateral modification.

(End of Clause)

PZIOC H-018

PZIOC H-018 - EMS TRAINING (NOV 2012)

Initial Environmental Management System awareness-level training is required for all personnel working on base at

WPAFB.

(a) The installation office responsible for providing the EMS training is 88 ABW/CEVY

(b) The training requires less than thirty minutes

(c) The EMS Awareness-level training shall be accomplished within thirty days of contract (or modification) award. New contract employees shall be trained within thirty days of starting work on the installation.

(d) The EMS Awareness-level training is available via the 88 ABW/CEVY website (https://wrigem.wpafb.af.mil/viewchild.cfm?id=228), which provides materials that meet the training requirement.

(e) Upon completion of the training, the contractor shall provide the AF program manager (PM) a list of the contractor employees' names and the date the training was completed.

(End of Clause)

PZIOC H-019

PZIOC H-019 Progress Meetings (NOV 2012)

The contractor shall be responsible for conducting project progress meetings at least every two weeks. The days and times shall be coordinated after contract award.

The meeting shall discuss at a minimum:

- Work elements completed or scheduled to be completed

- Open Requests for Information (RFI)

- Submittals

- Schedule discussion (Percentages scheduled to be complete/Percentages actually completed)

- Project Issues/Action Items

- Change Order Status

Progress meeting minutes shall be provided to all individuals attending and all other individuals deemed vital to the project. A sample format of the progress meeting minutes can be provided by AFLCMC/PZIOC upon request after contract award.

(End of Clause)

CLAUSES INCORPORATED BY FULL TEXT

AFLCMC/PZIO H-002 - Delivery Procedures Commercial Vehicles (JUL 2005)

All vehicles larger than a large pick-up truck are required to be inspected by the Wright-Patterson Air Force Base Commercial Vehicle Delivery Gate (CVDG) prior to entering the installation. Vehicles to be inspected include, but are not limited to, the following:

1. Step van/panel truck

2. Tractor/trailer, box and flat bed containing cargo

3. Tanker trucks

4. Box trucks

5. Tour buses

6. Garbage/recycled waste trucks

7. Concrete trucks/mixers, dump trucks

8. Cranes, recreational vehicles, petroleum tanker

This inspection will be conducted at Gate 16A located off State Route 444.

The following are exemptions to vehicles utilizing the CVDG:

1. If the vehicle has the product inside (concrete and asphalt trucks) and timely delivery is necessary due to product deterioration it does not need to enter the CVDG. To bypass the CVDG, the contractor shall submit a list containing drivers’ names, social security numbers and the state in which the driver's license is held for those drivers who will be entering the base. This shall be accomplished 24 hours prior to requested entry time. If entry is requested on Monday, this list must be submitted by Friday at 1630 hours. All lists shall be submitted to the 88th ABW/CE Directorate contract inspector. The only gates that may be used under this exemption shall be 15A, 26A, 38A, and gate 1B. If the driver's name is not on the list, he/she will not be allowed access to the installation through these gates and the base will not assume liability for denied access.

2. If a delivery vehicle must exit, and then re-enter the base to complete its route, the vehicle shall be resealed upon exiting the base. After initially passing through the commercial vehicle delivery gate, trucks shall be resealed at Gates 15A, 38A and 22B. The resealing of the trucks will allow them to continue to any other area of the installation (Areas A, B, or Kittyhawk) without reprocessing through the CVDG. To receive resealing assistance, the drivers shall physically stop at one of the three authorized gates and request the installation entry controller to reseal their truck and provide the next location of their delivery. The controller will reseal the truck and give the delivery driver a pre-clearance form. The driver shall present the pre-clearance form to the entry controller at the next point of installation entry. This reentry can be through any base gate.

Vehicles may be subject to an inspection at any of installation entry control points during a directed random antiterrorism measure (RAM.) Any commercial vehicle, regardless of size, can be directed to the CVDG at the discretion of the installation entry controller.

AFLCMC/PZIO H003—PROCEDURES FOR RETURNING GOVERNMENT-ISSUED IDENTIFICATION

CREDENTIALS (OCT 2013)

(a) It is the Contractor’s responsibility to ensure all Government-Issued Identification Credentials (GIIC) are safeguarded from loss, theft and misuse and returned to the Government when no longer required.

