Wage Dec OH080002 Mod 8.pdf
PDF 264 KB Posted
- Solicitation number
- FA8601-08-R-0034
About this file
Wage Decision Mod 8
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0006.doc | DOC document | |
| Amendment 0005.doc | DOC document | |
| Amendment 0004.doc | DOC document | |
| Addendum 2.doc | DOC document | |
| Amendment 0003.doc | DOC document | |
| Site Visit Attendance.pdf | ||
| Questions and Responses.pdf | ||
| Conformed Solicitation.doc | DOC document | |
| Amendment 0002.doc | DOC document | |
| Amendment 0001.doc | DOC document | |
| Wage Dec OH080002 Mod 7.pdf | ||
| Addendum 1.doc | DOC document | |
| Solicitation.doc | DOC document | |
| Specs 04-0052.pdf | ||
| Drawings 05-0013.pdf | ||
| Specs 05-0013.pdf | ||
| Wage Decision OH080029 4 Jul 08 Mod 6.docx | DOCX document | |
| Drawings 04-0052.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: OH080002 08/15/2008 OH2
Superseded General Decision Number: OH20070002
State: Ohio
Construction Types: Heavy and Highway
Counties: Ohio Statewide.
Heavy and Highway Construction Projects
Modification Number Publication Date
0 02/08/2008
1 02/15/2008
2 03/07/2008
3 04/04/2008
4 05/02/2008
5 06/06/2008
6 07/04/2008
7 08/01/2008
8 08/15/2008
BRKY0007-003 06/01/2008
LAWRENCE
Rates Fringes
Bricklayer, Stonemason...........$ 25.80 14.88
BROH0001-001 07/01/2007
DEFIANCE, FULTON (Excluding Fulton, Amboy & Swan Creek
Townships), HENRY (Excluding Monroe, Bartlow, Liberty, Washington, Richfield, Marion, Damascus & Townships & that part of Harrison Township outside corporate limits of city of
Napoleon), PAULDING, PUTNAM & WILLIAMS
Bricklayer, Stonemason...........$ 29.90 7.83
* BROH0001-004 06/01/2008
CEMENT MASON/CONCRETE FINISHER...$ 25.75 8.60
BROH0003-002 07/01/2007
FULTON (Townships of Amboy, Swan Creek & Fulton), HENRY
(Townships of Washington, Damascus, Richfield, Bartlow, Liberty, Harrison, Monroe, & Marion), LUCAS & WOOD (Townships of Perrysburg, Ross, Lake, Troy, Freedom, Montgomery, Webster, Center, Portage, Middleton, Plain, Liberty, Henry, Washington, Weston, Milton, Jackson & Grand Rapids)
Bricklayer, Stonemason...........$ 27.89 11.98
BROH0005-003 05/01/2008
CUYAHOGA, LORAIN & MEDINA (Hinckley, Granger, Brunswick, Liverpool, Montville, York, Homer, Harrisville, Chatham, Litchfield & Spencer Townships and the city of Medina)
BRICKLAYER
BRICKLAYERS; CAULKERS;
CLEANERS; POINTERS; &
STONEMASONS.................$ 29.47 10.50
SANDBLASTERS................$ 29.72 10.50
SEWER BRICKLAYERS; STACK
BUILDERS; & SWING SCAFFOLDS.$ 29.97 10.50
BROH0006-005 05/01/2008
CARROLL, COLUMBIANA (Knox, Butler, West & Hanover Townships), STARK & TUSCARAWAS
Bricklayer, Stonemason...........$ 25.58 10.15
BROH0007-005 06/01/2007
PORTAGE & SUMMIT
BRICKLAYER.......................$ 27.45 10.25
* BROH0007-010 06/01/2008
MASON - STONE....................$ 27.47 7.55
* BROH0008-001 06/01/2008
COLUMBIANA (Salem, Perry, Fairfield, Center, Elk Run, Middleton, & Unity Townships and the city of New Waterford) &
MAHONING, and the city of Youngstown
BRICKLAYER.......................$ 24.55 13.23
* BROH0009-002 07/01/2008
BELMONT, JEFFERSON (Warren & Mt. Pleasant Townships & the
Village of Dillonvale) & MONROE
Bricklayer, Stonemason...........$ 23.00 13.75
Refractory.......................$ 27.22 13.75
BROH0010-002 07/01/2008
COLUMBIANA (St. Clair, Madison, Wayne, Franklin, Washington, Yellow Creek & Liverpool Townships) & JEFFERSON (Brush Creek &
Saline Townships)
Bricklayer, Stonemason...........$ 24.20 12.11
BROH0014-002 07/01/2005
HARRISON & JEFFERSON (Except Mt. Pleasant, Warren, Brush Creek, Saline & Salineville Townships & the Village of Dillonvale)
Bricklayer, Stonemason...........$ 24.01 8.85
BROH0016-002 05/01/2008
ASHTABULA, GEAUGA & LAKE
Bricklayer, Stonemason...........$ 28.99 10.70
* BROH0018-002 06/01/2008
BROWN, BUTLER, CLERMONT, HAMILTON, PREBLE (Gasper, Dixon, Israel, Lanier, Somers & Gratis Townships) & WARREN COUNTIES:
Bricklayer, Stonemason...........$ 26.11 9.49
BROH0022-004 07/01/2007
CHAMPAIGN, CLARK, CLINTON, DARKE, GREENE, HIGHLAND, LOGAN,
MIAMI, MONTGOMERY, PREBLE (Jackson, Monroe, Harrison, Twin, Jefferson & Washington Townships) & SHELBY
Bricklayer, Stonemason...........$ 25.20 9.24
BROH0032-001 06/01/2008
GALLIA & MEIGS
Bricklayer, Stonemason...........$ 27.71 11.00
BROH0035-002 07/01/2007
ALLEN, AUGLAIZE, MERCER & VAN WERT
Bricklayer, Stonemason...........$ 24.08 9.82
BROH0039-002 06/01/2008
ADAMS & SCIOTO
Bricklayer, Stonemason...........$ 25.62 13.85
BROH0040-003 06/01/2007
ASHLAND, CRAWFORD, HARDIN, HOLMES, MARION, MORROW, RICHLAND,
WAYNE & WYANDOT (Except Crawford, Ridge, Richland & Tymochtee
Townships)
Bricklayer, Stonemason...........$ 24.61 13.20
Layout Man and Sawman rate: $1.00 per hour above journeyman rate.
Free standing stack work ground level to top of stack;
Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.
"Hot" work: $2.50 above journeyman rate.
BROH0043-002 06/01/2007
TRUMBULL COUNTY (Except city of Youngstown)
Bricklayer, Stonemason...........$ 26.25 10.48
* BROH0044-002 06/01/2008
Bricklayer, Stonemason
COSHOCTON, FAIRFIELD,
GUERNSEY, HOCKING, KNOX,
KICKING, MORGAN,
MUSKINGUM, NOBLE (Beaver, Buffalo, Seneca & Wayne
Townships) & PERRY
COUNTIES:...................$ 24.70 9.65
BROH0045-002 06/01/2008
FAYETTE, JACKSON, PIKE, ROSS & VINTON
Bricklayer, Stonemason...........$ 27.72 9.35
BROH0046-002 06/01/2007
ERIE, HANCOCK, HURON, OTTAWA, SANDUSKY, SENECA, WOOD (Perry &
Bloom Townships) & WYANDOT (Tymochtee, Crawford, Ridge &
Richland Townships), & the islands of Lake Erie north of
Sandusky.
Bricklayer, Stonemason...........$ 25.18 13.20
Layout Man and Sawman rate: $1.00 per hour above journeyman rate.
Free standing stack work ground level to top of stack;
Sandblasting and laying of carbon masonry material in swing stage and/or scaffold; Ramming and spading of plastics and gunniting: $1.50 per hour above journeyman rate.
"Hot" work: $2.50 above journeyman rate.
BROH0052-001 06/01/2007
ATHENS
Bricklayer, Stonemason...........$ 24.88 9.90
BROH0052-003 06/01/2007
NOBLE (Brookfield, Noble, Center, Sharon, Olive, Enoch, Stock, Jackson, Jefferson & Elk Townships) & WASHINGTON
Bricklayer, Stonemason...........$ 24.32 9.90
BROH0055-003 06/01/2008
DELAWARE, FRANKLIN, MADISON, PICKAWAY & UNION
Bricklayer, Stonemason...........$ 27.09 10.11
CARP0003-004 05/01/2008
MAHONING & TRUMBULL
CARPENTER........................$ 23.61 11.96
CARP0069-003 05/01/2008
CARROLL, STARK, TUSCARAWAS & WAYNE
CARPENTER........................$ 23.78 10.53
CARP0069-006 05/01/2008
COSHOCTON, HOLMES, KNOX & MORROW
CARPENTER........................$ 22.44 9.91
CARP0171-002 05/01/2008
BELMONT, COLUMBIANA, HARRISON, JEFFERSON & MONROE
CARPENTER........................$ 23.19 12.20
CARP0248-005 07/01/2008
LUCAS & WOOD
CARPENTER........................$ 27.27 14.58
CARP0248-008 07/01/2008
CARPENTER
DEFIANCE, FULTON, HANCOCK,
HENRY, PAULDING & WILLIAMS
COUNTIES....................$ 23.71 13.28
CARP0254-002 05/01/2008
ASHTABULA, CUYAHOGA, GEAUGA & LAKE
CARPENTER........................$ 29.50 11.17
CARP0372-002 07/01/2008
ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM & VAN WERT
CARPENTER........................$ 23.18 13.28
CARP0639-003 05/01/2008
MEDINA, PORTAGE & SUMMIT
CARPENTER........................$ 27.41 11.50
CARP0735-002 05/01/2008
ASHLAND, ERIE, HURON, LORAIN & RICHLAND
CARPENTER........................$ 23.07 10.15
CARP1311-001 05/01/2008
BROWN, BUTLER, CHAMPAIGN, CLARK, CLERMONT, CLINTON, DARKE,
GREENE, HAMILTON, LOGAN, MIAMI, MONTGOMERY, PREBLE, SHELBY &
WARREN
Carpenter & Piledrivermen........$ 25.80 9.69
Diver............................$ 38.70 9.69
CARP1393-002 07/01/2008
CRAWFORD, DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA,
PAULDING, SANDUSKY, SENECA, WILLIAMS & WOOD
Piledrivermen & Diver's Tender...$ 27.30 16.05
DIVERS - $250.00 per day
CARP1393-003 07/01/2008
ALLEN, AUGLAIZE, HARDIN, MERCER, PUTNAM, VAN WERT & WYANDOT
Piledrivermen & Diver's Tender...$ 25.15 15.92
DIVERS - $250.00 per day
CARP1871-006 05/01/2008
BELMONT, HARRISON, & MONROE
Diver, Wet.......................$ 42.08 11.95
Piledrivermen; Diver, Dry........$ 28.05 11.95
CARP1871-008 05/01/2008
ASHLAND, ASHTABULA, CUYAHOGA, ERIE, GEAUGA, HURON, LAKE,
LORAIN, MEDINA, PORTAGE, RICHLAND & SUMMIT
Diver, Wet.......................$ 42.00 12.67
Piledrivermen; Diver, Dry........$ 28.00 12.67
CARP1871-014 05/01/2008
CARROLL, STARK, TUSCARAWAS & WAYNE
Diver, Wet.......................$ 34.88 11.54
Piledrivermen; Diver, Dry........$ 23.25 11.54
CARP1871-015 05/01/2008
COSHOCTON, HOLMES, KNOX & MORROW
Diver, Wet.......................$ 33.53 10.69
Piledrivermen; Diver, Dry........$ 22.35 10.69
CARP1871-017 05/01/2008
Diver, Wet.......................$ 36.54 12.19
Piledrivermen; Diver, Dry........$ 24.36 12.19
CARP2239-001 07/01/2008
CRAWFORD, OTTAWA, SANDUSKY, SENECA & WYANDOT
CARPENTER........................$ 23.71 13.28
CARP2264-004 01/01/2002
COLUMBIANA & JEFFERSON
PILEDRIVERMAN....................$ 23.82 8.48
CARP9904-001 05/01/2000
ADAMS, ATHENS, DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, GALLIA,
GUERNSEY, HIGHLAND, HOCKING, JACKSON, LAWRENCE, LICKING,
MADISON, MARION, MEIGS, MORGAN, MUSKINGUM, NOBLE, PERRY,
PICKAWAY, PIKE, ROSS, SCIOTO, UNION, VINTON & WASHINGTON
Carpenter & Piledrivermen........$ 21.86 5.27
Diver............................$ 32.79 5.27
ELEC0008-002 04/23/2007
DEFIANCE, FULTON, HANCOCK, HENRY, LUCAS, OTTAWA, PAULDING,
PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD
CABLE SPLICER....................$ 33.67 15.45
ELECTRICIAN......................$ 32.07 15.37
ELEC0032-003 06/01/2008
ALLEN, AUGLAIZE, HARDIN, LOGAN, MERCER, SHELBY, VAN WERT &
WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Ridgeland, Ridge & Salem Townships)
ELECTRICIAN......................$ 27.05 11.91
ELEC0032-004 06/01/1998
ALLEN, HARDIN, VAN WERT & WYANDOT (Crawford, Jackson, Marseilles, Mifflin, Richland, Ridge & Salem Townships)
Line Construction
Equipment Operator..........$ 20.27 4.12+a
Groundman Truck Driver......$ 14.43 3.63+a
Lineman.....................$ 22.52 4.31+a
FOOTNOTE: a. Half day's Paid Holiday: The last 4 hours of the workday prior to Christmas or New Year's Day
ELEC0038-002 05/05/2008
CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) &
LORAIN (Columbia Township)
ELECTRICIAN
Excluding Sound &
Communications Work.........$ 33.78 15.63
ELEC0038-008 05/01/2006
CUYAHOGA, GEAUGA (Bainbridge, Chester & Russell Townships) &
LORAIN (Columbia Township)
Sound & Communication
Technician
Communications Technician...$ 21.20 8.12+a+b
Installer Technician........$ 20.45 8.04+a+b
FOOTNOTES;
a. 6 Paid Holidays: New Year's Day; Memorial Day; July 4th;
Labor Day; Thanksgiving Day; & Christmas Day
b. 1 week's paid vacation for 1 year's service; 2 weeks' paid vacation for 2 or more years' service
ELEC0064-003 12/03/2007
COLUMBIANA (Butler, Fairfield, Perry, Salem & Unity Townships)
MAHONING (Austintown, Beaver, Berlin, Boardman, Canfield, Ellsworth, Coitsville, Goshen, Green, Jackson, Poland, Springfield & Youngstown Townships), & TRUMBULL (Hubbard &
Liberty Townships)
ELECTRICIAN......................$ 28.25 11.92`
ELEC0071-001 05/29/2006
ASHLAND, CHAMPAIGN, CLARK, COSHOCTON, CRAWFORD, DELAWARE,
FAIRFIELD, FAYETTE, FRANKLIN, GUERNSEY, HIGHLAND, HOCKING,
JACKSON (Coal, Jackson, Liberty, Milton, Washington & Wellston
Townships), KNOX, LICKING, MADISON, MARION, MONROE, MORGAN, MORROW, MUSKINGUM, NOBLE, PERRY, PICKAWAY, PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, Peepee, Perry & Seal
Townships), RICHLAND, ROSS, TUSCARAWAS (Auburn, Bucks, Clay, Jefferson, Oxford, Perry, Salem, Rush, Washington & York
Townships), UNION, VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships) & WASHINGTON
Equipment Operators.........$ 25.47 9.78
Groundmen...................$ 18.40 8.38
Linemen; Cable Splicers.....$ 28.30 10.34
ELEC0071-004 05/29/2006
AUGLAIZE, CLINTON, DARKE, GREENE, LOGAN, MERCER, MIAMI,
MONTGOMERY, PREBLE & SHELBY
Equipment Operator..........$ 25.47 9.78
Groundman...................$ 18.40 8.38
Lineman.....................$ 28.30 10.34
ELEC0071-005 06/05/2006
ASHTABULA, CUYAHOGA, GEAUGA, LAKE & LORAIN
Cable Splicer; Lineman......$ 35.30 12.07
Equipment Operator..........$ 31.77 11.34
Groundman...................$ 24.71 9.88
ELEC0071-008 05/29/2006
COLUMBIANA, MAHONING & TRUMBULL
Groundman...................$ 18.40 8.38
Lineman.....................$ 28.30 10.34
ELEC0071-010 05/29/2006
BELMONT, CARROLL, HARRISON, HOLMES, JEFFERSON, MEDINA, PORTAGE,
STARK, SUMMIT & WAYNE
Groundman...................$ 18.40 8.38
Lineman.....................$ 28.30 10.34
ELEC0071-013 05/29/2006
BROWN, BUTLER, CLERMONT, HAMILTON & WARREN
Groundman...................$ 18.40 8.38
Lineman.....................$ 28.30 10.34
ELEC0082-002 06/02/2008
CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN
(Wayne, Clear Creek & Franklin Townships)
ELECTRICIAN......................$ 29.45 10.94
ELEC0082-006 05/24/2004
CLINTON, DARKE, GREENE, MIAMI, MONTGOMERY, PREBLE & WARREN
(Wayne, Clear Creek & Franklin Townships)
Cable Puller................$ 9.14 4.91
Installer/Technician........$ 18.28 6.32
ELEC0129-003 03/01/2001
LORAIN (Except Columbia Township) & MEDINA (Litchfield &
Liverpool Townships)
ELECTRICIAN......................$ 27.25 6.85
ELEC0129-004 09/01/2001
ERIE & HURON (Lyme, Ridgefield, Norwalk, Townsend, Wakeman, Sherman, Peru, Bronson, Hartland, Clarksfield, Norwich, Greenfield, Fairfield, Fitchville & New London Townships)
ELECTRICIAN......................$ 27.25 6.85
ELEC0141-003 09/03/2007
BELMONT
CABLE SPLICER....................$ 25.41 18.17
ELECTRICIAN......................$ 25.16 18.17
ELEC0212-003 11/01/2000
BROWN, CLERMONT & HAMILTON
Cable Puller................$ 9.00 2.64
Installer...................$ 18.00 3.475
ELEC0212-005 06/04/2007
BROWN, CLERMONT & HAMILTON
ELECTRICIAN......................$ 25.56 11.25
ELEC0245-003 08/28/2006
DEFIANCE, FULTON, HANCOCK, HENRY, HURON, LUCAS, OTTAWA,
PAULDING, PUTNAM, SANDUSKY, SENECA, WILLIAMS & WOOD
Cable Splicer...............$ 35.85 20.25%+4.80+a
Groundman/Truck Driver......$ 18.64 20.25%+4.80+a
Heli-arc Welding............$ 31.47 20.25%+4.80+a
Lineman.....................$ 31.17 20.25%+4.80+a
Operator - Class 1..........$ 24.94 20.25%+4.80+a
Operator - Class 2..........$ 21.82 20.25%+4.80+a
Traffic Signal & Lighting
Technician..................$ 28.05 20.25%+4.80+a
FOOTNOTE: a. 6 Observed Holidays: New Year's Day; Memorial
Day; Independence Day; Labor Day; Thanksgiving Day; &
Christmas Day. Employees who work on a holiday shall be paid at a rate of double their applicable classified straight-time rates for the work performed on such holiday.
ELEC0246-006 10/29/2007
CARROLL (South of Fox, Harrison, Rose & Washington Townships), COLUMBIANA (South of Butler, Fairfield, Knox, Salem & Unity
Townships), HARRISON & JEFFERSON
ELECTRICIAN......................$ 31.00 18.29+a
FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday
* ELEC0306-005 05/26/2008
MEDINA (Brunswick, Chatham, Granger, Guilford, Harrisville, Hinckley, Homer, Lafayette, Medina, Montville, Sharon, Spencer, Wadsworth, Westfield & York Townships), PORTAGE (Atwater, Aurora, Brimfield, Deerfield, Franklin, Mantua, Randolph, Ravenna, Rootstown, Shalersville, Streetsboro & Suffield
Townships), SUMMIT & WAYNE (Baughman, Canaan, Chester, Chippewa, Congress, Green, Milton, & Wayne Townships)
CABLE SPLICER....................$ 33.52 5%+11.76
ELECTRICIAN......................$ 31.04 5%+11.76
* ELEC0317-002 06/01/2008
GALLIA & LAWRENCE
CABLE SPLICER....................$ 30.79 17.97
ELECTRICIAN......................$ 29.32 17.93
ELEC0317-008 06/01/1998
ADAMS, ATHENS, GALLIA, JACKSON (Bloomfield, Franklin, Hamilton, Lick, Jefferson, Scioto & Madison Townships), LAWRENCE, MEIGS, PIKE (Camp Creek, Marion, Newton, Scioto, Sunfish & Union
Townships), SCIOTO & VINTON (Brown, Knox, Madison, Vinton &
Wilkesville Townships)
Cable Splicers..............$ 23.66 8.48
Equipment Operators.........$ 17.14 8.25
Groundmen...................$ 13.92 8.14
Linemen.....................$ 21.42 8.40
ELEC0540-003 06/05/1997
TUSCARAWAS COUNTY (North of Auburn, Clay, Rush & York Townships)
Groundman; & Truck Driver...$ 14.65 8.18
Line Equipment Operator.....$ 19.02 8.69
Lineman; & Cable Splicer....$ 21.86 9.01
ELEC0540-005 05/28/2007
CARROLL (Northern half, including Fox, Harrison, Rose &
Washington Townhships), COLUMBIANA (Knox Township), HOLMES, MAHONING (Smith Township), STARK, TUSCARAWAS (North of Auburn, Clay, Rush & York Townships), & WAYNE (South of Baughman, Chester, Green & Wayne Townships)
ELECTRICIAN......................$ 26.69 15.63
ELEC0573-003 06/02/2008
ASHTABULA (Colebrook, Wayne, Williamsfield, Orwell & Windsor
Townships), GEAUGA (Auburn, Middlefield, Parkman & Troy
Townships), MAHONING (Milton Township), PORTAGE (Charlestown, Edinburg, Freedom, Hiram, Nelson, Palmyra, Paris & Windham
Townships) & TRUMBULL (Except Liberty & Hubbard Townships)
ELECTRICIAN......................$ 29.60 12.31
ELEC0575-001 06/02/2008
ADAMS, FAYETTE, HIGHLAND, HOCKING, JACKSON (Bloomfield, Franklin, Hamilton, Jefferson, Lick, Madison, Scioto, Coal, Jackson, Liberty, Milton & Washington Townships), PICKAWAY
(Deer Creek, Perry, Pickaway, Salt Creek & Wayne Townships), PIKE (Beaver, Benton, Jackson, Mifflin, Pebble, PeePee, Perry, Seal, Camp Creek, Newton, Scioto, Sunfish, Union & Marion
Townships), ROSS, SCIOTO & VINTON (Clinton, Eagle, Elk, Harrison, Jackson, Richland & Swan Townships)
ELECTRICIAN......................$ 29.60 11.79
ELEC0648-001 09/04/2006
BUTLER & WARREN (Deerfield, Hamilton, Harlan, Massie, Salem, Turtle Creek, Union & Washington Townships)
CABLE SPLICER....................$ 25.30 8.80
ELECTRICIAN......................$ 24.80 8.80
ELEC0673-004 06/02/2008
ASHTABULA (Excluding Orwell, Colebrook, Williamsfield, Wayne &
Windsor Townships), GEAUGA (Burton, Chardon, Claridon, Hambden, Huntsburg, Montville, Munson, Newbury & Thompson Townships) &
LAKE
CABLE SPLICER....................$ 30.15 15.00
ELECTRICIAN......................$ 29.90 15.00
ELEC0683-002 06/02/2008
CHAMPAIGN, CLARK, DELAWARE, FAIRFIELD, FRANKLIN, MADISON,
PICKAWAY (Circleville, Darby, Harrison, Jackson, Madison, Monroe, Muhlenberg, Scioto, Walnut & Washington Townships) &
UNION
CABLE SPLICER....................$ 29.35 11.70
ELECTRICIAN......................$ 28.75 11.68
ELEC0688-003 05/28/2008
ASHLAND, CRAWFORD, HURON (Richmond, New Haven, Ripley &
Greenwich Townships), KNOX (Liberty, Clinton, Union, Howard, Monroe, Middleberry, Morris, Wayne, Berlin, Pike, Brown &
Jefferson Townships), MARION, MORROW, RICHLAND & WYANDOT
(Sycamore, Crane, Eden, Pitt, Antrim & Tymochtee Townships)
ELECTRICIAN......................$ 25.33 13.53
ELEC0867-001 06/01/1998
ERIE
Lineman; Cable Splicer; &
Equipment Operator..........$ 20.75 4.09
Truck Driver (Winch)
Groundman; & Groundman......$ 13.49 3.87
ELEC0972-002 06/01/2007
ATHENS, MEIGS, MONROE, MORGAN, NOBLE, VINTON (Brown, Knox, Madison, Vinton & Wilkesville Townships) & WASHINGTON
CABLE SPLICER....................$ 27.73 17.75
ELECTRICIAN......................$ 27.48 17.74
ELEC1105-001 06/01/2008
COSHOCTON, GUERNSEY, KNOX (Jackson, Clay, Morgan, Miller, Milford, Hilliar, Butler, Harrison, Pleasant & College
Townships), LICKING, MUSKINGUM, PERRY & TUSCARAWAS (Auburn, York, Clay, Jefferson, Rush, Oxford, Washington, Salem, Perry &
Bucks Townships)
ELECTRICIAN......................$ 26.94 11.64
ENGI0018-003 05/31/2008
ASHTABULA, CUYAHOGA, ERIE, GEAUGA, LAKE, LORAIN, MEDINA,
OPERATOR: Power Equipment
GROUP 1.....................$ 30.03 10.81
GROUP 2.....................$ 29.93 10.81
GROUP 3.....................$ 28.89 10.81
GROUP 4.....................$ 27.67 10.81
GROUP 5.....................$ 22.38 10.81
GROUP 6.....................$ 30.28 10.81
GROUP 7.....................$ 30.53 10.81
OPERATING ENGINEER CLASSIFICATIONS
GROUP 1 - Air Compressor on Steel Erection; Barrier Moving
Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer &
Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump;
Crane (All Types, Including Boom Truck, Cherry Picker);
Crane-Compact, Track or Rubber over 4,000 lbs. capacity;
Cranes-Self Erecting, Stationary, Track or Truck (All
Configurations); Derrick; Dragline; Dredge (Dipper, Clam or
Suction); Elevating Grader or Euclid Loader; Floating
Equipment (All Types); Gradall; Helicopter Crew
(Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Horizontal Directional Drill (over
500,000 ft. lbs. thrust); Hydraulic Gantry (Lifting
System); Industrial-Type Tractor; Jet Engine Dryer (D8 or
D9) Diesel Tractor; Locomotive (Standard Gauge);
Maintenance Operator Class A; Mixer, Paving (Single or
Double Drum); Mucking Machine; Multiple Scraper;
Piledriving Machine (All Types); Power Shovel; Prentice
Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer
Operation); Rotary Drill, on Caisson work; Rough Terrain
Fork Lift with Winch/Hoist; Side-Boom; Slip-Form Paver;
Tower Derrick; Tree Shredder; Trench Machine (Over 24" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel
Machine and/or Mining Machine; & Wheel Excavator
GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer
Loader with Hoe Attachment Greater than 7,000 lbs.; Boring
Machine More than 48"; Bulldozer; Endloader; Hydro Milling
Machine; Kolman-type Loader (production type-Dirt); Lead
Greaseman; Lighting & Traffic Signal Installation Equipment
(includes all groups or classifications); Material Transfer
Equipment (Shuttle Buggy) Asphalt; Pettibone-Rail
Equipment; Power Grader; Power Scraper; Push Cat; Rotomill
(all), Grinders & Planers of All types; Trench Machine (24" wide & under); & Vermeer type Concrete Saw
GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer; Bobcat-type and/or Skid
Steer Loader with or without Attachments; Highway Drills
(all types); Locomotive (narrow gauge); Material
Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power
Boiler (Over 15 lbs. Pressure) Pump Operator installing & operating Well Points; Pump (4" & over discharge); Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie
Tampers (without lifting & aligning device); Utility
Operator (Small equipment); & Welding Machines
GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh
Installing Machine; Batch Plant; Boring Machine Operator
(48" or less); Bull Floats; Burlap & Curing Machine;
Concrete Plant (capacity 4 yd. & under); Concrete Saw
(Multiple); Conveyor (Highway); Crusher; Deckhand;
Farm-type Tractor with attachments (highway) except
Masonry); Finishing Machine; Fireperson, Floating Equipment
(all types); Fork Lift (highway); Form Trencher; Hydro
Hammer; Hydro Seeder; Pavement Breaker; Plant Mixer; Post
Driver; Post Hole Digger (Power Auger); Power Brush Burner;
Power Form Handling Equipment; Road Widening Trencher;
Roller (Brick, Grade & Macadam); Self-Propelled Power
Spreader; Self-Propelled Power Subgrader; Steam Fireperson;
Tractor (Pulling Sheepfoot, Roller or Grader); & Vibratory
Compactor with Integral Power
GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum
Fireperson (Asphalt); Generator; Masonry Fork Lift;
Inboard-Outboard Motor Boat Launch; Masonry Fork Lift; Oil
Heater (asphalt plant); Oiler; Power Driven Heater; Power
Sweeper & Scrubber; Pump (under 4" discharge);
Signalperson; Tire Repairperson; & VAC/ALLS
GROUP 6 - Master Mechanic & Boom from 150 to 180
GROUP 7 - Boom from 180 and over
ENGI0018-004 05/01/2008
ADAMS, ALLEN, ASHLAND, ATHENS, AUGLAIZE, BELMONT, BROWN,
BUTLER, CARROLL, CHAMPAIGN, CLARK, CLERMONT, CLINTON,
COSHOCTON, CRAWFORD, DARKE, DEFIANCE, DELAWARE, FAIRFIELD,
FAYETTE, FRANKLIN, FULTON, GALLIA, GREENE, GUERNSEY, HAMILTON,
HANCOCK, HARDIN, HARRISON, HENRY, HIGHLAND, HOCKING, HOLMES,
HURON, JACKSON, JEFFERSON, KNOX, LAWRENCE, LICKING, LOGAN,
LUCAS, MADISON, MARION, MEIGS, MERCER, MIAMI, MONROE,
MONTGOMERY, MORGAN, MORROW, MUSKINGUM, NOBLE, OTTAWA, PAULDING,
PERRY, PICKAWAY, PIKE, PREBLE, PUTNAM, RICHLAND, ROSS,
SANDUSKY, SCIOTO, SENECA, SHELBY, STARK, TUSCARAWAS, UNION, VAN
WERT, VINTON, WARREN, WASHINGTON, WAYNE, WILLIAMS, WOOD &
WYANDOT
GROUP 1.....................$ 28.54 10.81
GROUP 2.....................$ 28.42 10.81
GROUP 3.....................$ 27.38 10.81
GROUP 4.....................$ 26.20 10.81
GROUP 5.....................$ 20.74 10.81
GROUP 6.....................$ 28.79 10.81
GROUP 7.....................$ 29.04 10.81
OPERATING ENGINEER CLASSIFICATIONS
GROUP 1 - Air Compressor on Steel Erection; Barrier Moving
Machine; Boiler Operator on Compressor or Generator when mounted on a Rig; Cableway; Combination Concrete Mixer &
Tower; Concrete Plant (over 4 yd. Capacity); Concrete Pump;
Crane (All Types, Including Boom Truck, Cherry Picker);
Crane-Compact, Track or Rubber over 4,000 lbs. capacity;
Cranes-Self Erecting, Stationary, Track or Truck (All
Configurations); Derrick; Dragline; Dredge (Dipper, Clam or
Suction); Elevating Grader or Euclid Loader; Floating
Equipment (All Types); Gradall; Helicopter Crew
(Operator-Hoist or Winch); Hoe (all types); Hoisting Engine on Shaft or Tunnel Work; Horizontal Directional Drill (over
500,000 ft. lbs. thrust); Hydraulic Gantry (Lifting
System); Industrial-Type Tractor; Jet Engine Dryer (D8 or
D9) Diesel Tractor; Locomotive (Standard Gauge);
Maintenance Operator Class A; Mixer, Paving (Single or
Double Drum); Mucking Machine; Multiple Scraper;
Piledriving Machine (All Types); Power Shovel; Prentice
Loader; Quad 9 (Double Pusher); Rail Tamper (with auto lifting & aligning device); Refrigerating Machine (Freezer
Operation); Rotary Drill, on Caisson work; Rough Terrain
Fork Lift with Winch/Hoist; Side-Boom; Slip-Form Paver;
Tower Derrick; Tree Shredder; Trench Machine (Over 24" wide); Truck Mounted Concrete Pump; Tug Boat; Tunnel
Machine and/or Mining Machine; & Wheel Excavator
GROUP 2 - Asphalt Paver; Automatic Subgrader Machine, Self-Propelled (CMI Type); Bobcat Type and/or Skid Steer
Loader with Hoe Attachment Greater than 7,000 lbs.; Boring
Machine More than 48"; Bulldozer; Endloader; Hydro Milling
Machine; Kolman-type Loader (production type-Dirt); Lead
Greaseman; Lighting & Traffic Signal Installation Equipment
(includes all groups or classifications); Material Transfer
Equipment (Shuttle Buggy) Asphalt; Pettibone-Rail
Equipment; Power Grader; Power Scraper; Push Cat; Rotomill
(all), Grinders & Planers of All types; Trench Machine (24" wide & under); & Vermeer type Concrete Saw
GROUP 3 - A-Frame; Air Compressor on Tunnel Work (low pressure); Asphalt Plant Engineer; Bobcat-type and/or Skid
Steer Loader with or without Attachments; Highway Drills
(all types); Locomotive (narrow gauge); Material
Hoist/Elevator; Mixer, Concrete (more than one bag capacity); Mixer, one bag capacity (Side Loader); Power
Boiler (Over 15 lbs. Pressure) Pump Operator installing & operating Well Points; Pump (4" & over discharge); Roller, Asphalt; Rotovator (lime soil stabilizer); Switch & Tie
Tampers (without lifting & aligning device); Utility
Operator (Small equipment); & Welding Machines
GROUP 4 - Backfiller; Ballast Re-locator; Bars, Joint & Mesh
Installing Machine; Batch Plant; Boring Machine Operator
(48" or less); Bull Floats; Burlap & Curing Machine;
Concrete Plant (capacity 4 yd. & under); Concrete Saw
(Multiple); Conveyor (Highway); Crusher; Deckhand;
Farm-type Tractor with attachments (highway) except
Masonry); Finishing Machine; Fireperson, Floating Equipment
(all types); Fork Lift (highway); Form Trencher; Hydro
Hammer; Hydro Seeder; Pavement Breaker; Plant Mixer; Post
Driver; Post Hole Digger (Power Auger); Power Brush Burner;
Power Form Handling Equipment; Road Widening Trencher;
Roller (Brick, Grade & Macadam); Self-Propelled Power
Spreader; Self-Propelled Power Subgrader; Steam Fireperson;
Tractor (Pulling Sheepfoot, Roller or Grader); & Vibratory
Compactor with Integral Power
GROUP 5 - Compressor (Portable, Sewer, Heavy & Highway); Drum
Fireperson (Asphalt); Generator; Masonry Fork Lift;
Inboard-Outboard Motor Boat Launch; Masonry Fork Lift; Oil
Heater (asphalt plant); Oiler; Power Driven Heater; Power
Sweeper & Scrubber; Pump (under 4" discharge);
Signalperson; Tire Repairperson; & VAC/ALLS
GROUP 6 - Master Mechanic & Boom from 150 to 180
GROUP 7 - Boom from 180 and over
ENGI0066-023 06/01/2008
COLUMBIANA, MAHONING & TRUMBULL COUNTIES
ASBESTOS; HAZARDOUS/TOXIC
WASTE PROJECTS
GROUP 1 - A & B.............$ 34.11 13.66
GROUP 2 - A & B.............$ 33.86 13.66
GROUP 3 - A & B.............$ 30.92 13.66
GROUP 4 - A & B.............$ 27.43 13.66
GROUP 5 - A & B.............$ 24.12 13.66
HAZARDOUS/TOXIC WASTE
PROJECTS
GROUP 1 - C & D.............$ 31.30 13.66
GROUP 2 - C & D.............$ 31.09 13.66
GROUP 3 - C & D.............$ 28.35 13.66
GROUP 4 - C & D.............$ 25.15 13.66
GROUP 5 - C & D.............$ 22.11 13.66
ALL OTHER WORK
GROUP 1.....................$ 28.49 13.66
GROUP 2.....................$ 28.22 13.66
GROUP 3.....................$ 25.77 13.66
GROUP 4.....................$ 22.86 13.66
GROUP 5.....................$ 20.10 13.66
GROUP 1 - Rig, Pile Driver or Caisson Type; & Rig, Pile
Hydraulic Unit Attached
GROUP 2 - Asphalt Heater Planer; Backfiller with Drag
Attachment; Backhoe; Backhoe with
Shear attached; Backhoe-Rear Pivotal Swing; Batch
Plant-Central Mix Concrete; Batch Plant, Portable concrete; Berm Builder-Automatic; Boat Derrick; Boat-Tug;
Boring Machine Attached to Tractor; Bullclam; Bulldozer;
C.M.I. Road Builder & Similar Type; Cable Placer & Layer;
Carrier-Straddle; Carryall-Scraper or Scoop; Chicago Boom;
Compactor with Blade Attached; Concrete Saw (Vermeer or similar type); Concrete Spreader Finisher; Combination, Bidwell Machine; Crane; Crane-Electric Overhead;
Crane-Rough Terrain; Crane-Side Boom; Crane-Truck;
Crane-Tower; Derrick-Boom; Derrick-Car; Digger-Wheel (Not trencher or road widener); Double Nine; Drag Line; Dredge;
Drill-Kenny or Similar Type; Easy Pour Median Barrier
Machine (or similar type); Electromatic; Frankie Pile;
Gradall; Grader; Gurry; Self-Propelled; Heavy Equipment
Robotics Operator/Mechanic; Hoist-Monorail;
Hoist-Stationary & Mobile Tractor; Hoist, 2 or 3 drum;
Horizontal Directional Drill Operator; Jackall; Jumbo
Machine; Kocal & Kuhlman; Land-Seagoing Vehicle; Loader, Elevating; Loader, Front End; Loader, Skid Steer;
Locomotive; Mechanic/Welder; Metro Chip Harvester with
Boom; Mucking Machine; Paver-Asphalt Finishing Machine;
Paver-Road Concrete; Paver-Slip Form (C.M.I. or similar);
Place Crete Machine with Boom; Post Driver (Carrier mounted); Power Driven Hydraulic Pump & Jack (When used in
Slip Form or Lift Slab Construction); Pump Crete Machine;
Regulator-Ballast; Hydraulic Power Unit not attached to Rig for Pile Drillings; Rigs-Drilling; Roto Mill or similar
Full Lane (8' Wide & Over); Roto Mill or similar type
(Under 8'); Shovel; Slip Form Curb Machine; Speedwing;
Spikemaster; Stonecrusher; Tie Puller & Loader; Tie Tamper;
Tractor-Double Boom; Tractor with Attachments; Truck-Boom;
Truck-Tire; Trench Machine; Tunnel Machine (Mark 21 Java or similar); & Whirley (or similar type)
GROUP 3 - Asphalt Plant; Bending Machine (Pipeline or similar type); Boring machine, Motor Driven; Chip Harvester without Boom; Cleaning Machine, Pipeline Type; Coating
Machine, Pipeline Type; Compactor; Concrete Belt Placer;
Concrete Finisher; Concrete Planer or Asphalt; Concrete
Spreader; Elevator; Fork Lift (Home building only); Fork
Lift Walk Behind (Hoisting over 1 buck high); Form Line
Machine; Grease Truck operator; Grout Pump; Gunnite
Machine; Horizontal Directional Drill Locator; Single Drum
Hoist with or without Tower; Huck Bolting Machine;
Hydraulic Scaffold (Hoisting building materials); Paving
Breaker (Self-propelled or Ridden); Pipe Dream; Pot
Fireperson (Power Agitated); Refrigeration Plant; Road
Widener; Roller; Sasgen Derrick; Seeding Machine; Soil
Stabilizer (Pump type); Spray Cure Machine, Self-Propelled; Straw Blower Machine; Sub-Grader; Tube
Finisher or Broom C.M.I. or similar type; & Tugger Hoist
GROUP 4 - Air Curtain Destructor & Similar Type; Batch
Plant-Job Related; Boiler Operator; Compressor; Conveyor;
Curb Builder, self-propelled; Drill Wagon; Fork lift &
Lulls; Generator Set; Generator-Steam; Heater-Portable
Power; Hydraulic Manipulator Crane; Jack-Hydraulic Power driven; Jack-Hydraulic (Railroad); Ladavator; Minor Machine
Operator; Mixer-Concrete; Mulching Machine; Pin Puller;
Power Broom; Pulverizer; Pump; Road Finishing Machine (Pull
Type); Saw-Concrete-Self-Propelled (Highway Work); Signal
Person; Spray Cure Machine-Motor Powered; Stump Cutter;
Tractor; Trencher Form; Water Blaster; Steam Jenny;
Syphon; Vibrator-Gasoline; & Welding Machine
GROUP 5 - Brakeperson; Fireperson; & Oiler
IRON0017-002 08/01/2008
ASHTABULA (North of Route 6, starting at the Geauga County
Line, proceeding east to State Route 45), CUYAHOGA, ERIE
(Eastern 2/3), GEAUGA, HURON (East of a line drawn from the north border through Monroeville & Willard), LAKE, LORAIN, MEDINA (North of Old Rte. #224), PORTAGE (West of a line from
Middlefield to Shalersville to Deerfield) & SUMMIT (North of
Old Rte. #224, including city limits of Barberton)
IRONWORKER
Ornamental; Reinforcing &
Structural..................$ 28.35 17.83
IRON0044-002 06/01/2008
CLINTON (South of a line drawn from Blanchester to Lynchburg), HAMILTON, HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) & WARREN
(South of a line drawn from Blanchester through Morrow to the west county line)
Fence Erector...............$ 22.70 16.42
Ornamental; Structural......$ 25.22 16.42
IRON0055-003 07/01/2008
CRAWFORD (Area Between lines drawn from where Hwy #598 & #30 meet through N. Liberty to the northern border & from said Hwy junction point due west to the border), DEFIANCE (S. of a line drawn from where Rte. #66 meets the northern line through
Independence to the eastern county border), ERIE (Western 1/3), FULTON, HANCOCK, HARDIN (North of a line drawn from Maysville to a point 4 miles south of the northern line on the eastern line), HENRY, HURON (West of a line drawn from the northern border through Monroeville & Willard), LUCAS, OTTAWA, PUTNAM
(East of a line drawn from the northern border down through
Miller City to where #696 meets the southern border), SANDUSKY, SENECA, WILLIAMS (East of a line drawn from Pioneer through
Stryker to the southern border), WOOD & WYANDOT (North of Rte.
#30)
Fence Erector...............$ 19.75 14.45
Flat Road Mesh..............$ 20.75 14.45
Tunnels & Caissons Under
Pressure....................$ 28.50 14.45
All Other Work..............$ 28.00 14.45
IRON0147-002 06/01/2007
ALLEN (Northern half), DEFIANCE (Northern part, excluding south of a line drawn from where Rte. #66 meets the northern line through Independence to the eastern county border), MERCER
(Northern half), PAULDING, PUTNAM (Western part, excluding east of a line drawn from the northern border down through Miller
City to where #696 meets the southern border), VAN WERT &
WILLIAMS (Western part, excluding east of a line drawn from
Pioneer through Stryker to the southern border)
IRONWORKER.......................$ 23.02 15.67
IRON0172-002 06/01/2008
CHAMPAIGN (Eastern one-third), CLARK (Eastern one-fourth), COSHOCTON (West of a line beginning at the northwestern county line going through Walhonding & Tunnel Hill to the southern county line), CRAWFORD (South of Rte. #30), DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, HARDIN (Excluding a line drawn from Roundhead to Maysville), HIGHLAND (Eastern one-fifth), HOCKING, JACKSON (Northern half), KNOX, LICKING, LOGAN (Eastern one-third), MADISON, MARION, MORROW, MUSKINGUM (West of a line starting at Adams Mill going to Adamsville & going from
Adamsville through Blue Rock to the southern border), PERRY, PICKAWAY, PIKE (Northern half), ROSS, UNION, VINTON & WYANDOT
(South of Rte. #30)
IRONWORKER.......................$ 25.57 15.45
IRON0207-004 06/01/2008
ASHTABULA (Southern part starting at the Geauga County line), COLUMBIANA (E. of a line from Damascus to Highlandtown), MAHONING (N. of Old Route #224), PORTAGE (E. of a line from
Middlefield to Shalersville to Deerfield) & TRUMBULL
Layout; Sheeter.............$ 27.31 16.03
Ornamental; Reinforcing;
Structural..................$ 26.31 16.03
IRON0290-002 06/01/2007
ALLEN (Southern half), AUGLAIZE, BUTLER (North of a line drawn from east to the west county line going through Oxford, Darrtown & Woodsdale), CHAMPAIGN (Excluding east of a line drawn from Catawla to the point where #68 intersects the northern county line), CLARK (Western two-thirds), CLINTON
(Excluding south of a line drawn from Blanchester to
Lynchburg), DARKE, GREENE, HIGHLAND (Inside lines drawn from
Marshall to Lynchburg & from the northern county line through
East Monroe to Marshall), LOGAN (West of a line drawn from
West Liberty to where the northern county line meets the western county line of Hardin), MERCER (Southern half), MIAMI, MONTGOMERY, PREBLE, SHELBY & WARREN (Excluding south of a line drawn from Blanchester through Morrow to the western county line)
Beyond 25 mile radius of
L.U. #290 Office, Dayton....$ 24.43 15.85
Within 25 mile radius of
L.U. #290 Office, Dayton....$ 24.28 15.85
IRON0348-005 08/01/2003
ASHTABULA (Eastern part from Lake Erie on the north to route
#322 on the south to include Conneaut, Kingsville, Sheffield, Denmark, Dorset, Cherry Valley, Wayne, Monroe, Pierpont, Richmond, Andover & Williamsfield Townships)
Structural, excluding metal building erection &
Reinforcing.................$ 22.17 13.35
IRON0372-002 06/01/2007
ADAMS (Western Part), BROWN, BUTLER (Southern Part), CLERMONT, CLINTON (South of a line drawn from Blanchester to Lynchburg), HAMILTON, HIGHLAND (Excluding eastern one-fifth & portion of county inside lines drawn from Marshall to Lynchburg from the northern county line through E. Monroe to Marshall) &
WARREN(South of a line drawn from Blanchester through Morrow to the west county line)
IRONWORKER, REINFORCING
Beyond 30-mile radius of
Hamilton County Courthouse..$ 25.40 14.85
Up to & including 30-mile radius of Hamilton County
Courthouse..................$ 25.15 14.85
IRON0549-003 07/01/2003
BELMONT, GUERNSEY, HARRISON, JEFFERSON, MONROE & MUSKINGUM
(Excluding portion west of a line starting at Adams Mill going to Adamsville and going from Adamsville through Blue Rock to the south border)
IRONWORKER.......................$ 25.82 12.64
IRON0550-004 05/01/2008
ASHLAND, CARROLL, COLUMBIANA (W. of a line from Damascus to
Highlandtown), COSHOCTON (E. of a line beginning at NW Co. line going through Walhonding & Tunnel Hill to the South Co. line), HOLMES, HURON (S. of Old Rte. #224), MAHONING (S. of Old Rte.
#224), MEDINA (S. of Old Rte. #224), PORTAGE (S. of Old Rte.
#224), RICHLAND, STARK, SUMMIT (S. of Old Rte. #224, Excluding city limits of Barberton), TUSCARAWAS, & WAYNE
Ironworkers:Structural, Ornamental and Reinforcing.......$ 23.88 16.07
IRON0769-004 06/01/2008
ADAMS (Eastern Half), GALLIA, JACKSON (Southern Half), LAWRENCE
& SCIOTO
ZONE 1......................$ 27.12 17.07
ZONE 2......................$ 27.52 17.07
ZONE 3......................$ 29.12 17.07
ZONE 1 - Up to 10 mile radius of Union Hall, Ashland, Ky., 1643 Greenup Ave.
ZONE 2 - 10 to 50 mile radius of Union Hall, Ashland, Ky., ZONE 3 - 50 mile radius & over of Union Hall, Ashland, Ky., IRON0787-003 01/01/2008
ATHENS, MEIGS, MORGAN, NOBLE & WASHINGTON
IRONWORKER.......................$ 26.27 15.60
LABO0265-008 05/01/2008
LABORER
ASHTABULA, ERIE, HURON,
LORAIN, LUCAS, MAHONING,
MEDINA, OTTAWA, PORTAGE,
SANDUSKY, STARK, SUMMIT,
TRUMBULL & WOOD COUNTIES
GROUP 1....................$ 25.55 6.70
GROUP 2....................$ 25.72 6.70
GROUP 3....................$ 26.05 6.70
GROUP 4....................$ 26.50 6.70
CUYAHOGA AND GEAUGA
COUNTIES ONLY: SEWAGE
PLANTS, WASTE PLANTS,
WATER TREATMENT
FACILITIES, PUMPING
STATIONS, & ETHANOL PLANTS
CONSTRUCTION................$ 28.16 6.70
CUYAHOGA, GEAUGA & LAKE
COUNTIES
GROUP 1....................$ 26.78 6.70
GROUP 2....................$ 26.95 6.70
GROUP 3....................$ 27.28 6.70
GROUP 4....................$ 27.73 6.70
REMAINING COUNTIES OF OHIO
GROUP 1....................$ 25.12 6.70
GROUP 2....................$ 25.29 6.70
GROUP 3....................$ 25.62 6.70
GROUP 4....................$ 26.07 6.70
LABORER CLASSIFICATIONS
GROUP 1 - Asphalt Laborer; Carpenter Tender; Concrete Curing
Applicator; Dump Man (Batch Truck); Guardrail and Fence
Installer; Joint Setter; Laborer (Construction); Landscape
Laborer; Highway Lighting Worker; Signalization Worker;
Mesh Handlers & Placer; Right-of-way Laborer; Riprap
Laborer & Grouter; Scaffold Erector; Seal Coating; Surface
Treatment or Road Mix Laborer; Sign Installer; Slurry Seal;
Utility Man; Bridge Man; Handyman; Waterproofing Laborer;
Flagperson; Hazardous Waste (level D); Diver Tender; Zone
Person & Traffic Control
GROUP 2 - Skid Steer; Asphalt Raker; Concrete Puddler; Kettle
Man Pipeline); Machine Driven Tools (Gas, Electric, Air);
Mason Tender; Brick Paver; Mortar Mixer; Power Buggy or
Power Wheelbarrow; Sheeting & Shoring Man; Surface Grinder
Man; Plastic Fusing Machine Operator; Pug Mill Operator; &
Vacuum Devices (wet or dry); Rodding Machine Operator;
Diver; Screwman or Paver; Screed Person; Water Blast, Hand
Held Wand; Pumps 4" & Under (Gas, Air or Electric) &
Hazardous Waste (level C); Air Track and Wagon Drill;
Bottom Person; Cofferdam (below 25 ft. deep); Concrete Saw
Person; Cutting with Burning Torch; Form Setter; Hand
Spiker (Railroad); Pipelayer; Tunnel Laborer (without air)
& Caisson; Underground Person (working in Sewer and
Waterline, Cleaning, Repairing & Reconditioning);
Sandblaster Nozzle Person; & Hazardous Waste (level B)
GROUP 3 - Blaster; Mucker; Powder Person; Top Lander;
Wrencher (Mechanical Joints & Utility Pipeline); Yarner;
Hazardous Waste (level A); Concrete Specialist; Concrete
Crew in Tunnels (With Air-pressurized - $1.00 premium);
Curb Setter & Cutter; Grade Checker; Utility Pipeline
Tapper; Waterline; and Caulker
GROUP 4 - Miner (With Air-pressurized - $1.00 premium); &
Gunite Nozzle Person
TUNNEL LABORER WITH AIR-PRESSURIZED ADD $1.00 TO BASE RATE
SIGNAL PERSON WILL RECEIVE THE RATE EQUAL TO THE RATE PAID
THE LABORER CLASSIFICATION FOR WHICH HE OR SHE IS SIGNALING.
PAIN0006-002 05/01/2008
ASHTABULA, CUYAHOGA, GEAUGA, LAKE, LORAIN, PORTAGE (N. of the
East-West Turnpike) & SUMMIT (N. of the East-West Turnpike)
PAINTER
COMMERCIAL NEW WORK;
REMODELING; & RENOVATIONS
GROUP 1....................$ 26.59 10.17
GROUP 2....................$ 26.99 10.17
GROUP 3....................$ 27.29 10.17
GROUP 4....................$ 28.29 10.17
COMMERCIAL REPAINT
GROUP 1....................$ 25.09 10.17
GROUP 2....................$ 25.49 10.17
GROUP 3....................$ 25.79 10.17
PAINTER CLASSIFICATIONS - COMMERCIAL NEW WORK; REMODELING; &
RENOVATIONS
GROUP 1 - Brush; & Roller
GROUP 2 - Sandblasting & Buffing
GROUP 3 - Spray Painting; Closed Steel Above 55 feet; Bridges
& Open Structural Steel; Tanks - Water Towers; Bridge
Painters; Bridge Riggers; Containment Builders
GROUP 4 - Bridge Blaster
PAINTER CLASSIFICATIONS - COMMERCIAL REPAINT
GROUP 1 - Brush; & Roller
GROUP 2 - Sandblasting & Buffing
GROUP 3 - Spray Painting
PAIN0006-014 07/01/2007
FULTON, HENRY, LUCAS, OTTAWA (Excluding Allen, Bay, Bono, Catawba Island, Clay Center, Curtice, Danbury, Eagle Beach, Elliston, Elmore, Erie, Fishback, Gem Beach & Genova) & WOOD
NEW COMMERCIAL WORK
GROUP 1....................$ 24.76 10.69
GROUP 2....................$ 25.01 10.69
GROUP 3....................$ 25.26 10.69
GROUP 4....................$ 25.51 10.69
GROUP 5....................$ 25.46 10.69
GROUP 6....................$ 25.76 10.69
GROUP 7....................$ 26.06 10.69
REPAINT IS 90% OF JR
PAINTER CLASSIFICATIONS
GROUP 1 - Brush, Spray & Sandblasting Pot Tender
GROUP 2 - Refinery & Refinery Tanks; Surfaces 30 ft. or over where material is applied to or labor performed on above ground level (exterior), floor level (interior)
GROUP 3 - Swing Stage & Chair
GROUP 4 - Solvent-Based Catalized Epoxy Materials of 2 or
More Component Materials, to include Solvent-Based
Conversion Varnish
GROUP 5 - All Methods of Spray, Paint or Any Material applied with a Pressure Device
GROUP 6 - Solvent Based Material; Sand and Abrasive Blasting
GROUP 7 - Television & Radio Tower, Bridge, Horizontal Cable
& Tank/Stack/Water Tank over 30 ft. (all include
Scaffolding-Brush)
PAIN0006-021 07/01/2007
ALLEN, AUGLAIZE, CHAMPAIGN, DEFIANCE, HARDIN, LOGAN, MERCER,
PAULDING, PUTNAM, SHELBY, VAN WERT & WILLIAMS
Brush & Roller..............$ 22.60 8.20
Drywall Finishing & Taping..$ 21.50 8.20
Lead Abatement..............$ 24.35 8.20
Spray, Sandblasting, Pressure Cleaning &
Refinery....................$ 23.35 8.20
Swing Stage, Chair, Spiders & Cherry Pickers....$ 22.85 8.20
Wallcoverings...............$ 21.30 8.20
All surfaces 40 ft. or over where material is applied to or labor performed on, above ground level (exterior), floor level (interior) - $.50 premium
Applying Coal Tar Products - $1.00 premium
PAIN0012-008 06/14/2008
BUTLER
GROUP 1.....................$ 20.49 6.83
GROUP 2.....................$ 23.10 6.83
GROUP 3.....................$ 23.60 6.83
GROUP 4.....................$ 23.85 6.83
GROUP 5.....................$ 24.10 6.83
GROUP 1: Bridge Equipment Tender; Bridge/Containment Builder
GROUP 2: Brush & Roller
GROUP 3: Spray
GROUP 4: Sandblasting; & Waterblasting
GROUP 5: Elevated Tanks; Steeplejack Work; Bridge; & Lead
Abatement
PAIN0012-010 06/14/2008
BROWN, CLERMONT, CLINTON, HAMILTON & WARREN
HEAVY & HIGHWAY BRIDGES-
GUARDRAILS-LIGHTPOLES-
STRIPING
Bridge Equipment Tender and Containment Builder....$ 20.49 6.83
Bridges when highest point of clearance is 60 feet or more; & Lead
Abatement Projects.........$ 24.10 6.83
Brush & Roller.............$ 23.10 6.83
Sandblasting & Hopper
Tender; Water Blasting.....$ 23.85 6.83
Spray......................$ 23.60 6.83
PAIN0012-014 05/01/2007
DELAWARE, FAIRFIELD, FAYETTE, FRANKLIN, MADISON, PICKAWAY, ROSS
& UNION
Bridges.....................$ 32.25 8.27
Brush; Roller...............$ 22.77 8.27
Sandblasting;
Steamcleaning;
Waterblasting (3500 PSI or
Over)& Hazardous Work.......$ 23.47 8.27
Spray.......................$ 23.27 8.27
Stacks; Tanks; & Towers.....$ 26.28 8.27
Structural Steel & Swing
Stage.......................$ 23.07 8.27
PAIN0093-001 12/01/2007
ATHENS, GUERNSEY, HOCKING, MONROE, MORGAN, NOBLE & WASHINGTON
Base Rate; Power
Generating Facilities.......$ 24.27 9.95
Bridges; Locks; Dams; High
Tension Towers; Energized
Substations.................$ 27.17 9.95
PAIN0249-002 05/01/2008
CLARK, DARKE, GREENE, MIAMI, MONTGOMERY & PREBLE
GROUP 1 - Brush & Roller....$ 22.29 7.48
GROUP 2 - Swing, Scaffold
Bridges; Structural Steel;
Open Acid Tank; High
Tension Electrical
Equipment; & Hot Pipes......$ 22.70 7.48
GROUP 3 - Spray;
Sandblast; Steamclean;
Lead Abatement..............$ 23.04 7.48
GROUP 4 - Steeplejack Work..$ 23.24 7.48
GROUP 5 - Coal Tar..........$ 23.79 7.48
GROUP 6 - Bridge Equipment
Tender & or Containment
Builder.....................$ 25.88 7.48
GROUP 7 - Tanks, Stacks &
Towers......................$ 26.28 7.48
GROUP 8 - Bridge Blaster, Rigger......................$ 32.25 7.48
PAIN0356-002 07/01/2007
KNOX, LICKING, MUSKINGUM & PERRY
Bridge Equipment Tenders &
Containment Builders........$ 26.69 6.95
Bridges; Blasters & Riggers.$ 33.36 6.95
Brush & Roller..............$ 19.66 6.95
Sandblasting; Steam
Cleaning; Waterblasting &
Hazardous Work..............$ 24.58 6.95
Spray.......................$ 20.16 6.95
Structural Steel & Swing
Stage.......................$ 24.18 6.95
Tanks; Stacks & Towers......$ 27.39 6.95
PAIN0406-002 06/01/2007
ASHLAND, CRAWFORD, MARION, MORROW & RICHLAND
PAINTER..........................$ 22.82 8.30
PAIN0438-002 12/01/2007
BELMONT, HARRISON & JEFFERSON
Base Rate; Power
Generating Facilities.......$ 24.10 9.95
Bridges; Locks; Dams; High
Tension Towers; Energized
Substations.................$ 27.00 9.95
PAIN0476-001 06/01/2008
COLUMBIANA, MAHONING & TRUMBULL
GROUP 1.....................$ 22.95 9.40
GROUP 2.....................$ 23.15 9.40
GROUP 3.....................$ 23.16 9.40
GROUP 4.....................$ 23.45 9.40
GROUP 5.....................$ 23.60 9.40
GROUP 6.....................$ 23.85 9.40
GROUP 7.....................$ 24.03 9.40
GROUP 1: Brush & Roller
GROUP 2: Bridges
GROUP 3: Structural Steel
GROUP 4: Spray, Except Bar Joist/Deck
GROUP 5: Epoxy/Mastic; Spray- Bar Joist/Deck; Working Above
50 Feet; Swingstages
GROUP 6: Tanks; Sandblasting
GROUP 7: Towers; Stacks
* PAIN0555-002 06/01/2008
ADAMS, HIGHLAND, JACKSON, PIKE & SCIOTO
GROUP 1.....................$ 24.48 11.47
GROUP 2.....................$ 25.57 11.47
GROUP 3.....................$ 26.67 11.47
GROUP 4.....................$ 28.83 11.47
GROUP 1 - Containment Builder
GROUP 2 - Brush; Roller; Power Tools, Under 40 feet
GROUP 3 - Sand Blasting; Spray; Steam Cleaning; Pressure
Washing; Epoxy & Two Component Materials; Lead Abatement;
Hazardous Waste; Toxic Materials; Bulk & Storage Tanks of
25,000 Gallon Capacity or More; Elevated Tanks
GROUP 4 - Stacks; Bridges
PAIN0603-002 06/01/2007
CARROLL, COSHOCTON, HOLMES, STARK, TUSCARAWAS & WAYNE
Bridges; Towers, Poles &
Stacks; Sandblasting
Steel; Structural Steel &
Metalizing..................$ 20.71 8.60
Brush & Roller..............$ 20.00 8.60
Spray; Tank Interior &
Exterior....................$ 20.53 8.60
PAIN0639-001 05/01/2003
Sign Painter & Erector...........$ 17.57 4.55+a+b+c
FOOTNOTES: a. 7 Paid Holidays: New Year's Day; Memorial Day;
July 4th; Labor Day; Thanksgiving Day; Christmas Day & 1
Floating Day
b. Vacation Pay: After 1 year's service - 5 days' paid vacation; After 2, but less than 10 years' service - 10 days' paid vacation; After 10, but less than 20 years' service - 15 days' paid vacation; After 20 years' service -
20 days' paid vacation
c. Funeral leave up to 3 days maximum paid leave for death of mother, father, brother, sister, spouse, child, mother-in-law, father-in-law, grandparent and inlaw provided employee attends funeral
PAIN0788-002 06/01/2007
ERIE, HANCOCK, HURON, OTTAWA (Allen, Bay, Bono, Catawba Island, Clay Center, Curtice, Danbury, Eagle Beach, Elliston, Elmore, Erie, Fishback, Gem Beach & Genoa), SANDUSKY, SENECA & WYANDOT
Brush & Roller..............$ 21.82 8.66
Structural Steel............$ 23.27 8.66
WINTER REPAINT: Between December 1 to March 31 - 90%JR
$.50 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE
CLASSIFICATION OF WORK:
While working swingstage, boatswain chair, needle beam and horizontal cable. While operating sprayguns, sandblasting, cobblasting and high pressure waterblasting (4000psi).
$1.00 PER HOUR SHALL BE ADDED TO THE RATE OF PAY FOR THE
CLASSIFICATION OF WORK:
For the application of catalized epoxy, including latex epoxy that is deemed hazardous, lead abatement, or for work or material where special precautions beyond normal work duties must be taken. For working on stacks, tanks, and towers over 40 feet in height.
PAIN0841-001 06/01/2007
MEDINA, PORTAGE (South of and including Ohio Turnpike), &
SUMMIT (South of and including Ohio Turnpike)
Painters:
GROUP 1.....................$ 23.05 8.98
GROUP 2.....................$ 23.70 8.98
GROUP 3.....................$ 23.80 8.