View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY--PROJECT NUMBER ZHTV091886DR, Construct Drop Arm Gate 12A, newest first.
File Type Posted
091886DR Add 1.doc DOC document
VPP Safety Health Plan.doc DOC document
Amendment 5.doc DOC document
Question 5.doc DOC document
Amendment 4.doc DOC document
Question 4.docx DOCX document
Amendment 3.doc DOC document
Question 3.doc DOC document
Question 2.doc DOC document
Wage Decision 2.docx DOCX document
Amendment 2.doc DOC document
Question 1.docx DOCX document
Sign In Sheet - Site Visit.pdf PDF
Drawings.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
Specs. 4.xps XPS file
Statement of Objectives.pdf PDF
Specs. 7.xps XPS file
Specs. 5.xps XPS file
Specs. 6.xps XPS file
Specs. 10.xps XPS file
Specs. 8.xps XPS file
Specs. 9.xps XPS file
Specs. 1.xps XPS file
Specs. 3.xps XPS file
Specs. 11.xps XPS file
Specs. 2.xps XPS file
Solicitation.doc DOC document
Wage Decision.docx DOCX document
Specs. 12.xps XPS file
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION I - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

SCHEDULE OF DRAWINGS PROJECT - # 091886DR

DRAWING

SHEET

TITLE NUMBER

DATE

T001

Title Sheet

01/22/2010

C100

Site Plan

C101

Civil Details

E100

Site Comm & Electrical Plan

E101

Bldg. 264 Electrical Plan

E102

Bldg. 262 Comm. Details 1

E103

Bldg. 262 Comm. Details 2

01/22/2010

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been modified:

DOCUMENTS, SPECS AND DRAWINGS

Documents, Exhibits and Other Attachments Table of Contents

Attachment

Description

Pages

Date

Drawings Project# 091886DR

Specifications Project# 091886DR

12/09/2009

Wage Decision

01/01/2010

OH080002, Mod 27

(End of Summary of Changes)