(b) The Contractor shall use the following procedures for returning GIIC including, but not limited to, the common access card (CAC), vehicle decals, Medical Center (MC) badges, and badges required for entry into facilities or controlled/restricted areas on Wright-Patterson Air Force Base (WPAFB).

(c) During the contract period of performance, the Contractor shall return GIIC to the issuing office within 7 working days of the earliest occurrence of any of the following events:

(i) any change in status of contractor or subcontractor personnel (e.g. resignation, suspension, termination, incarceration, death, etc.) such that personnel no longer require access to the installation;

(ii) expiration of GIIC;

(iii) expiration of the contract performance period including any option period regardless of any decision by the Government to exercise a subsequent option period; or

(iv) termination of the contract

(d) Within 7 days of a change in status of contractor or subcontractor personnel as described in paragraph (c)(i) above or upon expiration of GIIC when expiration occurs prior to the end of the contract performance period, the Contractor shall notify the Contracting Officer (CO) in writing to include the complete name of the individual(s) to whom the identification was issued, the type of identification issued, the identification number and the expiration date of the identification.

(e) The contractor shall report lost or stolen GIIC to the CO and issuing office within 24 hours of becoming aware of the loss or theft.

(f) Coordinating Return of GIIC:

(i) The Contractor’s Contract Manager (or Program Manager) shall be responsible for collecting

GIIC.

(ii) For return of GIIC obtained from the 88th Security Forces Squadron, Pass and Registration, the Contractor shall call (937) 257-6506 to schedule an appointment in time for return to be accomplished within the time frames specified in paragraph (c) above.

(iii) Pursuant to return of GIIC when a contract expires or is terminated, Pass and Registration will provide the Contractor with a letter verifying the return. The letter will also specify any GIIC that was not returned. The Contractor shall provide a copy of this letter to the CO.

(iv) The Contractor shall return GIIC obtained from the MC to the issuing office at the MC. The MC will provide the Contractor with a letter verifying the return. The letter will also specify any GIIC that were not returned. The Contractor shall provide a copy of this letter to the CO.

(g) Final invoices will not be processed for payment by the acceptor identified in the contract or order until the CO provides the acceptor with a copy of the letter(s) verifying return of GIIC. The Government may withhold monetary consideration from any invoice including the final invoice for failure to comply with the terms and conditions specified in this clause relative to return of GIIC.

(h) The Government reserves the right to consider the Contractor’s history of returning GIIC when evaluating past performance and responsibility for future awards. Failure to return GIIC may result in the Contractor being barred from WPAFB and subsequent ineligibility for future contract awards that require performance on

WPAFB.

(End)

Section I - Contract Clauses

PZIOC I-001

PZIOC I-001 - PREPARATION OF MATERIAL APPROVAL

SUBMITTALS (NOV 2012)

The materials and workmanship submittals shall be done in accordance with AF Form 3000 “Material Approval Submittal” instructions.

(End of clause)

PZIOC I-002

PZIOC I-002 - ENGLISH LANGUAGE REQUIREMENTS (NOV 2012)

(a) Deliver all documents in the English language.

(b) Provide an English language speaking person during on-site visits, inspections, reviews, audits, and other similar activities.

(End of clause)

PZIOC I-003

PZIOC I-003 - TYPES OF TASK ORDERS (NOV 2012)

Two type of task orders may be issued under this contract, priced and unpriced.

(a) Priced Task Orders. Priced task orders will be issued whenever the parties have agreed upon all the terms of the task order prior to issuance. Priced task orders shall contain the information as outlined on the Task Order Form (Attachment to this contract).

(b) Unpriced Task Orders. Unpriced task orders are those issued prior to agreement on total price, period of performance or delivery schedule. Unpriced task orders are issued to cover urgent requirements for services or supplies when there is not time to negotiate a priced task order. The contractor shall submit a Not-to-exceed (NTE) price prior to the issuance of an unpriced task order. Unpriced task orders shall contain the information as outlined on the Task Order Form attached to this contract which will specify the desired number of hours to perform the task, the NTE price, and a definitization schedule.

(End of Clause)

PZIOC I-004

PZIOC I-004 - TASK ORDER PROCEDURES (NOV 2012)

(a) The tasks identified in Section J, Statement of Work (SOW), of this contract are described in general terms. Individual tasks orders will be required from time to time to assign specifically defined tasks to the contractor.

(b) Orders shall be issued against the contract in writing, dated and labeled as “TASK NUMBER XXXX” on a DD Form 1155. Each order shall identify the specific task to be accomplished, the completion date and the required reports to be delivered upon completion. Each order shall contain a citation of funds from which payment shall be made and shall be signed by the Contracting Officer. An order is considered “issued” when the Government deposits the order in the mail or hands it to the contractor’s representative.

(c) Prior to issuance of a Task Order, the Contracting Officer will send a SOW to the contractor. The contractor shall submit within seven (7) days (or as specified in the Task Order request) a written plan for accomplishing the task requirements to the Contracting Officer. This implementation plan shall be at no additional cost to the Government. Each such plan shall be labeled "TASK NUMBER XXXX" IMPLEMENTATION PLAN" and shall include the following information as a minimum:

(1) The contractor's overall plan for accomplishing the task requirements of the SOW.

(2) Milestone associated with task accomplishment.

(3) Person hours to expended by labor category.

(4) A Not-to-Exceed (NTE) amount for material and travel expenses.

(d) The term "person hour" is hereby defined as the performance of one hour of "engineering and technical support services by one qualified contractor employee. Time spent in authorized travel from the contractor's facilities shall be considered as time spent in the performance of services hereunder.

(e) The person hour rates set forth in Section B shall be firm fixed price and shall include all direct and indirect costs (including direct labor, overhead, general and administrative expenses, and profit) associated with the performance of services acquired herein.

(f) Performance periods for individual Task Orders may cross fiscal years. Therefore, the contractor shall propose person hours to be expended for each fiscal year.

(g) The OPR will be responsible for evaluating the Contractor's Implementation plan and shall recommend (i) approval of the plan, (ii) approval of the plan after resolving problems, or (iii) disapproval of the plan. The Contracting Officer will enter into negotiations with the Contractor to resolve problems and determine price.

(h) During negotiations, the fixed price portion of the Task Order will be determined by multiplying the person hours agreed to by the hourly rate specified in the Section B. A not-to-exceed amount will be established for reimbursement of the material and travel expenses.

(i) . A certificate of current cost and pricing data shall be submitted when negotiations are complete.

(j) Following negotiations, an order shall be issued by the Contracting Officer on a DD Form 1155. Separate line items will be designed for a fixed price portion and for reimbursable material and travel expenses. Changes to the Order shall be issued by written modification by the Contracting Officer.

(End of Clause)

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions NOV 2013 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures MAY 2014 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity

MAY 2014

52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal

Transactions

OCT 2010

52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber

Content Paper

MAY 2011

52.204-7 System for Award Management JUL 2013 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-18 Commercial and Government Entity Code Maintenance JUL 2015 52.209-6 Protecting the Government's Interest When Subcontracting

With Contractors Debarred, Suspended, or Proposed for Debarment

OCT 2015

52.211-13 Time Extensions SEP 2000 52.215-2 Audit and Records--Negotiation OCT 2010 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards- Overtime

Compensation

MAY 2014

52.222-6 Construction Wage Rate Requirements MAY 2014 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records MAY 2014 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity APR 2015 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.222-30 Construction Wage Rate Requirements--Price Adjustment (None or Separately Specified Method)

MAY 2014

52.222-35 Equal Opportunity for Veterans OCT 2015

52.222-36 Equal Opportunity for Workers with Disabilities JUL 2014 52.222-37 Employment Reports on Veterans OCT 2015 52.222-40 Notification of Employee Rights Under the National Labor

Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons MAR 2015 52.222-54 Employment Eligibility Verification OCT 2015 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-5 Alt I Pollution Prevention and Right-to-Know Information (May

2011) Alternate I

MAY 2011

52.223-6 Drug-Free Workplace MAY 2001 52.223-12 Refrigeration Equipment and Air Conditioners MAY 1995 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

MAY 2008

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright

Infringement

DEC 2007

52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance and Payment Bonds--Construction OCT 2010 52.229-3 Federal, State And Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts MAY 2014 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

JUL 2013

52.232-37 Multiple Payment Arrangements MAY 1999 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Quantity Surveys APR 1984 52.236-17 Layout of Work APR 1984

52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-6 Subcontracts for Commercial Items OCT 2015 52.245-1 Government Property APR 2012 52.245-9 Use And Charges APR 2012 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2015 52.249-2 Termination For Convenience Of The Government (Fixed-

Price)

APR 2012

52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) (Apr 2012) - Alternate I

SEP 1996

52.249-3 Termination for Convenience of the Government (Dismantling, Demolition, or Removal of Improvements)

APR 2012

52.249-10 Default (Fixed-Price Construction) APR 1984 52.249-10 Alt I Default (Fixed-Price Construction) (Apr 1984) Alternate I APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-

Contract-Related Felonies

DEC 2008

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Alt A System for Award Management Alternate A FEB 2014 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting.

SEP 2015

252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

OCT 2015

252.211-7007 Reporting of Government-Furnished Property AUG 2012 252.222-7006 Restrictions on the Use of Mandatory Arbitration Agreements DEC 2010 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.225-7048 Export-Controlled Items JUN 2013 252.227-7033 Rights in Shop Drawings APR 1966 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

252.232-7009 Mandatory Payment by Governmentwide Commercial Purchase Card

DEC 2006

252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.245-7001 Tagging, Labeling, and Marking of Government-Furnished

Property

APR 2012

252.245-7002 Reporting Loss of Government Property APR 2012 252.245-7003 Contractor Property Management System Administration APR 2012 252.245-7004 Reporting, Reutilization, and Disposal MAR 2015

CLAUSES INCORPORATED BY FULL TEXT

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS

(OCT 2015)

(a) Definitions. As used in this clause:

Executive means officers, managing partners, or any other employees in management positions.

First-tier subcontract means a subcontract awarded directly by the Contractor for the purpose of acquiring supplies or services (including construction) for performance of a prime contract. It does not include the Contractor's supplier agreements with vendors, such as long-term arrangements for materials or supplies that benefit multiple contracts and/or the costs of which are normally applied to a Contractor's general and administrative expenses or indirect costs.

Month of award means the month in which a contract is signed by the Contracting Officer or the month in which a first-tier subcontract is signed by the Contractor.

Total compensation means the cash and noncash dollar value earned by the executive during the Contractor's preceding fiscal year and includes the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Financial Accounting Standards Board's Accounting Standards Codification (FASB ASC) 718, Compensation- Stock Compensation.

(3) Earnings for services under non-equity incentive plans. This does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

(5) Above-market earnings on deferred compensation which is not tax-qualified.

(6) Other compensation, if the aggregate value of all such other compensation (e.g., severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property) for the executive exceeds $10,000.

(b) Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L.

110-252), requires the Contractor to report information on subcontract awards. The law requires all reported information be made public, therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public.

(c) Nothing in this clause requires the disclosure of classified information.

(d)(1) Executive compensation of the prime contractor. As a part of its annual registration requirement in the System for Award Management (SAM) database (FAR provision 52.204-7), the

Contractor shall report the names and total compensation of each of the five most highly compensated executives for its preceding completed fiscal year, if—

(i) In the Contractor's preceding fiscal year, the Contractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.).

(2) First-tier subcontract information. Unless otherwise directed by the contracting officer, or as provided in paragraph (g) of this clause, by the end of the month following the month of award of a first-tier subcontract with a value of $30,000 or more, the Contractor shall report the following information at http://www.fsrs.gov for that first-tier subcontract. (The Contractor shall follow the instructions at http://www.fsrs.gov to report the data.)

(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(vi) Subcontract number (the subcontract number assigned by the Contractor).

(vii) Subcontractor's physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(viii) Subcontractor's primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(ix) The prime contract number, and order number if applicable.

(x) Awarding agency name and code.

(xi) Funding agency name and code.

(xii) Government contracting office code.

(xiii) Treasury account symbol (TAS) as reported in FPDS.

(xiv) The applicable North American Industry Classification System code (NAICS).

(3) Executive compensation of the first-tier subcontractor.

Unless otherwise directed by the Contracting Officer, by the end of the month following the month of award of a first-tier subcontract with a value of $30,000 or more, and annually thereafter (calculated from the prime contract award date), the Contractor shall report the names and total compensation of each of the five most highly compensated executives for that first-tier subcontractor for the first-tier subcontractor's preceding completed fiscal year at http://www.fsrs.gov, if—

(i) In the subcontractor's preceding fiscal year, the subcontractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), cooperative agreements, and other forms of Federal financial assistance; and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S.