Amendment 0002.doc

DOC document 46 KB Posted

Attached to
WPAFB Construction - Replace Steam Lines, Project 04-0052
Solicitation number
FA8601-08-R-0034
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Wage Dec OH080002 Mod 8.pdf PDF
Amendment 0006.doc DOC document
Amendment 0005.doc DOC document
Amendment 0004.doc DOC document
Amendment 0003.doc DOC document
Addendum 2.doc DOC document
Site Visit Attendance.pdf PDF
Questions and Responses.pdf PDF
Conformed Solicitation.doc DOC document
Amendment 0001.doc DOC document
Wage Dec OH080002 Mod 7.pdf PDF
Addendum 1.doc DOC document
Solicitation.doc DOC document
Specs 04-0052.pdf PDF
Drawings 05-0013.pdf PDF
Specs 05-0013.pdf PDF
Wage Decision OH080029 4 Jul 08 Mod 6.docx DOCX document
Drawings 04-0052.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION H - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

PKC H-017

The contractor grants to the Government options to acquire the supplies described in Section B as “Option Items,” and identified as CLIN 0002 and CLIN 0003 FILLIN \* MERGEFORMAT at the price set forth in the schedule. The Government may exercise said options unilaterally by giving the contractor written notice. Period of performance (see Schedule F) for each option CLIN will be from the Notice to Proceed (NTP) issued after each unilateral modification.

(End of Clause)

SECTION I - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 days after the date the Contractor receives the notice to proceed (NTP) (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 135 calendar days. The time stated for completion shall include final cleanup of the premises.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $411.55.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c ) It has been determined that additional liquidated damages are appropriate, due to mission impact, over and above those required for normal construction and administration costs in the amount of $10,442.88 per day.

(1) Heating Load: 42Mbtu/Hr.

(2) fuel Cost: Gas or fuel oil cost at $10.36/Mbtu.

(3) Operating Cost: 42Mbtu/Hr x $10.36/Mbtu = $435.12/Hr = $10,442.88 day

(End of clause)

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

PROJECT 04-0052

Number Sheet Designation

Date G-1

Title Sheet & Site/Location Plans

6/08

G-2

General Notes

6/08

CME-1

Removal Plan & Profile

CME-2

Removal Plan & Profile

CME-3

Removal Plan & Profile; Option #1

6/08

CME-4

New Plan & Profile

CME-5

New Plan & Profile

CME-6

New Plan & Profile; Option #1

6/08

C-1

Concrete Shallow Trench/Manhole Details 6/08

C-2

Concrete Shallow Trench Details

6/08

M-1

Manhole S-222 Removals/New Work

6/08

M-2

Manhole S-223A Removals/New Work

6/08

M-3

Manhole S-223B/S-224 Removals/New Work 6/08

M-4

Manhole S-340/S-225 Removals

M-5

Manhole S-225A/S-225B Removals/New Work 6/08

M-6

Manhole S-226/S-227 Removals/New Work 6/08

M-7

Pump Pit S-298 Removals

M-8

Pump Pit S-298 New Work

M-9

Mechanical Details

M-10

Direct Buried Piping Details

M-11

Concrete Shallow Trench Details

6/08

M-12

Pump Pit S-298 Removals; Option #1

6/08

M-13

Pump Pit S-298 New Work; Option #1

6/08

M-14

Manhole S-299 Removals/New Work; Option 1 6/08

M-15

Manhole S-300 Removals/New Work; Option 1 6/08

E-1

Electric Circuit

(End of clause)

(End of Summary of Changes)