Question 3.doc
DOC document 22 KB Posted
- Attached to
- RECOVERY--PROJECT NUMBER ZHTV091886DR, Construct Drop Arm Gate 12A Federal contract opportunity
- Solicitation number
- FA8601-10-R-0017
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 091886DR Add 1.doc | DOC document | |
| VPP Safety Health Plan.doc | DOC document | |
| Amendment 5.doc | DOC document | |
| Question 5.doc | DOC document | |
| Amendment 4.doc | DOC document | |
| Question 4.docx | DOCX document | |
| Amendment 3.doc | DOC document | |
| Question 2.doc | DOC document | |
| Wage Decision 2.docx | DOCX document | |
| Amendment 2.doc | DOC document | |
| Question 1.docx | DOCX document | |
| Sign In Sheet - Site Visit.pdf | ||
| Drawings.pdf | ||
| Amendment 1.doc | DOC document | |
| Specifications.pdf | ||
| Drawings.pdf | ||
| Specs. 4.xps | XPS file | |
| Statement of Objectives.pdf | ||
| Specs. 7.xps | XPS file | |
| Specs. 5.xps | XPS file | |
| Specs. 6.xps | XPS file | |
| Specs. 10.xps | XPS file | |
| Specs. 8.xps | XPS file | |
| Specs. 9.xps | XPS file | |
| Specs. 1.xps | XPS file | |
| Specs. 3.xps | XPS file | |
| Specs. 11.xps | XPS file | |
| Specs. 2.xps | XPS file | |
| Solicitation.doc | DOC document | |
| Wage Decision.docx | DOCX document | |
| Specs. 12.xps | XPS file |
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
There are several utilities shown on the drawings that may affect the required concrete footings for the K-Rated gate. Will these utilities be required to be moved and or abandon to accommodate the location of the gate?
THE EXISTING MAPPING WAS GENERATED FROM GIS DATA AND NOT ACTUAL FIELD SURVEY. THEREFORE, THE EXACT LOCATIONS OF THE UTILITIES AND OTHER FEATURES MAPPED ARE NOT EXACT AND WILL HAVE TO BE FIELD LOCATED PRIOR TO CONSTRUCTION. ANY CONFLICTS WILL HAVE TO BE TAKEN INTO CONSIDERATION ON A CASE BY CASE BASIS. IT IS ANTICIPATED THAT IF THERE ARE CONFLICTS WITH UTILITIES SUCH AS ELECTRIC THAT ARE IN DUCT WORK THAT WE WILL ENCASE THE UTILITY IN CONCRETE. RELOCATION OF UTILITIES IS NOT ANTICIPATED.
On drawing 2 of 7 under gate specifications it talks about a quarterly preventative maintenance for the gate operator. Is this just for 1 year after accepted completion?
THIS PREVENTATIVE MAINTENANCE SHALL BE FOR A PERIOD ONE YEAR UPON COMPLETION AND ACCEPTANCE OF THE CONSTRUCTION.