Road "T" Security Gate091886D

SECTION 01 01 00

SUMMARY (WPAFB)

6/04

PART 1 - GENERAL

1.01 SCOPE OF WORK

A. The work covered by these specifications consists of furnishing all labor, equipment, appliances, devices and materials, and performing all operations necessary in connection with Security Gate Installation including removals and miscellaneous work as herein specified and as shown, indicated, or noted on the drawings.

B. The work shall conform to the drawings listed in the following schedule.

SCHEDULE OF DRAWINGS

Number Sheet Designation Date Rev Date T001 1 of 7 Title Sheet Oct 2009 C100 2 of 7 Site Plan Oct 2009 C101 3 of 7 Civil Details Oct 2009 E100 4 of 7 Site Comm & Electrical Plan Oct 2009 E101 5 of 7 Bldg 264 Electrical Plan Oct 2009 E102 6 of 7 Bldg 262-N133 Comm Plan 1 Oct 2009 E102 7 of 7 Bldg 262-N133 Comm Plan 2 Oct 2009

1.02 LOCATION

A. The site of the work is Area A Wright-Patterson Air Force Base, Ohio.

1.03 GOVERNMENT FURNISHED PROPERTY

A. No Government furnished property will be included as part of this project.

1.04 REMOVALS AND SALVAGE

A. Remove and dismantle all items which are shown to be removed or which must be removed to complete the work.

B. All materials, equipment, and debris resulting from this work and not designated for reuse in new work nor designated to be salvaged for the Government, will become the property of the contractor and shall be removed from the work site as it accumulates.

C. The contractor shall properly dispose of removed materials outside Wright-Patterson Air Force Base.

1.05 INSTRUCTIONS TO THE CONTRACTOR

A. The superintendent in charge of this work shall personally contact the Engineering Division, "Engineering Support Branch, Building 11, Area C, 88 ABW/CECM"and Contracting Officer, 88 ABW/PKE, 257-6571, a minimum of 72 hours before starting site operations of the contract, before resumption of SECTION 01 01 00 Page 1

Road "T" Security Gate091886D seasonal work, before restarting work after a lengthy delay, and prior to moving men and equipment from one site of work to another.

B. Work areas to remain occupied by Government personnel are shown on the plans.

C. The display of signs of a commercial nature within the boundaries of the installation will not be permitted. In no event will the contractor be permitted to use the government installation for the resale of surplus, structures, other improvements, or related equipment.

END OF SECTION

SECTION 01 01 00 Page 2

Other files for this federal contract opportunity

Other files attached to RECOVERY--PROJECT NUMBER ZHTV091886DR, Construct Drop Arm Gate 12A, newest first.
File Type Posted
091886DR Add 1.doc DOC document
Amendment 5.doc DOC document
VPP Safety Health Plan.doc DOC document
Question 5.doc DOC document
Amendment 4.doc DOC document
Question 4.docx DOCX document
Amendment 3.doc DOC document
Question 3.doc DOC document
Question 2.doc DOC document
Wage Decision 2.docx DOCX document
Amendment 2.doc DOC document
Question 1.docx DOCX document
Sign In Sheet - Site Visit.pdf PDF
Drawings.pdf PDF
Amendment 1.doc DOC document
Specifications.pdf PDF
Drawings.pdf PDF
Specs. 4.xps XPS file
Statement of Objectives.pdf PDF
Specs. 7.xps XPS file
Specs. 5.xps XPS file
Specs. 6.xps XPS file
Specs. 10.xps XPS file
Specs. 8.xps XPS file
Specs. 3.xps XPS file
Specs. 11.xps XPS file
Specs. 2.xps XPS file
Solicitation.doc DOC document
Wage Decision.docx DOCX document
Specs. 12.xps XPS file
Specs. 9.xps XPS file
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .