Attachment_9_SABER_RFP_Pricing_Worksheet.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA8601-16-R-0010
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

*****DRAFT RFP**** Attachment 9 SABER Pricing Worksheet

View the file

Other files for this federal contract opportunity

Other files attached to Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
926001NN.11R.tiff TIFF file
H-004_CONTROLS.dgn —
H-001_LEGEND_AND_SCHEDULES.dgn —
H-002_DETAILS.dgn —
699981NM.06R.tiff TIFF file
039959NC.01R.tiff TIFF file
926001NC.01R.tiff TIFF file
926001NM.20R.tiff TIFF file
926001NM.18R.tiff TIFF file
699981NM.05R.tiff TIFF file
599951RA.01R.tiff TIFF file
0399591A.03R.tiff TIFF file
926001NA.09R.tiff TIFF file
926001NE.25R.tiff TIFF file
926001NM.17R.tiff TIFF file
926001NE.21R.tiff TIFF file
926001NM.13R.tiff TIFF file
-_0616_-_15-2025_page_2_of_2.dwg DWG drawing
579969NM.03R.tiff TIFF file
926001NN.32R.tiff TIFF file
699981NS.04R.tiff TIFF file
H-003_SCHEDULES.dgn —
926001NE.27R.tiff TIFF file
0399591A.02R.tiff TIFF file
A100.DWG DWG drawing
579969NA.01R.tiff TIFF file
926001NN.10R.tiff TIFF file
-_0616_-_15-2025_page_1_of_2.dwg DWG drawing
A400.dwg DWG drawing
OH160002_-7-8-2016.pdf PDF
OH160102_-7-8-2016.pdf PDF
FA860116R0010_RFP_-_SABER_Amendment_3.pdf PDF
SABER_Source_Selection_RFIs.pdf PDF
FA860116R0010_RFP_-_SABER.pdf PDF
FA860116R0010_RFP_-_SABER_Amendment_2.pdf PDF
Attachment_16_-_Seed_As-Builts.pdf PDF
Attachment_13_Addendum_Number_01_Doc.doc DOC document
FA860116R0010_RFP_-_SABER_Amendment.pdf PDF
Attachment_14_-_Seed_SOO_Addendum.pdf PDF
StateOfObjective_REVISED.pdf PDF
Attachment_9_-_SABER_RFP_Pricing_Worksheet.xlsx XLSX spreadsheet
FA860116R0010_RFP_-_SABER.pdf PDF
Attachment_2_-_SABER_WPAFB_Master_Specifications.pdf PDF
Attachment_6_DBA_WD_OH160114.pdf PDF
FINAL_Draft_RFP_Questions.docx DOCX document
Attachment_8_DBA_WD_OH150002.pdf PDF
Attachment_4_DBA_WD_OH150011.pdf PDF
Attachment_2_SABER_WPAFB_Master_Specifications.pdf PDF
Attachment_3_DBA_WD_OH150114.pdf PDF
Attachment_1_DRAFT_SABER_STATEMENT_OF_WORK.docx DOCX document
Show all 50

Simplified Acquisition of Base Engineering Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SABER PRICING WORKSHEET

(FA8601-16-R-0010, Section J, Attachment ?)

Ordering
PeriodEstimated Ordering Period AmountCoefficient ACoefficient BCoefficient CCoefficient DCoefficient
TotalOrdering Period Evaluated Price
WeightCoefficientWeightCoefficientWeightCoefficientWeightCoefficient
Base$14,000,000.0080.00%10.00%5.00%5.00%0.0000$0.00
Option 1$14,500,000.0080.00%10.00%5.00%5.00%0.0000$0.00
Option 2$15,000,000.0080.00%10.00%5.00%5.00%0.0000$0.00
Option 3$16,000,000.0080.00%10.00%5.00%5.00%0.0000$0.00
Option 4$17,000,000.0080.00%10.00%5.00%5.00%0.0000$0.00
6 Month Ext.$8,500,000.0080.00%10.00%5.00%5.00%0.0000$0.00

Seed Task Price

Total Evaluated Price $0.00

Notes:
1. Offeror is required to complete all blue cells. All other cells will self populate based on the formulas specified in Section M of the RFP.
2. The coefficient weights and estimated ordering period amounts specified are for evaluation purposes only. They are not indicative of actual contract utilization.
3. Section 11.1.6 of the Statement of Work (SOW) provides the coefficent definition and what shall be included in the proposed coefficients.
4. Coefficient A is for work performed during standard working hours (reference SOW Section 11.1.6.1). Shall be no less than 0.8000.
5. Coefficient B is for work performed during non-standard working hours (reference SOW Section 11.1.6.2). Shall be no less than 0.8000.
6. Coefficient C is for equipment and material not included in the RSMeans Unit Price Book (reference SOW Section 11.1.6.3). Shall be no less than 1.0000.
7. Coefficient D is for professional engineering services and permits not included in the RSMeans Unit Price Book (reference SOW Section 11.1.6.4).
Shall be no less than 1.0000.
8. Section 11.4.1.2.B of the SOW specifies the only allowable adjustments to RSMeans Unit Price Book line items.

Source Selection Information (when completed) – See Far 2.101 and 3.104 For Official Use Only

File details come from the government source that posted it. Updated .