Wage Decision 2.docx

DOCX document 52 KB Posted

Attached to
RECOVERY--PROJECT NUMBER ZHTV091886DR, Construct Drop Arm Gate 12A Federal contract opportunity
Solicitation number
FA8601-10-R-0017
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Wage Decision 2

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY--PROJECT NUMBER ZHTV091886DR, Construct Drop Arm Gate 12A, newest first.
File Type Posted
091886DR Add 1.doc DOC document
VPP Safety Health Plan.doc DOC document
Amendment 5.doc DOC document
Question 5.doc DOC document
Amendment 4.doc DOC document
Question 4.docx DOCX document
Amendment 3.doc DOC document
Question 3.doc DOC document
Question 2.doc DOC document
Amendment 2.doc DOC document
Question 1.docx DOCX document
Sign In Sheet - Site Visit.pdf PDF
Drawings.pdf PDF
Amendment 1.doc DOC document
Specifications.pdf PDF
Drawings.pdf PDF
Specs. 4.xps XPS file
Statement of Objectives.pdf PDF
Specs. 7.xps XPS file
Specs. 5.xps XPS file
Specs. 6.xps XPS file
Specs. 10.xps XPS file
Specs. 8.xps XPS file
Specs. 9.xps XPS file
Specs. 1.xps XPS file
Specs. 3.xps XPS file
Specs. 11.xps XPS file
Specs. 2.xps XPS file
Solicitation.doc DOC document
Wage Decision.docx DOCX document
Specs. 12.xps XPS file
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: OH080002 02/05/2010 OH2

Superseded General Decision Number: OH20070002

State: Ohio

Construction Types: Heavy and Highway

Counties: Ohio Statewide.

Heavy and Highway Construction Projects

Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/07/2008 3 04/04/2008 4 05/02/2008 5 06/06/2008 6 07/04/2008 7 08/01/2008 8 08/15/2008 9 09/05/2008 10 10/03/2008 11 11/07/2008 12 12/05/2008 13 01/02/2009 14 02/06/2009 15 03/06/2009 16 03/20/2009 17 04/03/2009 18 05/01/2009 19 06/05/2009 20 07/03/2009 21 08/07/2009 22 09/04/2009 23 09/11/2009 24 10/16/2009 25 11/13/2009 26 12/04/2009 27 01/01/2010 28 02/05/2010

BRKY0007-003 06/01/2009

LAWRENCE

Rates Fringes

Bricklayer, Stonemason...........$ 26.82 15.30

BROH0001-001 07/01/2009

DEFIANCE, FULTON (Excluding Fulton, Amboy & Swan Creek Townships), HENRY (Excluding Monroe, Bartlow, Liberty, Washington, Richfield, Marion, Damascus & Townships & that part of Harrison Township outside corporate limits of city of Napoleon), PAULDING, PUTNAM & WILLIAMS

Rates Fringes

Bricklayer, Stonemason...........$ 29.27 10.66

BROH0001-004 06/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 25.77 9.08

BROH0003-002 07/01/2009

FULTON (Townships of Amboy, Swan Creek & Fulton), HENRY (Townships of Washington, Damascus, Richfield, Bartlow, Liberty, Harrison, Monroe, & Marion), LUCAS & WOOD (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson & Grand Rapids)

Bricklayer, Stonemason...........$ 28.07 14.23

BROH0005-003 05/01/2009

CUYAHOGA, LORAIN & MEDINA (Hinckley, Granger, Brunswick, Liverpool, Montville, York, Homer, Harrisville, Chatham, Litchfield & Spencer Townships and the city of Medina)

BRICKLAYER

BRICKLAYERS; CAULKERS;

CLEANERS; POINTERS; &

STONEMASONS.................$ 29.52 11.68

SANDBLASTERS................$ 29.77 11.68

SEWER BRICKLAYERS; STACK

BUILDERS; & SWING SCAFFOLDS.$ 30.02 11.68

BROH0006-005 05/01/2009

CARROLL, COLUMBIANA (Knox, Butler, West & Hanover Townships), STARK & TUSCARAWAS

Bricklayer, Stonemason...........$ 25.65 10.48

BROH0007-005 06/01/2009

PORTAGE & SUMMIT

Rates Fringes

BRICKLAYER.......................$ 27.93 11.67

BROH0007-010 05/01/2009

PORTAGE & SUMMIT

Rates Fringes

MASON - STONE....................$ 27.87 8.10

BROH0008-001 06/01/2009

COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run, Middleton, & Unity Townships and the city of New Waterford), MAHONING & TRUMBULL

BRICKLAYER.......................$ 24.37 14.49

BROH0009-002 07/01/2008

BELMONT, JEFFERSON (Warren & Mt. Pleasant Townships & the Village of Dillonvale) & MONROE

Bricklayer, Stonemason...........$ 23.00 13.75 Refractory.......................$ 27.22 13.75

BROH0010-002 07/01/2009

COLUMBIANA (St. Clair, Madison, Wayne, Franklin, Washington, Yellow Creek & Liverpool Townships) & JEFFERSON (Brush Creek & Saline Townships)

Bricklayer, Stonemason...........$ 24.70 12.91

BROH0014-002 07/01/2005

HARRISON & JEFFERSON (Except Mt. Pleasant, Warren, Brush Creek, Saline & Salineville Townships & the Village of Dillonvale)

Bricklayer, Stonemason...........$ 24.01 8.85

BROH0016-002 10/01/2009

ASHTABULA, GEAUGA, and LAKE COUNTIES

Rates Fringes

Bricklayer, Stonemason...........$ 29.49 11.60

BROH0018-002 06/01/2009

BROWN, BUTLER, CLERMONT, HAMILTON, PREBLE (Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) & WARREN COUNTIES:

Bricklayer, Stonemason...........$ 26.12 9.73

BROH0022-004 09/01/2009

CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND, LOGAN,

MIAMI, MONTGOMERY, PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships) & SHELBY

Bricklayer, Stonemason...........$ 25.20 9.68

BROH0032-001 06/01/2009

GALLIA & MEIGS

Rates Fringes

Bricklayer, Stonemason...........$ 28.27 11.81

BROH0035-002 07/01/2009

ALLEN, AUGLAIZE, MERCER, and VAN WERT

Rates Fringes

Bricklayer, Stonemason...........$ 24.56 10.49

BROH0039-002 06/01/2009

ADAMS & SCIOTO

Rates Fringes

Bricklayer, Stonemason...........$ 26.66 14.17

BROH0040-003 06/01/2009

ASHLAND, CRAWFORD, HARDIN, HOLMES, MARION, MORROW, RICHLAND,

WAYNE & WYANDOT (Except Crawford, Ridge, Richland & Tymochtee Townships)

Bricklayer, Stonemason...........$ 25.74 14.69

Layout Man and Sawman rate: $1.00 per hour above journeyman rate.

Free standing stack work ground level to top of stack;

Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.

"Hot" work: $2.50 above journeyman rate.

BROH0044-002 06/01/2009

Rates Fringes

Bricklayer, Stonemason

COSHOCTON, FAIRFIELD,

GUERNSEY, HOCKING, KNOX,

KICKING, MORGAN,

MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne Townships) & PERRY

COUNTIES:...................$ 25.25 10.20

BROH0045-002 06/01/2009

FAYETTE, JACKSON, PIKE, ROSS & VINTON

Rates Fringes

Bricklayer, Stonemason...........$ 27.72 10.61

BROH0046-002 06/01/2009

ERIE, HANCOCK, HURON, OTTAWA, SANDUSKY, SENECA, WOOD (Perry & Bloom Townships) & WYANDOT (Tymochtee, Crawford, Ridge & Richland Townships), & the islands of Lake Erie north of Sandusky.

Bricklayer, Stonemason...........$ 26.64 14.24

Layout Man and Sawman rate: $1.00 per hour above journeyman rate.

Free standing stack work ground level to top of stack;

Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.

"Hot" work: $2.50 above journeyman rate.

BROH0052-001 06/01/2009

ATHENS

Rates Fringes

Bricklayer, Stonemason...........$ 25.85 11.02

BROH0052-003 06/01/2009

NOBLE (Brookfield, Noble, Center, Sharon, Olive, Enoch, Stock, Jackson, Jefferson & Elk Townships) & WASHINGTON

Bricklayer, Stonemason...........$ 25.67 11.02

BROH0055-003 06/01/2009

DELAWARE, FRANKLIN, MADISON, PICKAWAY & UNION

Rates Fringes

Bricklayer, Stonemason...........$ 26.50 11.95

CARP0003-004 05/01/2009

MAHONING & TRUMBULL

Rates Fringes

CARPENTER........................$ 24.12 12.15

CARP0069-003 05/01/2009

CARROLL, STARK, TUSCARAWAS & WAYNE

Rates Fringes

CARPENTER........................$ 24.29 10.72

CARP0069-006 05/01/2009

COSHOCTON, HOLMES, KNOX & MORROW

Rates Fringes

CARPENTER........................$ 22.95 10.10

CARP0171-002 05/01/2009

BELMONT, COLUMBIANA, HARRISON, JEFFERSON & MONROE

Rates Fringes

CARPENTER........................$ 24.12 12.39

CARP0200-002 05/01/2009

ADAMS, ATHENS, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GALLIA,

GUERNSEY, HIGHLAND, HOCKING, JACKSON, LAWRENCE, LICKING,

MADISON, MARION, MEIGS, MORGAN, MUSKINGUM, NOBLE, PERRY,

PICKAWAY, PIKE, ROSS, SCIOTO, UNION, VINTON, and WASHINGTON

COUNTIES

Carpenter & Piledrivermen........$ 26.27 10.40 Diver............................$ 39.41 10.40

CARP0248-005 07/01/2008

LUCAS & WOOD

Rates Fringes

CARPENTER........................$ 27.27 14.58

CARP0248-008 07/01/2008

Rates Fringes

CARPENTER

DEFIANCE, FULTON, HANCOCK,

HENRY, PAULDING & WILLIAMS

COUNTIES....................$ 23.71 13.28

CARP0254-002 05/01/2009

ASHTABULA, CUYAHOGA, GEAUGA & LAKE

Rates Fringes

CARPENTER........................$ 29.96 11.41

CARP0372-002 07/01/2008

ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM & VAN WERT

Rates Fringes

CARPENTER........................$ 23.18 13.28

CARP0639-003 05/01/2009

MEDINA, PORTAGE & SUMMIT

Rates Fringes

CARPENTER........................$ 27.92 11.69

CARP0735-002 05/01/2009

ASHLAND, ERIE, HURON, LORAIN & RICHLAND

Rates Fringes

CARPENTER........................$ 23.58 10.34

CARP1311-001 05/01/2009

BROWN, BUTLER, CHAMPAIGN, CLARK, CLERMONT, CLINTON, DARKE,

GREENE, HAMILTON, LOGAN, MIAMI, MONTGOMERY, PREBLE, SHELBY &

WARREN

Carpenter & Piledrivermen........$ 27.05 9.69 Diver............................$ 40.58 9.69

CARP1393-002 07/01/2008

CRAWFORD, DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA,

PAULDING, SANDUSKY, SENECA, WILLIAMS & WOOD

Piledrivermen & Diver's Tender...$ 27.30 16.05

DIVERS - $250.00 per day

CARP1393-003 07/01/2008

ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM, VAN WERT & WYANDOT

Rates Fringes

Piledrivermen & Diver's Tender...$ 25.15 15.92

DIVERS - $250.00 per day

CARP1871-006 05/01/2009

BELMONT, HARRISON, & MONROE

Rates Fringes

Diver, Wet.......................$ 44.19 12.14 Piledrivermen; Diver, Dry........$ 29.46 12.14

CARP1871-008 05/01/2009

ASHLAND, ASHTABULA, CUYAHOGA, ERIE, GEAUGA, HURON, LAKE,

LORAIN, MEDINA, PORTAGE, RICHLAND & SUMMIT

Diver, Wet.......................$ 42.69 12.91 Piledrivermen; Diver, Dry........$ 28.46 12.91

CARP1871-014 05/01/2009

CARROLL, STARK, TUSCARAWAS & WAYNE

Rates Fringes

Diver, Wet.......................$ 35.64 11.73 Piledrivermen; Diver, Dry........$ 23.76 11.73

CARP1871-015 05/01/2009

COSHOCTON, HOLMES, KNOX & MORROW

Rates Fringes

Diver, Wet.......................$ 34.29 10.88 Piledrivermen; Diver, Dry........$ 22.86 10.88

CARP1871-017 05/01/2009

MAHONING & TRUMBULL

Rates Fringes

Diver, Wet.......................$ 37.31 12.38 Piledrivermen; Diver, Dry........$ 24.87 12.38

CARP2235-012 01/01/2010

COLUMBIANA & JEFFERSON

Rates Fringes

PILEDRIVERMAN....................$ 29.95 12.25

CARP2239-001 07/01/2008

CRAWFORD, OTTAWA, SANDUSKY, SENECA & WYANDOT

Rates Fringes

CARPENTER........................$ 23.71 13.28

ELEC0008-002 04/27/2009

DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING,

PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD

CABLE SPLICER....................$ 35.70 17.06

ELECTRICIAN......................$ 34.00 16.98

ELEC0032-003 06/01/2009

ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY, VAN WERT &

WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Ridgeland, Ridge & Salem Townships)

ELECTRICIAN......................$ 28.05 11.94

ELEC0032-004 06/01/1998

ALLEN, HARDIN, VAN WERT & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Richland, Ridge & Salem Townships)

Line Construction Equipment Operator..........$ 20.27 4.12+a Groundman Truck Driver......$ 14.43 3.63+a Lineman.....................$ 22.52 4.31+a

FOOTNOTE: a. Half day's Paid Holiday: The last 4 hours of the workday prior to Christmas or New Year's Day

ELEC0038-002 04/27/2009

CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) & LORAIN (Columbia Township)

ELECTRICIAN

Excluding Sound & Communications Work.........$ 34.53 16.76

ELEC0038-008 05/01/2006

CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) & LORAIN (Columbia Township)

Sound & Communication Technician Communications Technician...$ 21.20 8.12+a+b Installer Technician........$ 20.45 8.04+a+b

FOOTNOTES;

a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th;

Labor Day; Thanksgiving Day; & Christmas Day

b. 1 week's paid vacation for 1 year's service; 2 weeks' paid vacation for 2 or more years' service

ELEC0064-003 12/01/2009

COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships) MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield, Ellsworth, Coitsville, Goshen, Green, Jackson, Poland, Springfield & Youngstown Townships), & TRUMBULL (Hubbard & Liberty Townships)

ELECTRICIAN......................$ 29.68 12.26

ELEC0071-001 12/29/2008

ASHLAND, CHAMPAIGN, CLARK, COSHOCTON, CRAWFORD, DELAWARE,

FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HIGHLAND, HOCKING,

JACKSON (Coal, Jackson, Liberty, Milton, Washington & Wellston Townships), KNOX, LICKING, MADISON, MARION, MONROE, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, Peepee, Perry & Seal Townships), RICHLAND, ROSS, TUSCARAWAS (Auburn, Bucks, Clay, Jefferson, Oxford, Perry, Salem, Rush, Washington & York Townships), UNION, VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships), and WASHINGTON COUNTIES

Equipment Operators.........$ 27.45 10.51 Groundmen...................$ 19.83 8.92 Linemen & Cable Splicers....$ 30.50 11.15

ELEC0071-004 12/29/2008

AUGLAIZE, CLINTON, DARKE, GREENE, LOGAN, MERCER, MIAMI,

MONTGOMERY, PREBLE, and SHELBY COUNTIES

Equipment Operator..........$ 27.45 10.51 Groundman...................$ 19.83 8.92 Lineman & Cable Splicers....$ 30.50 11.15

ELEC0071-005 12/28/2009

ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN

Rates Fringes

LINE CONSTRUCTION: Equipment Operator DOT/Traffic Signal & Highway Lighting Projects...$ 28.39 11.49 Municipal Power/Transit Projects....................$ 33.33 12.67 LINE CONSTRUCTION: Groundman DOT/Traffic Signal & Highway Lighting Projects...$ 22.09 10.00 Municipal Power/Transit Projects....................$ 25.92 10.91

LINE CONSTRUCTION:

Linemen/Cable Splicer DOT/Traffic Signal & Highway Lighting Projects...$ 31.55 12.24 Municipal Power/Transit Projects....................$ 37.03 13.54

ELEC0071-008 12/29/2008

COLUMBIANA, MAHONING, and TRUMBULL COUNTIES

Rates Fringes

Line Construction Equipment Operator..........$ 27.45 10.51 Groundman...................$ 19.83 8.92 Lineman & Cable Splicers....$ 30.50 11.15

ELEC0071-010 12/29/2008

BELMONT, CARROLL, HARRISON, HOLMES, JEFFERSON, MEDINA, PORTAGE,

STARK, SUMMIT, and WAYNE COUNTIES

Equipment Operator..........$ 27.45 10.51 Groundman...................$ 19.83 8.92 Lineman & Cable Splicers....$ 30.50 11.15

ELEC0071-013 12/29/2008

BROWN, BUTLER, CLERMONT, HAMILTON, and WARREN COUNTIES

Rates Fringes

Line Construction Equipment Operator..........$ 27.45 10.51 Groundman...................$ 19.83 8.92 Lineman & Cable Splicers....$ 30.50 11.15

ELEC0082-002 06/01/2009

CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN

(Wayne, Clear Creek & Franklin Townships)

ELECTRICIAN......................$ 28.45 12.98

ELEC0082-006 05/24/2004

CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN

(Wayne, Clear Creek & Franklin Townships)

Sound & Communication Technician Cable Puller................$ 9.14 4.91 Installer/Technician........$ 18.28 6.32

ELEC0129-003 03/16/2009

LORAIN (Except Columbia Township) & MEDINA (Litchfield & Liverpool Townships)

ELECTRICIAN......................$ 29.85 13.76

ELEC0129-004 03/16/2009

ERIE & HURON (Lyme, Ridgefield, Norwalk, Townsend, Wakeman, Sherman, Peru, Bronson, Hartland, Clarksfield, Norwich, Greenfield, Fairfield, Fitchville & New London Townships)

ELECTRICIAN......................$ 29.85 13.76

ELEC0141-003 09/01/2009

BELMONT COUNTY

Rates Fringes

CABLE SPLICER....................$ 28.61 19.75

ELECTRICIAN......................$ 28.36 19.75

ELEC0212-003 01/01/2006

BROWN, CLERMONT & HAMILTON

Rates Fringes

Sound & Communication Technician.......................$ 20.45 6.95

ELEC0212-005 06/01/2009

BROWN, CLERMONT & HAMILTON

Rates Fringes

ELECTRICIAN......................$ 26.11 13.32

ELEC0245-003 08/28/2006

DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA,

PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD

Cable Splicer...............$ 35.85 20.25%+4.80+a Groundman/Truck Driver......$ 18.64 20.25%+4.80+a Heli-arc Welding............$ 31.47 20.25%+4.80+a Lineman.....................$ 31.17 20.25%+4.80+a Operator - Class 1..........$ 24.94 20.25%+4.80+a Operator - Class 2..........$ 21.82 20.25%+4.80+a Traffic Signal & Lighting Technician..................$ 28.05 20.25%+4.80+a

FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; & Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday.

ELEC0246-006 11/01/2009

CARROLL (South of Fox, Harrison, Rose & Washington Townships), COLUMBIANA (South of Butler, Fairfield, Knox, Salem & Unity Townships), HARRISON, and JEFFERSON COUNTIES

ELECTRICIAN......................$ 33.00 22.77+a

FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday.

ELEC0306-005 05/25/2009

MEDINA (Brunswick, Chatham, Granger, Guilford, Harrisville, Hinckley, Homer, Lafayette, Medina, Montville, Sharon, Spencer, Wadsworth, Westfield & York Townships), PORTAGE (Atwater, Aurora, Brimfield, Deerfield, Franklin, Mantua, Randolph, Ravenna, Rootstown, Shalersville, Streetsboro & Suffield Townships), SUMMIT & WAYNE (Baughman, Canaan, Chester, Chippewa, Congress, Green, Milton, & Wayne Townships)

CABLE SPLICER....................$ 34.98 5%+11.76

ELECTRICIAN......................$ 32.39 5%+11.76

ELEC0317-002 06/01/2009

GALLIA & LAWRENCE

Rates Fringes

CABLE SPLICER....................$ 32.68 18.13

ELECTRICIAN......................$ 31.12 18.08

ELEC0317-008 06/01/1998

ADAMS, ATHENS, GALLIA, JACKSON (Bloomfield, Franklin, Hamilton, Lick, Jefferson, Scioto & Madison Townships), LAWRENCE, MEIGS, PIKE (Camp Creek, Marion, Newton, Scioto, Sunfish & Union Townships), SCIOTO & VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships)

Cable Splicers..............$ 23.66 8.48 Equipment Operators.........$ 17.14 8.25 Groundmen...................$ 13.92 8.14 Linemen.....................$ 21.42 8.40

ELEC0540-003 06/05/1997

TUSCARAWAS COUNTY (North of Auburn, Clay, Rush & York Townships)

Rates Fringes

Line Construction Groundman; & Truck Driver...$ 14.65 8.18 Line Equipment Operator.....$ 19.02 8.69 Lineman; & Cable Splicer....$ 21.86 9.01

ELEC0540-005 06/01/2009

CARROLL (Northern half, including Fox, Harrison, Rose & Washington Townhships), COLUMBIANA (Knox Township), HOLMES, MAHONING (Smith Township), STARK, TUSCARAWAS (North of Auburn, Clay, Rush & York Townships), & WAYNE (South of Baughman, Chester, Green & Wayne Townships)

ELECTRICIAN......................$ 27.44 16.20

* ELEC0573-003 12/01/2009

ASHTABULA (Colebrook, Wayne, Williamsfield, Orwell & Windsor Townships), GEAUGA (Auburn, Middlefield, Parkman & Troy Townships), MAHONING (Milton Township), PORTAGE (Charlestown, Edinburg, Freedom, Hiram, Nelson, Palmyra, Paris & Windham Townships), and TRUMBULL (Except Liberty & Hubbard Townships)

ELECTRICIAN......................$ 29.15 14.20

ELEC0575-001 12/01/2009

ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON (Bloomfield, Franklin, Hamilton, Jefferson, Lick, Madison, Scioto, Coal, Jackson, Liberty, Milton & Washington Townships), PICKAWAY (Deer Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, PeePee, Perry, Seal, Camp Creek, Newton, Scioto, Sunfish, Union & Marion Townships), ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships)

ELECTRICIAN......................$ 30.79 11.88

ELEC0648-001 09/04/2006

BUTLER & WARREN (Deerfield, Hamilton, Harlan, Massie, Salem, Turtle Creek, Union & Washington Townships)

CABLE SPLICER....................$ 25.30 8.80

ELECTRICIAN......................$ 24.80 8.80

ELEC0673-004 06/02/2008

ASHTABULA (Excluding Orwell, Colebrook, Williamsfield, Wayne & Windsor Townships), GEAUGA (Burton, Chardon, Claridon, Hambden, Huntsburg, Montville, Munson, Newbury & Thompson Townships) &

LAKE

CABLE SPLICER....................$ 30.15 15.00

ELECTRICIAN......................$ 29.90 15.00

ELEC0683-002 06/01/2009

CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON,

PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships), and

UNION COUNTIES

CABLE SPLICER....................$ 28.60 12.93

ELECTRICIAN......................$ 28.00 12.91

ELEC0688-003 12/02/2009

ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley & Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown & Jefferson Townships), MARION, MORROW, RICHLAND & WYANDOT (Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships)

ELECTRICIAN......................$ 26.32 14.07

ELEC0867-001 06/01/1998

ERIE

Rates Fringes

Line Construction Lineman; Cable Splicer; & Equipment Operator..........$ 20.75 4.09 Truck Driver (Winch) Groundman; & Groundman......$ 13.49 3.87

ELEC0972-002 06/01/2009

ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships), and WASHINGTON

COUNITES

CABLE SPLICER....................$ 29.54 18.80

ELECTRICIAN......................$ 29.29 18.79

* ELEC1105-001 01/03/2010

COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hilliar, Butler, Harrison, Pleasant & College Townships), LICKING, MUSKINGUM, PERRY, and TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry & Bucks Townships) COUNTIES

ELECTRICIAN......................$ 26.59 12.97

ENGI0018-003 10/01/2009

ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA,

PORTAGE, and SUMMIT COUNTIES

OPERATOR: Power Equipment

GROUP 1.....................$ 30.48 11.66

GROUP 2.....................$ 30.38 11.66

GROUP 3.....................$ 29.34 11.66

GROUP 4.....................$ 28.12 11.66

GROUP 5.....................$ 22.83 11.66

GROUP 6.....................$ 30.73 11.66

GROUP 7.....................$ 30.98 11.66

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump;

Crane (All Types, Including Boom Truck, Cherry Picker);

Crane-Compact, Track or Rubber over 4,000 lbs. capacity;

Cranes-Self Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Horizontal Directional Drill (over 500,000 ft. lbs. thrust); Hydraulic Gantry (Lifting System); Industrial-Type Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge);

Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper;

Piledriving Machine (All Types); Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work; Rough Terrain Fork Lift with Winch/Hoist; Side-Boom; Slip-Form Paver;

Tower Derrick; Tree Shredder; Trench Machine (Over 24" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; & Wheel Excavator

GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48"; Bulldozer; Endloader; Hydro Milling Machine; Kolman-type Loader (production type-Dirt); Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications); Material Transfer Equipment (Shuttle Buggy) Asphalt; Pettibone-Rail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types; Trench Machine (24" wide & under); & Vermeer type Concrete Saw

GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer; Bobcat-type and/or Skid Steer Loader with or without Attachments; Highway Drills (all types); Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs. Pressure) Pump Operator installing & operating Well Points; Pump (4" & over discharge); Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); & Welding Machines

GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48" or less); Bull Floats; Burlap & Curing Machine;

Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand;

Farm-type Tractor with attachments (highway) except Masonry); Finishing Machine; Fireperson, Floating Equipment (all types); Fork Lift (highway); Form Trencher; Hydro Hammer; Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver; Post Hole Digger (Power Auger); Power Brush Burner;

Power Form Handling Equipment; Road Widening Trencher;

Roller (Brick, Grade & Macadam); Self-Propelled Power Spreader; Self-Propelled Power Subgrader; Steam Fireperson;

Tractor (Pulling Sheepfoot, Roller or Grader); & Vibratory Compactor with Integral Power

GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt); Generator; Masonry Fork Lift;

Inboard-Outboard Motor Boat Launch; Masonry Fork Lift; Oil Heater (asphalt plant); Oiler; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4" discharge);

Signalperson; Tire Repairperson; & VAC/ALLS

GROUP 6 - Master Mechanic & Boom from 150 to 180

GROUP 7 - Boom from 180 and over

ENGI0018-004 05/01/2009

ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN,

BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON,

COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD,

FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON,

HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES,

HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN,

LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE,

MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING,

PERRY, PICKAWAY, PIKE, PREBLE, PUTNAM, RICHLAND, ROSS,

SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN

WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD &

WYANDOT

OPERATOR: Power Equipment

GROUP 1.....................$ 29.49 11.16

GROUP 2.....................$ 29.37 11.16

GROUP 3.....................$ 28.33 11.16

GROUP 4.....................$ 27.15 11.16

GROUP 5.....................$ 21.69 11.16

GROUP 6.....................$ 29.74 11.16

GROUP 7.....................$ 29.99 11.16

OPERATING ENGINEER CLASSIFICATIONS

GROUP 1 - Air Compressor on Steel Erection; Barrier Moving Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer & Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump;

Crane (All Types, Including Boom Truck, Cherry Picker);

Crane-Compact, Track or Rubber over 4,000 lbs. capacity;

Cranes-Self Erecting, Stationary, Track or Truck (All Configurations); Derrick; Dragline; Dredge (Dipper, Clam or Suction); Elevating Grader or Euclid Loader; Floating Equipment (All Types); Gradall; Helicopter Crew (Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Horizontal Directional Drill (over 500,000 ft. lbs. thrust); Hydraulic Gantry (Lifting System); Industrial-Type Tractor; Jet Engine Dryer (D8 or D9) Diesel Tractor; Locomotive (Standard Gauge);

Maintenance Operator Class A; Mixer, Paving (Single or Double Drum); Mucking Machine; Multiple Scraper;

Piledriving Machine (All Types); Power Shovel; Prentice Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer Operation); Rotary Drill, on Caisson work; Rough Terrain Fork Lift with Winch/Hoist; Side-Boom; Slip-Form Paver;

Tower Derrick; Tree Shredder; Trench Machine (Over 24" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel Machine and/or Mining Machine; & Wheel Excavator

GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer Loader with Hoe Attachment Greater than 7,000 lbs.; Boring Machine More than 48"; Bulldozer; Endloader; Hydro Milling Machine; Kolman-type Loader (production type-Dirt); Lead Greaseman; Lighting & Traffic Signal Installation Equipment (includes all groups or classifications); Material Transfer Equipment (Shuttle Buggy) Asphalt; Pettibone-Rail Equipment; Power Grader; Power Scraper; Push Cat; Rotomill (all), Grinders & Planers of All types; Trench Machine (24" wide & under); & Vermeer type Concrete Saw

GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer; Bobcat-type and/or Skid Steer Loader with or without Attachments; Highway Drills (all types); Locomotive (narrow gauge); Material Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power Boiler (Over 15 lbs. Pressure) Pump Operator installing & operating Well Points; Pump (4" & over discharge); Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie Tampers (without lifting & aligning device); Utility Operator (Small equipment); & Welding Machines

GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh Installing Machine; Batch Plant; Boring Machine Operator (48" or less); Bull Floats; Burlap & Curing Machine;

Concrete Plant (capacity 4 yd. & under); Concrete Saw (Multiple); Conveyor (Highway); Crusher; Deckhand;

Farm-type Tractor with attachments (highway) except Masonry); Finishing Machine; Fireperson, Floating Equipment (all types); Fork Lift (highway); Form Trencher; Hydro Hammer; Hydro Seeder; Pavement Breaker; Plant Mixer; Post Driver; Post Hole Digger (Power Auger); Power Brush Burner;

Power Form Handling Equipment; Road Widening Trencher;

Roller (Brick, Grade & Macadam); Self-Propelled Power Spreader; Self-Propelled Power Subgrader; Steam Fireperson;

Tractor (Pulling Sheepfoot, Roller or Grader); & Vibratory Compactor with Integral Power

GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum Fireperson (Asphalt); Generator; Masonry Fork Lift;

Inboard-Outboard Motor Boat Launch; Masonry Fork Lift; Oil Heater (asphalt plant); Oiler; Power Driven Heater; Power Sweeper & Scrubber; Pump (under 4" discharge);

Signalperson; Tire Repairperson; & VAC/ALLS

GROUP 6 - Master Mechanic & Boom from 150 to 180

GROUP 7 - Boom from 180 and over

ENGI0066-023 06/01/2009

COLUMBIANA, MAHONING & TRUMBULL COUNTIES

Rates Fringes

OPERATOR: Power Equipment

ASBESTOS; HAZARDOUS/TOXIC

WASTE PROJECTS

GROUP 1 - A & B.............$ 34.67 14.36

ASBESTOS; HAZARDOUS/TOXIC

WASTE PROJECTS

GROUP 2 - A & B.............$ 34.34 14.36

ASBESTOS; HAZARDOUS/TOXIC

WASTE PROJECTS

GROUP 3 - A & B.............$ 31.22 14.36

ASBESTOS; HAZARDOUS/TOXIC

WASTE PROJECTS

GROUP 4 - A & B.............$ 27.61 14.36

ASBESTOS; HAZARDOUS/TOXIC

WASTE PROJECTS

GROUP 5 - A & B.............$ 24.30 14.36

HAZARDOUS/TOXIC WASTE

PROJECTS

GROUP 1 - C & D.............$ 31.78 14.36

HAZARDOUS/TOXIC WASTE

PROJECTS

GROUP 2 - C & D.............$ 31.48 14.36

HAZARDOUS/TOXIC WASTE

PROJECTS

GROUP 3 - C & D.............$ 28.62 14.36

HAZARDOUS/TOXIC WASTE

PROJECTS

GROUP 4 - C & D.............$ 25.31 14.36

HAZARDOUS/TOXIC WASTE

PROJECTS

GROUP 5 - C & D.............$ 22.28 14.36

ALL OTHER WORK

GROUP 1.....................$ 28.89 14.36

ALL OTHER WORK

GROUP 2.....................$ 28.62 14.36

ALL OTHER WORK

GROUP 3.....................$ 26.02 14.36

ALL OTHER WORK

GROUP 4.....................$ 23.01 14.36

ALL OTHER WORK

GROUP 5.....................$ 20.25 14.36

GROUP 1 - Rig, Pile Driver or Caisson Type; & Rig, Pile Hydraulic Unit Attached

GROUP 2 - Asphalt Heater Planer; Backfiller with Drag Attachment; Backhoe; Backhoe with Shear attached; Backhoe-Rear Pivotal Swing; Batch Plant-Central Mix Concrete; Batch Plant, Portable concrete; Berm Builder-Automatic; Boat Derrick; Boat-Tug;

Boring Machine Attached to Tractor; Bullclam; Bulldozer;

C.M.I. Road Builder & Similar Type; Cable Placer & Layer;

Carrier-Straddle; Carryall-Scraper or Scoop; Chicago Boom;

Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; Crane-Electric Overhead;

Crane-Rough Terrain; Crane-Side Boom; Crane-Truck;

Crane-Tower; Derrick-Boom; Derrick-Car; Digger-Wheel (Not trencher or road widener); Double Nine; Drag Line; Dredge;

Drill-Kenny or Similar Type; Easy Pour Median Barrier Machine (or similar type); Electromatic; Frankie Pile;

Gradall; Grader; Gurry; Self-Propelled; Heavy Equipment Robotics Operator/Mechanic; Hoist-Monorail;

Hoist-Stationary & Mobile Tractor; Hoist, 2 or 3 drum;

Horizontal Directional Drill Operator; Jackall; Jumbo Machine; Kocal & Kuhlman; Land-Seagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer;

Locomotive; Mechanic/Welder; Metro Chip Harvester with Boom; Mucking Machine; Paver-Asphalt Finishing Machine;

Paver-Road Concrete; Paver-Slip Form (C.M.I. or similar);

Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in Slip Form or Lift Slab Construction); Pump Crete Machine;

Regulator-Ballast; Hydraulic Power Unit not attached to Rig for Pile Drillings; Rigs-Drilling; Roto Mill or similar Full Lane (8' Wide & Over); Roto Mill or similar type (Under 8'); Shovel; Slip Form Curb Machine; Speedwing;

Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper;

Tractor-Double Boom; Tractor with Attachments; Truck-Boom;

Truck-Tire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type)

GROUP 3 - Asphalt Plant; Bending Machine (Pipeline or similar type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating Machine, Pipeline Type; Compactor; Concrete Belt Placer;

Concrete Finisher; Concrete Planer or Asphalt; Concrete Spreader; Elevator; Fork Lift (Home building only); Fork Lift Walk Behind (Hoisting over 1 buck high); Form Line Machine; Grease Truck operator; Grout Pump; Gunnite Machine; Horizontal Directional Drill Locator; Single Drum Hoist with or without Tower; Huck Bolting Machine;

Hydraulic Scaffold (Hoisting building materials); Paving Breaker (Self-propelled or Ridden); Pipe Dream; Pot Fireperson (Power Agitated); Refrigeration Plant; Road Widener; Roller; Sasgen Derrick; Seeding Machine; Soil Stabilizer (Pump type); Spray Cure Machine, Self-Propelled; Straw Blower Machine; Sub-Grader; Tube Finisher or Broom C.M.I. or similar type; & Tugger Hoist

GROUP 4 - Air Curtain Destructor & Similar Type; Batch Plant-Job Related; Boiler Operator; Compressor; Conveyor;

Curb Builder, self-propelled; Drill Wagon; Fork lift & Lulls; Generator Set; Generator-Steam; Heater-Portable Power; Hydraulic Manipulator Crane; Jack-Hydraulic Power driven; Jack-Hydraulic (Railroad); Ladavator; Minor Machine Operator; Mixer-Concrete; Mulching Machine; Pin Puller;

Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull Type); Saw-Concrete-Self-Propelled (Highway Work); Signal Person; Spray Cure Machine-Motor Powered; Stump Cutter;

Tractor; Trencher Form; Water Blaster; Steam Jenny;

Syphon; Vibrator-Gasoline; & Welding Machine

GROUP 5 - Brakeperson; Fireperson; & Oiler

IRON0017-002 08/01/2009

ASHTABULA (North of Route 6, starting at the Geauga County Line, proceeding east to State Route 45), CUYAHOGA, ERIE (Eastern 2/3), GEAUGA, HURON (East of a line drawn from the north border through Monroeville & Willard), LAKE, LORAIN, MEDINA (North of Old Rte. #224), PORTAGE (West of a line from Middlefield to Shalersville to Deerfield) & SUMMIT (North of Old Rte. #224, including city limits of Barberton)

IRONWORKER

Ornamental; Reinforcing & Structural..................$ 28.35 17.83

IRON0044-002 06/01/2009

CLINTON (South of a line drawn from Blanchester to Lynchburg), HAMILTON, HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN (South of a line drawn from Blanchester through Morrow to the west county line)

Fence Erector...............$ 23.55 16.72 Ornamental; Structural......$ 26.17 16.72

IRON0055-003 07/01/2009

CRAWFORD (Area Between lines drawn from where Hwy #598 & #30 meet through N. Liberty to the northern border & from said Hwy junction point due west to the border), DEFIANCE (S. of a line drawn from where Rte. #66 meets the northern line through Independence to the eastern county border), ERIE (Western 1/3), FULTON, HANCOCK, HARDIN (North of a line drawn from Maysville to a point 4 miles south of the northern line on the eastern line), HENRY, HURON (West of a line drawn from the northern border through Monroeville & Willard), LUCAS, OTTAWA, PUTNAM (East of a line drawn from the northern border down through Miller City to where #696 meets the southern border), SANDUSKY, SENECA, WILLIAMS (East of a line drawn from Pioneer through Stryker to the southern border), WOOD & WYANDOT (North of Rte.

#30)

Fence Erector...............$ 19.10 16.97 Flat Road Mesh..............$ 20.75 18.00 Tunnels & Caissons Under Pressure....................$ 28.50 18.00 All Other Work..............$ 28.00 18.00

IRON0147-002 06/01/2009

ALLEN (Northern half), DEFIANCE (Northern part, excluding south of a line drawn from where Rte. #66 meets the northern line through Independence to the eastern county border), MERCER (Northern half), PAULDING, PUTNAM (Western part, excluding east of a line drawn from the northern border down through Miller City to where #696 meets the southern border), VAN WERT & WILLIAMS (Western part, excluding east of a line drawn from Pioneer through Stryker to the southern border)

IRONWORKER.......................$ 24.07 16.82

IRON0172-002 06/01/2009

CHAMPAIGN (Eastern one-third), CLARK (Eastern one-fourth), COSHOCTON (West of a line beginning at the northwestern county line going through Walhonding & Tunnel Hill to the southern county line), CRAWFORD (South of Rte. #30), DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HARDIN (Excluding a line drawn from Roundhead to Maysville), HIGHLAND (Eastern one-fifth), HOCKING, JACKSON (Northern half), KNOX, LICKING, LOGAN (Eastern one-third), MADISON, MARION, MORROW, MUSKINGUM (West of a line starting at Adams Mill going to Adamsville & going from Adamsville through Blue Rock to the southern border), PERRY, PICKAWAY, PIKE (Northern half), ROSS, UNION, VINTON & WYANDOT (South of Rte. #30)

IRONWORKER.......................$ 26.52 16.05

IRON0207-004 06/01/2009

ASHTABULA (Southern part starting at the Geauga County line), COLUMBIANA (E. of a line from Damascus to Highlandtown), MAHONING (N. of Old Route #224), PORTAGE (E. of a line from Middlefield to Shalersville to Deerfield) & TRUMBULL

Layout; Sheeter.............$ 27.66 16.83 Ornamental; Reinforcing;

Structural..................$ 26.66 16.83

IRON0290-002 06/01/2009

ALLEN (Southern half), AUGLAIZE, BUTLER (North of a line drawn from east to the west county line going through Oxford, Darrtown & Woodsdale), CHAMPAIGN (Excluding east of a line drawn from Catawla to the point where #68 intersects the northern county line), CLARK (Western two-thirds), CLINTON (Excluding south of a line drawn from Blanchester to Lynchburg), DARKE, GREENE, HIGHLAND (Inside lines drawn from Marshall to Lynchburg & from the northern county line through East Monroe to Marshall), LOGAN (West of a line drawn from West Liberty to where the northern county line meets the western county line of Hardin), MERCER (Southern half), MIAMI, MONTGOMERY, PREBLE, SHELBY & WARREN (Excluding south of a line drawn from Blanchester through Morrow to the western county line)

Beyond 25 mile radius of L.U. #290 Office, Dayton....$ 25.63 17.05 Within 25 mile radius of L.U. #290 Office, Dayton....$ 25.48 17.05

IRON0348-005 08/01/2003

ASHTABULA (Eastern part from Lake Erie on the north to route #322 on the south to include Conneaut, Kingsville, Sheffield, Denmark, Dorset, Cherry Valley, Wayne, Monroe, Pierpont, Richmond, Andover & Williamsfield Townships)

Structural, excluding metal building erection & Reinforcing.................$ 22.17 13.35

IRON0372-002 06/01/2009

ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT, CLINTON (South of a line drawn from Blanchester to Lynchburg), HAMILTON, HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN(South of a line drawn from Blanchester through Morrow to the west county line)

IRONWORKER, REINFORCING

Beyond 30-mile radius of Hamilton County Courthouse..$ 26.45 16.70 Up to & including 30-mile radius of Hamilton County Courthouse..................$ 26.20 16.70

IRON0549-003 12/01/2009

BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM

(Excluding portion west of a line starting at Adams Mill going to Adamsville and going from Adamsville through Blue Rock to the south border)

IRONWORKER.......................$ 29.75 15.69

IRON0550-004 05/01/2009

ASHLAND, CARROLL, COLUMBIANA (W. of a line from Damascus to Highlandtown), COSHOCTON (E. of a line beginning at NW Co. line going through Walhonding & Tunnel Hill to the South Co. line), HOLMES, HURON (S. of Old Rte. #224), MAHONING (S. of Old Rte.

#224), MEDINA (S. of Old Rte. #224), PORTAGE (S. of Old Rte.

#224), RICHLAND, STARK, SUMMIT (S. of Old Rte. #224, Excluding city limits of Barberton), TUSCARAWAS, & WAYNE

Ironworkers:Structural, Ornamental and Reinforcing.......$ 24.63 16.32

IRON0769-004 06/01/2009

ADAMS (Eastern Half), GALLIA, JACKSON (Southern Half), LAWRENCE

& SCIOTO

ZONE 1......................$ 28.38 17.37

ZONE 2......................$ 28.78 17.37

ZONE 3......................$ 30.38 17.37

ZONE 1 - Up to 10 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave.

ZONE 2 - 10 to 50 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave.

ZONE 3 - 50 mile radius & over of Union Hall, Ashland, Ky., 1643 Greenup Ave.

* IRON0787-003 12/01/2009

ATHENS, MEIGS, MORGAN, NOBLE, and WASHINGTON COUNTIES

Rates Fringes

IRONWORKER.......................$ 30.07 16.65

LABO0265-008 05/01/2009

Rates Fringes

LABORER

ASHTABULA, ERIE, HURON,

LORAIN, LUCAS, MAHONING,

MEDINA, OTTAWA, PORTAGE,

SANDUSKY, STARK, SUMMIT,

TRUMBULL & WOOD COUNTIES

GROUP 1....................$ 25.70 7.50

GROUP 2....................$ 25.87 7.50

GROUP 3....................$ 26.20 7.50

GROUP 4....................$ 26.65 7.50

CUYAHOGA AND GEAUGA

COUNTIES ONLY: SEWAGE

PLANTS, WASTE PLANTS,

WATER TREATMENT

FACILITIES, PUMPING

STATIONS, & ETHANOL PLANTS

CONSTRUCTION................$ 28.31 7.50

CUYAHOGA, GEAUGA & LAKE

COUNTIES

GROUP 1....................$ 26.93 7.50

GROUP 2....................$ 27.10 7.50

GROUP 3....................$ 27.43 7.50

GROUP 4....................$ 27.88 7.50

REMAINING COUNTIES OF OHIO

GROUP 1....................$ 25.27 7.50

GROUP 2....................$ 25.44 7.50

GROUP 3....................$ 25.77 7.50

GROUP 4....................$ 26.22 7.50

LABORER CLASSIFICATIONS

GROUP 1 - Asphalt Laborer; Carpenter Tender; Concrete Curing Applicator; Dump Man (Batch Truck); Guardrail and Fence Installer; Joint Setter; Laborer (Construction); Landscape Laborer; Highway Lighting Worker; Signalization Worker;

Mesh Handlers & Placer; Right-of-way Laborer; Riprap Laborer & Grouter; Scaffold Erector; Seal Coating; Surface Treatment or Road Mix Laborer; Sign Installer; Slurry Seal;

Utility Man; Bridge Man; Handyman; Waterproofing Laborer;

Flagperson; Hazardous Waste (level D); Diver Tender; Zone Person & Traffic Control

GROUP 2 - Asphalt Raker; Concrete Puddler; Kettle Man Pipeline); Machine Driven Tools (Gas, Electric, Air); Mason Tender; Brick Paver; Mortar Mixer; Power Buggy or Power Wheelbarrow; Sheeting & Shoring Man; Surface Grinder Man;

Plastic Fusing Machine Operator; Pug Mill Operator; & Vacuum Devices (wet or dry); Rodding Machine Operator;

Diver; Screwman or Paver; Screed Person; Water Blast, Hand Held Wand; Pumps 4" & Under (Gas, Air or Electric) & Hazardous Waste (level C); Air Track and Wagon Drill;

Bottom Person; Cofferdam (below 25 ft. deep); Concrete Saw Person; Cutting with Burning Torch; Form Setter; Hand Spiker (Railroad); Pipelayer; Tunnel Laborer (without air) & Caisson; Underground Person (working in Sewer and Waterline, Cleaning, Repairing & Reconditioning);

Sandblaster Nozzle Person; & Hazardous Waste (level B)

GROUP 3 - Blaster; Mucker; Powder Person; Top Lander;

Wrencher (Mechanical Joints & Utility Pipeline); Yarner;

Hazardous Waste (level A); Concrete Specialist; Concrete Crew in Tunnels (With Air-pressurized - $1.00 premium);

Curb Setter & Cutter; Grade Checker; Utility Pipeline Tapper; Waterline; and Caulker

GROUP 4 - Miner (With Air-pressurized - $1.00 premium); & Gunite Nozzle Person

TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE

SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID

THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING.

PAIN0006-002 05/01/2008

ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. of the East-West Turnpike) & SUMMIT (N. of the East-West Turnpike)

PAINTER

COMMERCIAL NEW WORK;

REMODELING; & RENOVATIONS

GROUP 1....................$ 26.59 10.17

GROUP 2....................$ 26.99 10.17

GROUP 3....................$ 27.29 10.17

GROUP 4....................$ 28.29 10.17

COMMERCIAL REPAINT

GROUP 1....................$ 25.09 10.17

GROUP 2....................$ 25.49 10.17

GROUP 3....................$ 25.79 10.17

PAINTER CLASSIFICATIONS - COMMERCIAL NEW WORK; REMODELING; &

RENOVATIONS

GROUP 1 - Brush; & Roller

GROUP 2 - Sandblasting & Buffing

GROUP 3 - Spray Painting; Closed Steel Above 55 feet; Bridges & Open Structural Steel; Tanks - Water Towers; Bridge Painters; Bridge Riggers; Containment Builders

GROUP 4 - Bridge Blaster

PAINTER CLASSIFICATIONS - COMMERCIAL REPAINT

GROUP 1 - Brush; & Roller

GROUP 2 - Sandblasting & Buffing

GROUP 3 - Spray Painting

PAIN0007-002 07/01/2009

FULTON, HENRY, LUCAS, OTTAWA (Excluding Allen, Bay, Bono, Catawba Island, Clay Center, Curtice, Danbury, Eagle Beach, Elliston, Elmore, Erie, Fishback, Gem Beach & Genova) & WOOD

NEW COMMERCIAL WORK

GROUP 1....................$ 23.06 13.22

GROUP 2....................$ 23.31 13.22

GROUP 3....................$ 23.56 13.22

GROUP 4....................$ 23.66 13.22

GROUP 5....................$ 23.76 13.22

GROUP 6....................$ 23.81 13.22

GROUP 7....................$ 24.06 13.22

GROUP 8....................$ 24.36 13.22

GROUP 9....................$ 24.81 13.22

REPAINT IS 90% OF JR

PAINTER CLASSIFICATIONS

GROUP 1 - Brush; Spray & Sandblasting Pot Tender

GROUP 2 - Refineries & Refinery Tanks; Surfaces 30 ft. or over where material is applied to or labor performed on above ground level (exterior), floor level (interior)

GROUP 3 - Swing Stage & Chair

GROUP 4 - Lead Abatement

GROUP 5 - All Methods of Spray

GROUP 6 - Solvent-Based Catalized Epoxy Materials of 2 or More Component Materials, to include Solvent-Based Conversion Varnish (excluding water based)

GROUP 7 - Spray Solvent Based Material; Sand & Abrasive Blasting

GROUP 8 - Towers; Tanks; Bridges; Stacks Over 30 Feet

GROUP 9 - Epoxy Spray (excluding water based)

PAIN0012-008 06/14/2008

BUTLER

Rates Fringes

PAINTER

GROUP 1.....................$ 20.49 6.83

GROUP 2.....................$ 23.10 6.83

GROUP 3.....................$ 23.60 6.83

GROUP 4.....................$ 23.85 6.83

GROUP 5.....................$ 24.10 6.83

PAINTER CLASSIFICATIONS

GROUP 1: Bridge Equipment Tender; Bridge/Containment Builder

GROUP 2: Brush & Roller

GROUP 3: Spray

GROUP 4: Sandblasting; & Waterblasting

GROUP 5: Elevated Tanks; Steeplejack Work; Bridge; & Lead Abatement

PAIN0012-010 06/14/2008

BROWN, CLERMONT, CLINTON, HAMILTON & WARREN

Rates Fringes

PAINTER

HEAVY & HIGHWAY BRIDGES-

GUARDRAILS-LIGHTPOLES-

STRIPING

Bridge Equipment Tender and Containment Builder....$ 20.49 6.83 Bridges when highest point of clearance is 60 feet or more; & Lead Abatement Projects.........$ 24.10 6.83 Brush & Roller.............$ 23.10 6.83 Sandblasting & Hopper Tender; Water Blasting.....$ 23.85 6.83 Spray......................$ 23.60 6.83

PAIN0012-014 11/01/2009

DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY, ROSS

& UNION

Bridges.....................$ 32.95 8.87 Brush; Roller...............$ 23.47 8.87 Sandblasting;

Steamcleaning;

Waterblasting (3500 PSI or Over)& Hazardous Work.......$ 24.17 8.87 Spray.......................$ 23.97 8.87 Stacks; Tanks; & Towers.....$ 26.98 8.87 Structural Steel & Swing Stage.......................$ 23.77 8.87

PAIN0093-001 12/01/2008

ATHENS, GUERNSEY, HOCKING, MONROE, MORGAN, NOBLE & WASHINGTON

Rates Fringes

PAINTER

Base Rate; Power Generating Facilities.......$ 24.87 10.00 Bridges; Locks; Dams; High Tension Towers; Energized Substations.................$ 27.87 10.00

PAIN0249-002 05/01/2009

CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE

Rates Fringes

PAINTER

GROUP 1 - Brush & Roller....$ 22.29 8.53 GROUP 2 - Swing, Scaffold Bridges; Structural Steel;

Open Acid Tank; High Tension Electrical Equipment; & Hot Pipes......$ 22.70 8.53 GROUP 3 - Spray;

Sandblast; Steamclean;

Lead Abatement..............$ 23.04 8.53 GROUP 4 - Steeplejack Work..$ 23.24 8.53 GROUP 5 - Coal Tar..........$ 23.79 8.53 GROUP 6 - Bridge Equipment Tender & or Containment Builder.....................$ 25.88 8.53 GROUP 7 - Tanks, Stacks & Towers......................$ 26.28 8.53 GROUP 8 - Bridge Blaster, Rigger......................$ 32.25 8.53

PAIN0356-002 09/01/2009

KNOX, LICKING, MUSKINGUM, and PERRY

Rates Fringes

PAINTER

Bridge Equipment Tenders and Containment Builders....$ 27.93 7.25 Bridges; Blasters;

andRiggers..................$ 34.60 7.25 Brush and Roller............$ 20.93 7.25 Sandblasting; Steam Cleaning; Waterblasting;

and Hazardous Work..........$ 25.82 7.25 Spray.......................$ 21.40 7.25 Structural Steel and Swing Stage.......................$ 25.42 7.25 Tanks; Stacks; and Towers...$ 28.63 7.25

PAIN0438-002 12/01/2008

BELMONT, HARRISON & JEFFERSON

Rates Fringes

PAINTER

Base Rate; Power Generating Facilities.......$ 24.70 10.00 Bridges; Locks; Dams; High Tension Towers; Energized Substations.................$ 27.70 10.00

* PAIN0476-001 06/01/2009

COLUMBIANA, MAHONING, and TRUMBULL COUNITES

Rates Fringes

PAINTER

GROUP 1.....................$ 23.15 9.20

GROUP 2.....................$ 23.35 9.20

GROUP 3.....................$ 23.36 9.20

GROUP 4.....................$ 23.65 9.20

GROUP 5.....................$ 23.80 9.20

GROUP 6.....................$ 24.05 9.20

GROUP 7.....................$ 24.23 9.20

PAINTER CLASSIFICATIONS:

GROUP 1: Painters, Brush & Roller

GROUP 2: Bridges

GROUP 3: Structural Steel

GROUP 4: Spray, Except Bar Joist/Deck

GROUP 5: Epoxy/Mastic; Spray- Bar Joist/Deck; Working Above 50 Feet; and Swingstages

GROUP 6: Tanks; Sandblasting

GROUP 7: Towers; Stacks

PAIN0555-002 08/01/2009

ADAMS, HIGHLAND, JACKSON, PIKE & SCIOTO

Rates Fringes

PAINTER

GROUP 1.....................$ 24.91 12.27

GROUP 2.....................$ 26.07 12.27

GROUP 3.....................$ 27.21 12.27

GROUP 4.....................$ 29.45 12.27

PAINTER CLASSIFICATIONS

GROUP 1 - Containment Builder

GROUP 2 - Brush; Roller; Power Tools, Under 40 feet

GROUP 3 - Sand Blasting; Spray; Steam Cleaning; Pressure Washing; Epoxy & Two Component Materials; Lead Abatement;

Hazardous Waste; Toxic Materials; Bulk & Storage Tanks of 25,000 Gallon Capacity or More; Elevated Tanks

GROUP 4 - Stacks; Bridges

PAIN0603-002 06/01/2009

CARROLL, COSHOCTON, HOLMES, STARK, TUSCARAWAS & WAYNE

Rates Fringes

PAINTER

Bridges; Towers, Poles & Stacks; Sandblasting Steel; Structural Steel & Metalizing..................$ 20.94 9.37 Brush & Roller..............$ 20.23 9.37 Spray; Tank Interior & Exterior....................$ 20.76 9.37

PAIN0639…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .