Attachment_1_CE_Support_Contract_PWS__18_February_2016.pdf

PDF 3 MB Posted

Attached to
CIVIL ENGINEER FACILITY AND EQUIPMENT SUPPORT TO INTELLIGENCE AND RESEARCH AND DEVELOPMENT ACTIVITIES
Solicitation number
FA8601-16-R-0002
Issued by

About this file

PERFORMANCE WORK STATEMENT FOR CIVIL ENGINEER (CE) FACILITY AND EQUIPMENT SUPPORT TO INTELLIGENCE AND RESEARCH AND DEVELOPMENT ACTIVITIES

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

CIVIL ENGINEER FACILITY AND EQUIPMENT

SUPPORT TO INTELLIGENCE AND RESEARCH

AND DEVELOPMENT ACTIVITIES

FA8601-16-R-0002

Attachment 1

WRIGHT-PATTERSON AIR FORCE BASE, OHIO

18 February 2016

TABLE OF CONTENTS

SECTION NUMBER & TITLE PAGE

I. Description of Services/General Information 04

1.1. Administration 04

1.2. Base Compliance 09

1.3. Maintenance 09

1.4. Equipment Repair/Replacement 16

1.5. Industrial Control System 18

1.6. Inventories 19

1.7. Equipment Labels 20

1.8. Environmental Requirements 20

1.9. Contractor Personnel 21

1.10. Quality Control 24

1.11. Hours of Operation 25

1.12. Records 25

1.13. Safety and Occupational Health Requirements 26

1.14. Fire Protection, Welding and Cutting 27

1.15. Material Disposal 28

1.16. Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis per DOD Instruction (DODI) 3020.37 28

II. Services Summary 29

III. Base Support 31

3.1. Property 31

3.2. Services 32

3.3 Contractor Furnished Items and Services. 32

V. Appendices

A. Government Expected Service Contract Act Labor Categories 34

B. Maps and Work Area Layout 35

C. Base Support Facilities 36

D. Contract Data Requirements List 37

E. Applicable Publications and Forms 56

F. Acronyms and Definitions 64

G. Required Reports 70

H. Site Specific Spill Plan 71

I. Information Assurance Requirements 74

J. Additional Contractor Instructions 78

PERFORMANCE WORK STATEMENT

FOR

CIVIL ENGINEER (CE) FACILITY AND EQUIPMENT SUPPORT

TO

INTELLIGENCE AND RESEARCH AND DEVELOPMENT ACTIVITIES

I. DESCRIPTION OF SERVICES/GENERAL INFORMATION

The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services to perform civil engineering support, maintenance, repair, and replacement of government equipment as defined in this Performance Work Statement (PWS), (except as specified in Section III as Base Support), for organizations located at Wright-Patterson Air Force Base (WPAFB), Ohio. These organizations include, Air Force Institute of Technology (AFIT), Air Force Research Laboratories (AFRL), 88th Air Base Wing (ABW) organizations, National Air and Space Intelligence Center (NASIC), 711th Human Performance Wing (HPW), Naval Medical Research Unit (NAMRU), Air Force Petroleum Agency (AFPA) and their successors. The addition of other organizations and changes to the type of equipment on this contract must be first approved by the Base Civil Engineer (BCE) and the Contracting Officer (CO). The contractor shall perform to the standards in this contract. Services fall into the categories of recurring preventive maintenance, operation, repair activities, replacement activities, and approved upgrades to equipment. Services also include obtaining the services of subcontractors for specialized work beyond the capability of on-base contractor personnel. The contractor shall accomplish services using limited or no plans, drawings, specifications, or sketches. The contractor shall provide water treatment and water analysis.

1.1. ADMINISTRATION

1.1.1. Supply System. The contractor shall provide administrative tasks of ordering, receiving, verifying, tracking, inventorying, delivery to work site, and securing of materials and parts bought under this contract. This control shall apply to items in stock and on order. The controlled stock of items shall be maintained and accounted for by the contractor using a Management Information System (MIS) which is Microsoft Office 2013 software compatible. The contractor shall maintain an accurate and up-to-date inventory of all materials and parts on-hand or furnished by the government.

1.1.2. Purchasing Plan. For the purchase of items the contractor shall establish and maintain a Purchasing Plan to ensure the requirements of the contract are provided as specified. A finalized version of the Purchasing Plan shall be provided to the government IAW Appendix D, Data Item No. A001. The Purchasing Plan is subject to non-acceptance by the CO and revision required by the contractor at no additional cost to the government to ensure quality service. Contractor compliance with the Purchasing Plan shall be monitored by the government.

1.1.2.1. The price for recurring maintenance including water treatment and water analysis shall include the cost of all labor hours purchased by the government, parts, materials, consumables, subcontractors, equipment, etc. charged to the customer’s government purchase card (GPC) and the GPC account at the Contracting Office. For repair and replacement work requests (WR) the price shall include the cost of all labor hours purchased by the government and parts, materials, consumables, subcontractors equipment, etc. charged to the customer’s GPC and the GPC account at the Contracting Office. For work requests that total less than $3,500 for parts, materials, consumables, subcontractors equipment, etc. the contractor shall submit a bill of materials to the customer’s Contracting Officer’s Representative (COR) for purchase through the customer’s GPC. For work requests that total $3,500 or more for parts, materials, consumables, subcontractor’s equipment, etc. the contractor shall submit a bill of materials to the Contracting Office. The Contracting Office shall purchase these items through a GPC account. The contractor shall follow its Purchasing Plan to obtain the required items/services at fair and reasonable pricing. When requirements for several Delivery Orders (DOs) are grouped together, invoices shall be prepared to itemize charges for each DO. Competitive quotes shall not be required for purchases of less than $3,500 as long as the price is determined to be fair and reasonable by the COR and the CO.

Contractor shall submit justification for fair and reasonable pricing if requested. An approved work requests does not constitute authorized approval for ordering parts, materials, consumables, subcontracted services, equipment, etc.

1.1.2.2. Parts, materials, consumables, subcontractor’s equipment etc. shall have a minimum of three

(3) quotes on purchases for $3,500 or greater from the supplier catalogs/e-books listed under CLIN 0023

– Government Purchase Card Material. If three (3) quotes cannot be obtained from the supplier catalogs/e-books, at least one (1) quote shall be obtained from the supplier catalogs/e-books and the other two may be provided from other sources. In the case of a "no quote" source, the contractor shall provide the name of manufacturer’s representative, company name; date contacted, and telephone number. Unit purchases in excess of $3,500 must be approved by the CO prior to purchase. Sole source, single source, and brand name purchases require a letter of justification from the contractor, approved by the CO. Specific item requests require a letter of justification from the user, approved by the CO. This requirement does not apply to unit purchases on tasks orders costing $150,000.00 or greater as referenced in paragraph 1.4.9.

1.1.2.3. All purchase requests and bill of materials submitted to the government for approval shall be submitted and tracked electronically.

1.1.3. Records. The contractor shall maintain electronic (Microsoft Office 2013 compatible) records of all material, supplies, tools, and equipment used on this contract. Records shall identify the supplier, the price, the individual or the equipment (by Equipment Item Number) receiving the item, the DO, and work request number. The contractor shall provide the source documents for an audit trail for all expenditures under this contract, including original vendor invoices. The records shall be available for review and reproduction by the government at any time.

1.1.3.1. An electronic record of any maintenance/repair/replacement action that alters any portion of a facility shall be kept in applicable Field Maintenance Offices (Reference Appendix C) and be submitted to the government IAW paragraph 1.1.4. “Submittal Procedures”. These records shall include pertinent data which includes drawings and wiring diagrams.

1.1.4. Submittal Procedures.

1.1.4.1. Prior to purchasing any new equipment item exceeding $5,000.00 or as requested by the Government, the contractor shall submit for approval to the COR, the manufacturer’s current technical data (e.g., catalog cuts or brochures). All submittals required by paragraph 1.8, Environmental Requirements, shall be submitted to the COR for approval. All Operation & Maintenance (O&M) Manuals, wiring diagrams and warranty information shall be submitted to the COR for approval. A properly documented AF Form 3000 shall accompany all submittals. The submittal packages shall be submitted electronically to the SharePoint site for approval. An associated email shall be sent to the Civil Engineering Primary COR (CEPCOR) and each CE COR for notification purposes. One hard copy of O&M Manuals, wiring diagrams and warranty information shall also be submitted. The contractor shall maintain and make available to the government as requested a record of all submittals IAW Appendix D, Data Item No. A002.

1.1.4.2. The contractor shall provide to the government required material submittal packages for emergency work requests within three (3) days of the initiation of the work request. (See Para. 1.4.2.)

1.1.4.3. The contractor shall provide to the government required material submittal packages for urgent work requests within five (5) days of the initiation of the work request. (See Para. 1.4.3.)

1.1.4.4. The contractor shall provide to the government required material submittal packages for routine work requests within ten (10) days of the initiation of the work requests. (See Para. 1.4.4.)

1.1.5. Warranty/Guarantee. The contractor shall guarantee their work (including labor and material) for a period of one (1) year. The equipment shall be warrantied for a period of one (1) year or length of the original equipment manufacturer’s warranty, whichever is greater. Warranty commences after Government acceptance. All manufacturers’ warranties shall be exercised and enforced by the contractor before committing any labor or materials on an affected equipment item. The contractor shall validate with equipment manufacturers to ensure any adjustment or repair action does not void warranties. The contractor shall obtain, on behalf of the government, a manufacturer’s warranty that begins at start-up of equipment and not the purchase date. The contractor shall maintain originals and provide a copy of all warranty/guarantees to the CEPCOR or designee per paragraph 1.1.4. Submittal Procedures.

1.1.6. Work Control. The contractor shall meet all the requirements of this contract, control schedule, and avoid excessive delays in transportation, waiting for material/supplies, etc.

1.1.6.1. Throughout the contract, the government-provided equipment list shall be modified by the government to delete equipment from the contract, to add equipment to the contract, or make changes to the equipment. Changes consist of modifying the equipment’s nomenclature/documentation, or annotating the equipment to receive maintenance or strictly repair/replacement work as requested. The government shall post a new equipment list to a contract SharePoint Site at the beginning of every month.

1.1.7. Reporting System. The contractor shall provide all required reports to the government, using the contractor- furnished Management Information System (MIS). All required reports shall be in Microsoft Office 2013 compatible format with a minimum Arial or Times New Roman font size of 10. The layouts of the reports shall be approved by 88 CES/CEOES. The system shall provide control over all work from inception to completion. The system shall integrate the functions of work generation, work control, work completed, reports, and invoices. The reports shall be delivered to the government electronically to a contract SharePoint Site.

1.1.8. Labor and Material Status Report for Maintenance. The contractor shall provide a labor and material status report for maintenance activities for all customers on a Microsoft Office 2013 Excel spreadsheet IAW Appendix D, Data Item No. A005. This report shall also be segregated by customer (i.e. Lab) by individual tabs on the spreadsheet. The labor and materials status report shall be at a minimum concurrent with all expenditures within three (3) working days of the report date. The reports shall detail:

1.1.8.1. Delivery order number

1.1.8.2. Element of expense investment code (EEIC)

1.1.8.3. Labor hours charged, separated by Regular and Overtime hours

1.1.8.4. Parts, materials, consumables, subcontractor costs, equipment costs, etc. charged to customer’s

GPC

1.1.8.5. Parts, materials, consumables, subcontractor costs, equipment costs, etc. charged to GPC account at Contracting

1.1.8.6. Total incurred labor hour expenditures and incurred GPC charges to date for maintenance activities.

1.1.9. Labor and Material Status Report for Repair/Replacement. The contractor shall provide a labor & material status report for repair/replacement activities for all customers on a Microsoft Office 2013 Excel spreadsheet IAW Appendix D, Data Item No. A006. This report shall also be segregated by customer (i.e. Lab) by individual tabs on the spreadsheet. The labor and materials status report shall be at a minimum concurrent with all expenditures within three (3) working days of the report date. The reports shall detail:

1.1.9.1 Delivery order number

1.1.9.2. Element of expense investment code (EEIC)

1.1.9.3. Labor hours charged by trade separated by Regular and Overtime hours

1.1.9.4. Parts, materials, consumables, subcontractor costs, equipment costs, etc. charged to customer’s

GPC

1.1.9.5. Parts, materials, consumables, subcontractor costs, equipment costs, etc. charged to GPC account at Contracting

1.1.9.6. Total incurred labor hour expenditures and incurred GPC charges to date for repair/replacement

1.1.10. Purchased Labor Hour Report. The contractor shall provide a labor report for all customers on a Microsoft Office 2013 Excel spreadsheet IAW Appendix D, Data Item No. A007. This report shall also be segregated by customer (i.e. Lab) by individual tabs on the spreadsheet.

1.1.10.1. Quantity of hours, separated by Regular and Overtime hours, purchased by the government per trade

1.1.10.2. Balance of hours, separated by Regular and Overtime hours, purchased by the government per trade

1.1.10.3. Percent (%) of hours separated by Regular and Overtime hours, expended per trade

1.1.10.4. Designate if the expended labor hours, separated by Regular and Overtime hours, exceed 85% of government purchased hours

1.1.11. Manning Forecast Report. The contractor shall provide manning reports for forecasting and reporting direct labor hours. The report shall show a seven (7) day week time frame with the current day’s man-hours being forecasted and any previous days of the week being actual man-hours. The report shall show individual’s name, trade, the DO, building number, work request number and the man-hours charged. A final report for each week shall be submitted with the following week’s first day forecast IAW Appendix D, Data Item No. A008.

1.1.12. Equipment Maintenance Plan. The contractor shall provide an Equipment Maintenance Plan based upon the government provided maintenance instructions and generated from the MIS for each Lab. The plan shall be a listing of equipment to receive maintenance and designate the building number of the equipment, the equipment’s identification number (EIN), type of equipment, equipment description, and equipment location. The plan shall indicate if the maintenance is derived from RS Means maintenance instructions, the Air Force Civil Engineer (AFCEC) and Wright Patterson (WP) Preventative Maintenance Task List (PMTL) or government provided manual of maintenance instructions (See Paragraph 1.3.3. Recurring Maintenance). The plan shall indicate the type of maintenance (daily, weekly, monthly, quarterly, semi-annual, or annual) scheduled and the total number of hours anticipated performing the maintenance. The plan shall include a yearly schedule and a schedule for each month as required by paragraph 1.3.3. Revise plan per equipment additions, deletions and changes as described in paragraphs 1.1.6.1. and 1.3.3. The plan shall be divided up for each year of the contract on individual spreadsheet tabs IAW Appendix D, Data Item A009.

1.1.13. Summary of Completed Maintenance Work. The contractor shall provide a summary of maintenance work accomplished every month for each Lab. The summary shall be an extension of the Equipment Maintenance Plan, detailing the date the maintenance was completed during the previous month and the actual hours expended. The completed equipment maintenance column shall be adjacent to the scheduled maintenance items for easy cross-reference. The summary should also include annotation of work not completed and overdue. The summary shall be generated from the contractor’s MIS IAW Appendix D, Data Item No. A010.

1.1.14. Work Authorization Status Report for Repair/Replacement Activities. The contractor shall provide a weekly status report showing the current open work authorization activity for each lab. The report should include date the work authorization was reported, work priority, the date the contractor began work, the required work completion date by PWS, status of the work and actual work completion date. This report shall be segregated by customer (i.e. Lab) by individual spreadsheet tabs. The report shall keep as a history all of the closed work authorizations. Open work authorizations shall remain at the top of the report with closed authorizations following IAW Appendix D, Data Item No. A011.

1.1.15. Equipment Cost History Report. The contractor shall provide a quarterly report segregated by customer (i.e. Lab) on individual spreadsheet tabs that shows all costs per equipment item. The report shall identify each piece of equipment by equipment ID number. Maintenance costs shall be broken down into parts and material costs, labor costs, subcontractor costs and total costs. Repair/replacement costs shall be broken down into parts and material costs, labor costs, subcontractor costs and total costs. Maintenance & repair/replacement costs shall be totaled reflecting all expenditures per equipment item IAW Appendix D, Data Item No. A012.

1.1.16. Inventory Report. The contractor shall provide an accurate and current report for the refrigerant inventory provided to the contractor for use on this contract. The inventory report shall include the description of item, quantity, and location. The report shall document any item used, the date the item was used, and the EIN of the equipment the item was used on. The inventory report shall also account for refrigerant purchased but not completely used. The residual refrigerant shall be added to the inventory and tracked. Inventory Report IAW Appendix D, Data Item No. A013.

1.1.17. Equipment Listing. The Equipment Listing is the government equipment the contractor is responsible for operating, maintaining, and repairing on this contract. The contractor shall obtain an updated equipment list from the CE Support SharePoint Site on the 1st of every month. The updated list incorporates all additions, deletions, and changes of the past month. The equipment listing shall display lab number, building number, equipment classification number, item number, location, description of the item as real property or user’s equipment, manufacturer’s name, model number, serial number and a designation on whether the equipment receives maintenance or strictly repair/replacement services. The listing shall be sorted in numerical order by the lab number, building number, equipment classification number, and item number. The contractor shall visit each piece of equipment on the listing at the onset of the contract and verify all data is correct on the equipment list. All discrepancies shall be documented and submitted to the CO along with the correct information within 90 days of the contract start date. Throughout the course of the contract, the contractor shall field verify equipment data for all new equipment added. This shall be accomplished on a monthly basis with discrepancies documented and changes submitted to the CEPCOR by the end of the month. (Reference Paragraph 1.7.2.)

1.1.17.1. The Equipment Listing includes some facility utility systems such as steam and condensate piping, compressed air piping, liquid nitrogen piping, etc. Where such systems are listed the contractor is responsible for the entire system. If the utility is not internal to the facility and is fed from an outside source, the contractor is responsible for the system from the service valve to the facility inward. In cases where the utility system is not on the Equipment Listing but a piece of equipment fed from the utility is, the contractor is responsible for the utility from the equipment back to the first shut off valve.

1.1.17.1.2. Steam & Condensate Piping Systems. The contractor shall be responsible for pressure regulating stations in the piping systems, to include the pressure regulating stations where the utility enters the facility and converts high pressure steam to low pressure steam.

1.1.17.1.2.1. Steam Traps. The maintenance instructions require servicing steam traps. The contractor shall also update a steam trap database at the end of each calendar year. The updating shall require the contractor to annotate all traps checked and specify any repairs or replacements. The trap database shall be on a website provided by the government and include a log of existing steam traps. The database includes approximately 1,200 traps and may increase or decrease in quantity throughout the life of the contract in relation to equipment list changes IAW Appendix D, Data Item No. A014.

1.1.17.2. All ancillary or associated items to a piece of equipment on the Equipment List shall be a part of the equipment for the purposes of this Performance Work Statement (e.g. electric service from the motor control center to the equipment, HVAC controls directly and indirectly controlling the equipment).

1.1.18. Civil Engineering Work Management Systems. The contractor shall provide updates to the Civil Engineering Work Management Systems, TRIRIGA and BUILDER database. The updates will be for real property equipment. The updates to TRIRIGA shall reflect maintenance status. The updates to BUILDER shall reflect equipment removals, replacements, and new installations. Training for both systems will be provided by the government.

1.1.19. Training. Contractor (or subcontractor) provided training to operate and maintain all new control systems (regardless of price) and newly installed equipment items that exceed $50,000 in costs shall be provided.

1.2. BASE COMPLIANCE

1.2.1. All work accomplished under this contract shall be in compliance with the current version of the Base Facility Standard (BFS).

1.2.2. All HVAC controls (Appendix F, definition) replaced under this contract shall be in compliance with the current versions of the BFS and WPAFB Specification 23-09-23.

1.2.3. Information Assurance Compliance (IAC) pertaining to Industrial Controls Systems (ICS) and the Civil Engineering Virtual Local Area Network (CE VLAN)) remains the responsibility of 88 ABW CEI. All work accomplished under this contract requiring Information Technology (IT) access to ICS equipment and CE VLAN assets shall be vetted through the 88 ABW CEOER ICS Information Assurance Manager office. (See Appendix I; Information Assurance Requirements)

1.3. MAINTENANCE.

1.3.1. General. The contractor shall provide all labor, supervision, equipment, tools, materials, consumables, subcontractors and all other services required for maintenance activities, including water treatment and water analysis. The majority of maintenance services shall be accomplished during normal work hours (para. 1.11.1.). A smaller amount of maintenance activities shall be required to be performed after normal hours. This is due to on-going testing and instances where equipment shut-down would impact the user’s mission. The contractor and government shall be required to work together to facilitate a maintenance schedule in these cases. After hours work requires prior approval of the lab COR and the hours shall be charged as overtime hours.

1.3.2. Maintenance. The government provided equipment list to the contractor (See Para, 1.1.17.) shall designate which equipment receives maintenance. The contractor shall use this list to prepare the Equipment Maintenance Plan as required by paragraph 1.1.12 IAW Appendix D, Data Item No. A009.

Types of work to be performed within the maintenance category include the following:

1.3.3. Recurring Maintenance. The contractor shall perform recurring maintenance in accordance with the assigned UNIFORMAT II System designation per the latest annual version of the RS Means Maintenance Cost Data. For all equipment not assigned an UNIFORMAT II System designation per the RS Means Maintenance Cost Data the contractor shall perform recurring maintenance in accordance with the government provided Air Force Civil Engineer (AFCEC) and Wright Patterson (WP) Preventative Maintenance Task List (PMTL) or government provided manual of maintenance instructions. When a change to the maintenance instructions is initiated by the government, the contractor shall include the change(s) in the next equipment maintenance plan (see paragraph 1.1.12.).

1.3.3.1. Generators. In addition to the maintenance instructions, the contractor shall maintain and service generators in compliance with Engineering Technical Letter (ETL) 13-4 (Change 1), “Standby Generator Design, Maintenance, and Testing Criteria, Air Force Instruction (AFI) 32-1062, “ Electrical Power Plants and Generators” and AFI 32-1063, “Electrical Power Systems”. The contractor shall complete AF Form 487, “Emergency Generator Operating Log” each time the generator is operated. , The contractor shall complete AF Form 719; “Historical Record –Diesel-Electric Generator & System” each time the generator is inspected or receives service. The contractor shall maintain and manage the forms per the AFIs.

1.3.3.2. Materials and Supplies. The contractor shall provide all materials, supplies and consumables associated with maintenance IAW 1.1.2.1 to keep the equipment on this contract functioning properly.

These materials include filters (air, water, & oil), pre-filters, belts, oils, grease, softener salt, carbon tanks and ion exchange resin tanks for water treatment systems, etc. All filters must comply with the equipment manufacturer’s recommended minimum efficiency reporting value (MERV).

1.3.3.3. Maintenance Instruction Clarifications. On equipment with multiple banks of filters, replace the pre-filters per the maintenance instructions. Secondary filter banks (bag, HEPA, etc.) shall be coordinated on with the LAB COR for a government decision on replacement. When maintenance instructions state “replace as necessary”, the contractor shall coordinate with the LAB COR for a government decision on replacement. When maintenance instructions state “clean as necessary”, the contractor shall coordinate with the LAB COR for a government decision on cleaning.

1.3.3.4. Maintenance Tests and Analysis. The results of all tests and analysis required by the maintenance instructions shall be uploaded to the appropriate folder on the contract’s SharePoint site.

1.3.4. Water Analysis and Treatment. Furnish all labor, parts, materials, consumables, equipment, subcontractors, devices, appliances, etc. to treat condenser water systems, closed hot water loops and closed chilled water loops and perform water analysis for equipment on this contract. All parts, materials, consumables, equipment, subcontractors, devices, appliances, etc. shall be furnished IAW 1.1.2.1.

Following is a list of existing cooling towers and closed loop systems on the contract that are to receive treatment:

LAB BLDG EQUIPMENT NO REMARKS

3 20248 20837 20838 20851 20851

D3035-110-2950-001 D3035-110-2950-001 D3035-110-2950-001 D3035-110-2950-001 D3035-110-2950-002

5 20837 20851 20851

7 20651 20654 20655

D3035-110-3950-001 D3035-110-3950-001 D3035-110-3950-001

8 20018 20018H 20018H 20018H 20023 20023 20045 20065 20071D 20145 20146 20490C 20490C 20490C

D3035-110-2950-001 D3035-110-2950-001 D3035-110-2950-002 D3035-110-2950-003 D3035-110-2950-001 D3035-110-2950-002 D3035-110-2950-001 D3035-110-2950-001 D3035-110-2950-001 D3035-110-2950-001 D3035-110-2950-001 D3035-110-2950-001

D3035-110-2950-003

9 20600 20601 20602 20620 20620 20620 20622

D3000-000-0000-001

D3000-000-0000-001 D3035-110-3950-001 D3035-110-3950-002 D3035-110-3950-003

1.3.4.1. As part of the preventive maintenance program, the contractor shall provide water treatment and analysis.

1.3.4.2. Test and change chemical drums (using manufactures specifications) to ensure adequate supply of treatment chemicals.

1.3.4.3. Maintenance and operation of all chemical feed pumps, controllers, strainers, water meters, bleed valves, flow switches, test coupons, test racks, and pH meters shall be checked in accordance with manufacturers specifications.

1.3.4.4. Clean baskets in supply line strainers quarterly. (RS Means' instructions call for this task semi-annually. This requirement adds two additional cleanings.)

1.3.4.5. Inspect water distribution pans monthly. Clean and remove scale from holes in bottom of pan to ensure uniform water flow over tower fill. (RS Means' instructions call for this task semi-annually. This requirement adds additional checks and cleanings.)

1.3.4.6. Check the nozzles in the spray distribution tower monthly. Report the number of nozzles not operating properly in writing to the COR, on the Water Treatment Report (Para. 1.3.9) and return the nozzles to operating condition.

1.3.4.7. Control the water level in tower sumps so that they do not overflow and the total dissolved solids (TDS) are controlled by the system bleed valve.

1.3.4.8. Ensure proper operation of all cooling tower make-up water float valves and liquid level control assemblies.

1.3.4.9. Ensure proper operation of, and maintain (using manufactures specifications) condenser water pumps, cooling tower fans, fan motors, gearboxes, louvers, and other equipment related to chemical water treatment. Identify potential condenser water equipment operational problems, and notify the CEPCOR and the Lab COR.

1.3.4.10. Maintain corrosion and scaling limitations, per requirements identified in paragraphs 1.3.7.1 and 1.3.7.2.

1.3.4.11. Remove salt or precipitate that collects on the outside edges of closed packed plastic sheet fill towers, screens, or mist eliminators, and blocks airflow. The contractor shall provide a suction device for removing precipitate.

1.3.4.12. The contractor shall deactivate and clean cooling towers that do not operate continuously at the end of the cooling season. The cleaning operation shall consist of removing all precipitate from the tower surfaces. The contractor shall report all damage to the CEPCOR/COR, within one (1) day of occurrence.

1.3.4.13. The contractor shall perform all seasonal maintenance, per manufacturer specifications, during the period of inactivity for those cooling towers that do not operate continuously. The contractor shall activate the cooling towers commensurate with seasonal load conditions or as required by the mission of each Lab.

1.3.4.14. For cooling towers that run continuously, cleaning and maintenance shall be coordinated with the using organization as described in Paragraph 1.3.1.

1.3.4.15. Flush the closed loop systems annually and test them on a monthly basis. These tests shall include pH, conductivity, nitrite, iron and copper.

1.3.5. Equipment.

1.3.5.1. The contractor shall ensure the condenser water systems have been operating with chemical treatment and have chemical controls, water meters, bleed valves, pumps, strainers, flow switches, and flow regulators already installed. The contractor shall inspect all existing equipment for proper operation within one (1) month of contract start date.

1.3.5.2. All condenser water treatment equipment installed by the contractor shall be new and from a manufacturer regularly engaged in the manufacture of condenser water treatment equipment.

1.3.5.3. The contractor shall inspect cooling tower circulating water systems and provide automatic control of the bleed and chemical treatment based on the actual requirements of the cooling tower and in accordance with specified limits and dosage. Systems shall provide visual indication of chemical feed and bleed off.

1.3.5.4. Existing systems shall have a solid state controller, conductivity cell, water meter, electrical contact head, electrically controlled bleed valve, strainer, chemical feed pumps, flow switches, pH meter with electrical contacts where acid feed is required, and flow regulators as described below:

1.3.5.4.1. Chemical feed shall be controlled independently of bleed off by the controller. The chemical feed pumps shall require no lubrication, be easily calibrated, have no exposed moving parts, be of unit design construction, incorporate cartridge valve for easy priming, have variable stroke length, operate on 120/60/1 power, have isolated mechanical parts to prevent solution contamination, and be sized in accordance with the respective condenser water system.

1.3.5.4.2. The controller shall contain a conductivity cell constructed of material impervious to all water treatment chemicals. The cell shall contain temperature-compensating elements, which, in conjunction with the control circuits that shall maintain constant water Total Dissolved Solids (TDS) regardless of temperature fluctuations. A removable clean-out plug shall be provided in the bottom of the cell. The cell shall withstand a pressure of 125 psi, have a characteristic pressure drop of 10-15 psi, and operate on 120/60/1 power.

1.3.5.4.3. The flow switch shall be installed to energize and de-energize the controller based on condenser water flow.

1.3.5.4.4. The pH meter shall have solid-state circuitry and have a capacity to control the hydrogen ion concentration between pH limits of 6 and 10. The meter shall have adjustable electrical contacts to start a feed pump motor at a high pH level and shut the feed pump motor off at a low pH level. A control light shall indicate when acid is being fed to the condenser water system. Reference limits above, per specifications, for high/low levels.

1.3.6. Treatment Chemicals.

1.3.6.1. The contractor shall furnish all water treatment chemicals IAW 1.1.2.1 required for water treatment on all condenser water systems, closed hot water loops and closed chilled water loops covered by the contract. The contractor shall change chemical drums or fill tanks as required to ensure continued chemical feed to all condenser water systems. All containers shall have secondary containment and be managed in accordance with paragraph 1.8. Environmental Requirements.

1.3.6.2. The contractor shall ensure chemicals are capable of inhibiting scale and corrosion and comply with Environmental Protection Agency (EPA) requirements. No heavy metals, chromates, sulfonates, lignin, or tannins shall be used. In addition, no molybdate-based corrosion inhibitors shall be used for cooling towers discharging to the sanitary sewer system.

1.3.6.3. The contractor shall ensure that the inhibitors control corrosion on the aqueous surfaces of ferrous and non-ferrous metals and have a corrosion rate of 3.0 mils per year or less and corrosion pits of no more than 5.0 mils per year on mild steel. On copper, corrosion shall be limited to 0.5 mils per year and corrosion pits no deeper than 1.0 mil per year. The contractor shall provide data to the Government as requested demonstrating compliance with this requirement. Data should include actual rate tests using American Society of Testing and Material (ASTM) methods.

1.3.6.4. The contractor shall ensure that the biocides provided for bio-fouling organism control can be 10% methylene bis (thiocyanate) alternated with sodium hypochlorite.

1.3.6.5. The contractor shall ensure that the inhibitor systems shall be compatible with chlorine or non-oxidizing biocides for control of algae in accordance with manufacturer’s specifications. An iron inhibitor containing a first generation polymer to control iron deposition throughout the condenser water system shall be used.

1.3.6.6. If an acid treatment is required, the contractor shall ensure acids (muriatic or sulphuric) used control the hydrogen ion concentrations between pH level of 7.2 and 7.8. The use of acid shall not relax the corrosion requirements of paragraph 1.3.7.1.

1.3.6.7. The contractor shall ensure chemical suppliers submit to the prime contractor technical data sheets and description of the chemicals proposed. The Government may request these technical data sheets as necessary. The contractor shall obtain, track, maintain and update, as changes occur, all Safety Data Sheets (SDS).

1.3.7. Performance Criteria.

1.3.7.1. Corrosion Rates. The contractor shall ensure that the corrosion rate of all copper surfaces in contact with treated condenser water shall not exceed 0.5 mils per year and that the corrosion rate of all mild steel surfaces in contact with the treated condenser water shall not exceed 3.0 mils per year. The contractor shall demonstrate that these performance criteria have been satisfied on all the condenser water systems tested via coupons IAW paragraph 1.3.10.

1.3.7.2. Scale. All condenser water cooling towers shall be maintained to less than 1/4" sludge/scale in the bottom of the cold water reservoir. The contractor shall ensure that no appreciable sludge/scale shall accumulate within the condenser tubes as per chiller manufacturer recommendations.

1.3.7.3. Algae. The condenser water systems maintained shall be free from visible accumulation of algae.

1.3.7.4. Pitting. The degree of pitting shall be evaluated in accordance with ASTM standards.

1.3.7.5. Control Ranges and Test Cycles. The contractor shall perform key tests as shown in the table below. The tests pH, total alkalinity and calcium for corrosion and scale control, conductivity and chlorides for blowdown control and total hardness. The tests shall confirm the suitability of the formulation. The required ingredients and the approximate ratio (or multiple thereof) of each are total inorganic phosphate, total organic phosphate, and 2% for total polymeric dispersants, total polymeric antiscalants, and copper corrosion inhibitor. Molybdate corrosion inhibitors shall not be used for cooling towers. All tests shall be documented and submitted to the government as indicated in the following table for review IAW Appendix D, Data Item No. A015.

PARAMETER LIMITS DAILY WEEKLY MONTHLY

pH 7.2-7.8 x Calcium Hardness 1 1/2 times makeup CaH X Total Alkalinity -600pm CaCO3 X Chloride 1 1/2 times makeup Cl X Conductivity 1 1/2 times micromhos X Total Hardness 1 1/2 times makeup as TH X

1.3.8. Operation and Maintenance. The contractor shall provide complete maintenance and operation of the condenser water, chilled water and hot water systems and chemical treatment the systems, including acid feed and pH control equipment as specified herein. Acid shall be fed to tower basin to assure complete dilution prior to metal contact.

1.3.9. Water Treatment Reports. The contractor shall maintain records detailing all chemical analyses performed, personnel performing tests, and the date and time performed for all condenser water systems, closed hot water loops and closed chilled water loops. The contractor shall provide reports for these systems IAW Appendix D, Data Item No. A015.

1.3.10. Corrosion Controls.

1.3.10.1. The contractor shall provide copper and mild steel test coupons in accordance with the directives established in ASTM Standard No. D2688-05, “Standard Test Methods for Corrosivity of Water in the Absence of Heat Transfer (Weight Loss Methods).” The contractor shall install two (2) copper and two (2) mild steel test coupons in accordance with ASTM Standard No. D2688-05, in separate test coupon assemblies on all condenser water systems maintained under provisions of this contract. If any system is not presently per ASTM standards, the contractor shall notify the CEPCOR. The mild steel test coupon assembly shall precede the copper test coupon assembly in the direction of condenser water flow.

1.3.10.2. Pipe used in fabricating or manufacturing the various corrosion coupon assemblies shall be chlorinated polyvinyl chloride (CPVC) or fiberglass reinforced plastic (FRP) pipe. All corrosion coupon assemblies shall be manufactured-fabricated in accordance with ASTM Standard No. D2688-05. The corrosion coupon assemblies shall be installed across the respective condenser water circulating pumps and incorporate globe or gate valves before and after the test coupons in the direction of water flow. The corrosion coupon assemblies also incorporate a flow-regulating device to facilitate adjustment of the condenser water flow rate across the test coupons. The condenser water flow rate shall thereby be established for each and every corrosion coupon assembly commensurate with the flow rate through the respective condenser tubes as specified by ASTM Standard No. D2688-05.

1.3.10.3. The contractor shall follow the methods and procedures regarding corrosion testing described in ASTM Standard No. D2688-05.

1.3.10.4. The contractor shall initiate and maintain accurate update records detailing all coupons, testing, preparation, and operational procedures employed. The records shall include data with the water treatment report required by paragraph 1.3.9. The data shall be submitted IAW Appendix D, Data Item No. A015 and include:

1.3.10.4.1. Coupon material, number, and installation location.

1.3.10.4.2. Coupon weight before installation.

1.3.10.4.3. Coupon weight after use.

1.3.10.4.4. Date coupon weighed.

1.3.10.4.5. Certifying laboratory approved by the Government.

1.3.10.4.6. Date coupon installed.

1.3.10.4.7. Date coupon removed.

1.3.10.4.8. Number of days coupon exposed.

1.3.10.4.9. Coupon corrosion rate.

1.3.10.4.10. Corrosion description.

1.3.10.4.11. Coupon maximum pit depth.

1.3.10.5. Prior to installing any test coupons, the contractor shall have an independent laboratory certify each individual test coupon’s weight and material with corresponding test coupon identification number.

Coupons shall be installed within one (1) month of contractor maintenance starting.

1.3.10.6. After approximately sixty days exposure, the contractor shall remove the one (1) copper test coupon and one (1) mild steel test coupon from each corrosion coupon assembly installed. The coupons shall immediately be replaced with properly identified new and different coupons. The contractor shall ensure that the corrosion rates and degree of pitting derived for each test coupon are formulated in accordance with ASTM Standard No. D2688-05. The results shall be certified by the independent testing laboratory, and tabulated by individual system and building number and submitted to the government.

The contractor shall take necessary precautions as stated by ASTM Standard No. D2688-05 to ensure the integrity of test coupons used during all phases of operation.

1.3.10.7. The contractor shall ensure that one (1) copper test coupon and mild steel test coupon shall remain in each corrosion coupon assembly undisturbed for the duration of the cooling season or for six months for those air conditioning systems, which operate continuously. After the completion of the cooling season, or every six months, whichever is appropriate, the contractor shall remove these test coupons. The contractor shall submit these coupons to the government from independent laboratory showing certification that the various corrosion rates and associated degree of pitting for each test coupon are established in accordance with ASTM Standard No. D2688-05. The contractor shall take all-necessary precautions as described by ASTM Standard No. D2688-05 to ensure the integrity of all test coupons used during all phases of operations.

1.3.10.8. The Government reserves the right to independently evaluate, at no cost to the contractor, any or all of the test coupons after use on a random basis. The contractor shall be required to store all used test coupons for one (1) year after use. The contractor shall take all necessary precautions as described in ASTM Standard No. D2688-05 to ensure the integrity of all test coupons during the period of storage following use.

1.3.10.9. As part of the preventive maintenance program, the contractor shall control corrosion, to include: application of protective coatings, maintenance of cathodic protection systems, galvanic corrosion resulting from dissimilar metals, consideration of corrosion problems when purchasing and installing replacement equipment and materials and making recommendations for system modification to reduce corrosion problems and maintenance costs.

1.3.11. Identification of Impending Equipment Failure. During recurring maintenance inspections and actions, contractor personnel may encounter systems requiring repair/replacement. Such conditions shall be identified within 24 hours to the Lab COR and the assigned CE COR via written notification.

1.4. EQUIPMENT REPAIR/REPLACEMENT

1.4.1. General. The requirement for equipment repair/replacement may be identified by the Government or the contractor. When the contractor identifies the need for a repair, the contractor shall notify the applicable CORs within 24 hours of identifying the repair need. Approved government personnel will initiate a work request in response to the repair/replacement identification. The contractor shall then commence work identified in the WR IAW paragraphs 1.4.7, 1.4.8 and 1.4.9. The contractor shall not replace real property at any dollar value or replace, repair/modify user’s equipment costing $10,000 or more, unless the contractor has received an approved Base Civil Engineering Work Request (AF Form 332). A small amount of repair/replacement activities shall be required to be performed after normal hours. This is due to on-going testing and instances where equipment shut-down would impact the user’s mission. The contractor and government shall be required to work together to facilitate a schedule in these cases. After hours work requires prior approval of the lab COR and the hours shall be charged as overtime hours.

Repair actions are classified as follows:

1.4.2. Emergency Work Request. A work request is an emergency when a piece of equipment or system, deemed as essential to the user’s mission, needs service due to failure or poses a danger to life/limb/property. The contractor shall respond to the site within two (2) hours of Government notification to the contractor in order to fix the problem or mitigate the circumstances till the problem can be fully resolved.

1.4.3. Urgent Work Request. A work request is urgent when a piece of equipment or system, deemed as critical to the user’s mission, needs service due to failure. The contractor shall respond to the site within twenty-four (24) hours of Government notification to the contractor in order to fix the problem or mitigate the circumstances till the problem can be fully resolved.

1.4.4. Routine Work Request. A work request is routine when a piece of equipment or system, deemed non-critical to the user’s mission, needs service due to failure. The contractor shall respond to routine work requests within three (3) workdays of Government notification to the contractor in order to fix the problem or mitigate the circumstances till the problem can be fully resolved.

1.4.5. Non-Duty Hours. The contractor shall receive non-duty hour calls through the CE Service Call Desk. The contractor shall respond to the site within two (2) hours of Government notification to the contractor in order to fix the problem or mitigate the circumstances till the problem can be fully resolved.

The contractor shall furnish the COR a list of personnel authorized to respond to emergency and urgent work requests and their phone numbers within five (5) workdays after contract start and update listing as required by contractor personnel changes. Following a response to a non-duty hours request the contractor shall submit a WR request to the CO the next workday.

1.4.6. Repair vs. Replacement. Repairs costing in excess of seventy-five (75%) percent of the replacement cost of the individual item of equipment or repairs that the contractor determines are uneconomical shall be referred to the COR for determination of what action is to be taken. Repair includes restoration of equipment or components to a condition that the equipment may be used effectively for its designated purpose. Restoration includes overhaul, replacement, reprocessing, or repair of constituent parts or materials that have deteriorated by the action of the elements or wear and tear and which cannot be corrected through maintenance.

1.4.6.1. The government may choose to replace equipment when repairs cost less than seventy-five (75%) percent of the repair cost. Under such circumstances, the CO will request the contractor to replace the equipment in lieu of making repairs.

1.4.7. Repairs/Replacements Costing Less Than $3,500 in Materials and/or 15 Labor Hours. The contractor shall respond to the work request and make the required repairs/replacements and submit an itemized bill through his normal invoicing process. Labor shall be charged to the government purchased labor hours. Parts, materials, equipment rentals, subcontractors, etc. shall be billed to the customer’s GPC. During repair/replacement work, if contractor anticipates an upward deviation of material costs to $3500 or greater, or estimated labor hours greater than 15 hours the contractor must seek additional approval from the COR for continuance of work.

1.4.8. Repairs/Replacements Costing $3,500 or Greater in…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .