Other files attached to RECOVERY--PROJECT NUMBER ZHTV091886DR, Construct Drop Arm Gate 12A, newest first.
File Type Posted
091886DR Add 1.doc DOC document
VPP Safety Health Plan.doc DOC document
Amendment 5.doc DOC document
Question 5.doc DOC document
Amendment 4.doc DOC document
Question 4.docx DOCX document
Amendment 3.doc DOC document
Question 2.doc DOC document
Wage Decision 2.docx DOCX document
Amendment 2.doc DOC document
Question 1.docx DOCX document
Sign In Sheet - Site Visit.pdf PDF
Drawings.pdf PDF
Amendment 1.doc DOC document
Specifications.pdf PDF
Drawings.pdf PDF
Specs. 4.xps XPS file
Statement of Objectives.pdf PDF
Specs. 7.xps XPS file
Specs. 5.xps XPS file
Specs. 6.xps XPS file
Specs. 10.xps XPS file
Specs. 8.xps XPS file
Specs. 9.xps XPS file
Specs. 1.xps XPS file
Specs. 3.xps XPS file
Specs. 11.xps XPS file
Specs. 2.xps XPS file
Solicitation.doc DOC document
Wage Decision.docx DOCX document
Specs. 12.xps XPS file
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

There are several utilities shown on the drawings that may affect the required concrete footings for the K-Rated gate. Will these utilities be required to be moved and or abandon to accommodate the location of the gate?

THE EXISTING MAPPING WAS GENERATED FROM GIS DATA AND NOT ACTUAL FIELD SURVEY. THEREFORE, THE EXACT LOCATIONS OF THE UTILITIES AND OTHER FEATURES MAPPED ARE NOT EXACT AND WILL HAVE TO BE FIELD LOCATED PRIOR TO CONSTRUCTION. ANY CONFLICTS WILL HAVE TO BE TAKEN INTO CONSIDERATION ON A CASE BY CASE BASIS. IT IS ANTICIPATED THAT IF THERE ARE CONFLICTS WITH UTILITIES SUCH AS ELECTRIC THAT ARE IN DUCT WORK THAT WE WILL ENCASE THE UTILITY IN CONCRETE. RELOCATION OF UTILITIES IS NOT ANTICIPATED.

On drawing 2 of 7 under gate specifications it talks about a quarterly preventative maintenance for the gate operator. Is this just for 1 year after accepted completion?

THIS PREVENTATIVE MAINTENANCE SHALL BE FOR A PERIOD ONE YEAR UPON COMPLETION AND ACCEPTANCE OF THE CONSTRUCTION.