FA857117R00110007_(Modified_Copy).pdf

PDF 218 KB Posted

Attached to
WR-ALC EMXG Production Support
Solicitation number
FA8571-17-R-0011
Issued by

About this file

Amendment 0007

View the file

Other files

File Type Posted
FA857117R00110008_(Conformed_Copy).pdf PDF
FA857117R00110008_(Modified_Copy).pdf PDF
Revised_Production_Support_Yearly_Rates_Price_sheetxls.xls XLS spreadsheet
Revised_Copy_of_Qualifications_and_Requirements_for_each_postion.xlsx XLSX spreadsheet
SOW_EMXG_Production_Support_(Revision_8_FINAL).pdf PDF
FA857117R00110007_(Conformed_Copy).pdf PDF
Amendment_0006.pdf PDF
Questions_and_Answers__2.pdf PDF
FA857117R00110005(Modified_Copy).pdf PDF
FA857117R00110005_(Conformed_Copy).pdf PDF
Production_Support_Yearly_Rates_Price_sheetxls.xls XLS spreadsheet
Qualifications_and_Requirements_for_each_postion.xlsx XLSX spreadsheet
Production_Support_Yearly_Rates_Price_sheetxls.xls XLS spreadsheet
SOW_EMXG_Production_Support_(Revision_8_FINAL).pdf PDF
Questions-Answers.pdf PDF
General_Schedule_Pay_Scale.pdf PDF
FA857117R00110004(Conformed_Copy).pdf PDF
FA857117R00110004(Modified_Copy).pdf PDF
FA8571-17-R-0011_Amendment_0003.pdf PDF
0002_Amendment.pdf PDF
FA8571-17-R-0011_Amendment_0001.pdf PDF
Wage_Determination.pdf PDF
Appendix_C__for_EMXG_Production_Support_(updated).pdf PDF
DD_Form_254_-_F3QCCL7033A101__Prduction_Support_EMXG.pdf PDF
CDRLs_A003_-Safety_&_Health_Report.pdf_-__-_01-31-2017.pdf PDF
Wage_Grade_Schedule.pdf PDF
EMXG_Production_Support_VGSA_5-11-2016.doc_-__-_02-08-2017.pdf PDF
FA8571-17-R-0011.pdf PDF
CDRLs_A002_-Funds_&_Man_Hour_Reporting.pdf_-__-_01-31-2017.pdf PDF
SOW_EMXG_Production_Support_(Rev_7)(FINAL).pdf PDF
Production_Support_Yearly_Rates_Price_sheetxls.xls XLS spreadsheet
CDRLs_A001_-_Status_Report.pdf_-__-_01-31-2017.pdf PDF
Production_Support_Yearly_Rates_Price_sheetxls.xls XLS spreadsheet
SOW_EMXG_Production_Support_(Rev_7)(FINAL).pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3QCCL7033A101

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Revise the Qualif ications and Requirements Spreadsheet for the positions listed in the SOW. As such, Section J, Attachment 6, dated 7 June 2017 is incorporated and replaces previous version, dated 1 May 2017.

2) Correct CLINs 0004; 0017-0021; 0023-0024; 0026; 0044-0045 to reflect the proper job series codes.

3) Correct CLIN descriptions 0001-0066; 0068-0070 to reflect correct SOW date of 28 April 2017.

4) Incorporate revised SOW, dated 28 April 2017 in Section J, w hich replaces previous SOW, dated 9 March 2017.

Changes are highlighted in yellow . The due date has been extended to 20 June 2017 at 4:00 PM EST.

All amendments and the conformed copy shall be submitted w ith the proposal.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 27

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jun-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA857117R0011

X 9B. DATED (SEE ITEM 11)

28-Mar-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jun-2017

CODE

AFSC/PZIMA - FA8571

375 PERRY ST BLDG 255

ROBINS AFB GA 31088

FA8571 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA857117R0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 13-Jun-2017 04:00 PM to 20-Jun-

2017 04:00 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

EMXG Avionics Technician Services WG-2610-11 in accordance with section 1.2 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily operations.

To:

EMXG Avionics Technician Services WG-2610-11 in accordance with section 1.2 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0002

EMXG Senior Avionics Technician Services WG-2604-12 in accordance with section 1.1.2 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily operations.

EMXG Senior Avionics Technician Services WG-2604-12 in accordance with section 1.1.2 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0003

Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0004

EMXG Mechanical Engineering (Utility Infrastructure) services GS-0801-11 in accordance with section 1.3.4 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily operations.

EMXG Mechanical Engineering (Utility Infrastructure) services GS-0830-11 in accordance with section 1.3.4 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily operations.

CLIN 0005

EMXG Senior Mechanical Engineering Services (Hardware Design) GS-0830-12 in accordance with section 1.3.5 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior Mechanical Engineering Services (Hardware Design) GS-0830-12 in accordance with section 1.3.5 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to

CLIN 0006

EMXG Mechanical Engineering Services (Hardware Design) GS-0830-11 in accordance with section 1.3.6 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Mechanical Engineering Services (Hardware Design) GS-0830-11 in accordance with section 1.3.6 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0007

EMXG Senior Electrical Engineering Services GS-0850-12 in accordance with section 1.3.7 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Senior Electrical Engineering Services GS-0850-12 in accordance with section 1.3.7 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0008

EMXG Electrical Engineering Services GS-0850-12 in accordance with section 1.3.8 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Electrical Engineering Services GS-0850-12 in accordance with section 1.3.8 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0009

EMXG Senior General Engineering Services GS-0801-12 in accordance with section 1.3.9 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Senior General Engineering Services GS-0801-12 in accordance with section 1.3.9 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0010

EMXG Senior Reverse Engineering Services GS-0855-12 in accordance with section 1.3.10 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Senior Reverse Engineering Services GS-0855-12 in accordance with section 1.3.10 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0011

EMXG Senior Test Engineering Services GS-0855-12 in accordance with section 1.3.11 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Senior Test Engineering Services GS-0855-12 in accordance with section 1.3.11 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0012

EMXG Senior Design Engineering Services GS-0855-12 in accordance with section 1.3.12 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Senior Design Engineering Services GS-0855-12 in accordance with section 1.3.12 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0013

EMXG Senior Radio Frequency Engineering Services GS-0855-12 in accordance with section 1.3.13 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Senior Radio Frequency Engineering Services GS-0855-12 in accordance with section 1.3.13 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0014

EMXG Senior Materials Engineering Services GS-0806-12 in accordance with section 1.3.14 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Senior Materials Engineering Services GS-0806-12 in accordance with section 1.3.14 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0015

EMXG Senior Engineering Technical Services GS-0856-12 in accordance with section 1.3.15 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Senior Engineering Technical Services GS-0856-12 in accordance with section 1.3.15 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0016

EMXG Senior Engineering Technical Services GS-0856-12 in accordance with section 1.3.15 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Senior Engineering Technical Services GS-0856-12 in accordance with section 1.3.15 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0017

EMXG Senior General Engineering Technical Services GS-0801-12 in accordance with section 1.3.16 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior General Engineering Technical Services GS-0802-12 in accordance with section 1.3.16 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0018

EMXG Senior Test Electronics Engineering Technical Services GS-0855-12 in accordance with section 1.3.17 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior Test Electronics Engineering Technical Services GS-0856-12 in accordance with section 1.3.17 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to

CLIN 0019

EMXG Senior Radio Frequency Electronic Engineering Technical Services GS-0855-12 in accordance with section

1.3.18 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily operations.

EMXG Senior Radio Frequency Electronic Engineering Technical Services GS-0856-12 in accordance with section

1.3.18 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics

CLIN 0020

EMXG Senior Hybrid Electronic Engineering Technical Services GS-0855-12 in accordance with section 1.3.19 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior Hybrid Electronic Engineering Technical Services GS-0856-12 in accordance with section 1.3.19 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to

CLIN 0021

EMXG Senior Electrical Engineering Technical Services GS-0850-12 in accordance with section 1.3.20 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior Electrical Engineering Technical Services GS-0802-12 in accordance with section 1.3.20 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0022

EMXG Senior Engineering Technical Communication Services GS-0856-12 in accordance with section 1.3.21 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior Engineering Technical Communication Services GS-0856-12 in accordance with section 1.3.21 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to

CLIN 0023

EMXG Senior Mechanical Engineering Technical Services GS-0801-12 in accordance with section 1.3.22 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior Mechanical Engineering Technical Services GS-0802-12 in accordance with section 1.3.22 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0024

EMXG Senior Chemical Engineering Services GS-0893-12 in accordance with section 1.3.23 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Senior Chemical Engineering Services GS-1301-12 in accordance with section 1.3.23 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0025

The CLIN description has changed from Industrial Eng (IT2) to Industrial Eng Technician (IT2).

The CLIN extended description has changed from:

EMXG Industrial Engineering Services GS-0895-11 in accordance with section 1.3.2 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Industrial Engineering Technician Services GS-0895-11 in accordance with section 1.3.2 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0026

The CLIN description has changed from Sr. Level Ind Eng (IT3) to Sr. Level Ind Eng Tech (IT3).

The CLIN extended description has changed from:

EMXG Senior Level Industrial Engineering Services GS-0896-12 in accordance with section 1.3.1 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Senior Level Industrial Engineering Technician Services GS-0895-12 in accordance with section 1.3.1 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0027

EMXG Senior Industrial Engineering Technical Services GS-0895-12 in accordance with section 1.3.24 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior Industrial Engineering Technical Services GS-0895-12 in accordance with section 1.3.24 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0028

EMXG Equipment Custodian Services GS-2005-07 in accordance with section 1.10.1 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Equipment Custodian Services GS-2005-07 in accordance with section 1.10.1 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0029

EMXG Scheduler Services GS-1152-11 in accordance with section 1.10.2 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily operations.

EMXG Scheduler Services GS-1152-11 in accordance with section 1.10.2 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily

CLIN 0030

EMXG Tools/Parts Attendant Services WG-6904-06 in accordance with section 1.10.3 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Tools/Parts Attendant Services WG-6904-06 in accordance with section 1.10.3 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0031

EMXG Planner/Production Kitter Services GS-0895-11 in accordance with section 1.10.4 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Planner/Production Kitter Services GS-0895-11 in accordance with section 1.10.4 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0032

EMXG Supply Technician Services GS-2005-07 in accordance with section 1.10.5 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Supply Technician Services GS-2005-07 in accordance with section 1.10.5 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0033

EMXG Machinist Services GS-3414-11 in accordance with section 1.12.1 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily

EMXG Machinist Services GS-3414-11 in accordance with section 1.12.1 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily

CLIN 0034

EMXG Circuit Board Maker Services GS-3736-11 in accordance with section 1.13 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Circuit Board Maker Services GS-3736-11 in accordance with section 1.13 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0035

EMXG Painter Services WG-4102-09 in accordance with section 1.14 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily

EMXG Painter Services WG-4102-09 in accordance with section 1.14 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily

CLIN 0036

EMXG Welder Services WG-3703-11 in accordance with section 1.15 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily

EMXG Welder Services WG-3703-11 in accordance with section 1.15 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily

CLIN 0037

EMXG Equipment Cleaner Services WG-7009-05 in accordance with section 1.16 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Equipment Cleaner Services WG-7009-05 in accordance with section 1.16 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0038

EMXG Budget Analyst Services GS-0501-12 in accordance with section 1.4.1 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily operations.

EMXG Budget Analyst Services GS-0501-12 in accordance with section 1.4.1 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support

CLIN 0039

EMXG Senior Level Mechanical Engineering Services (Utility Infrastructure) GS-0801-12 in accordance with section 1.3.3 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics

EMXG Senior Level Mechanical Engineering Services (Utility Infrastructure) GS-0801-12 in accordance with section 1.3.3 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics

CLIN 0040

EMXG Senior Engineering Technical Services GS-0856-12 in accordance with section 1.3.15 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Senior Engineering Technical Services GS-0856-12 in accordance with section 1.3.15 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0041

EMXG Lean Facilitation Services GS-0301-12 in accordance with section 1.7 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support

EMXG Lean Facilitation Services GS-0301-12 in accordance with section 1.7 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support

CLIN 0042

EMXG Security Services GS-0085-07 in accordance with section 1.9 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily

EMXG Security Services GS-0085-07 in accordance with section 1.9 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily

CLIN 0043

EMXG Security Services GS-0085-07 in accordance with section 1.9 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily

EMXG Security Services GS-0085-07 in accordance with section 1.9 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support daily

CLIN 0044

EMXG Mechanical Engineering (Utility Infrastructure) services GS-0801-12 in accordance with section 1.3.4 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Mechanical Engineering (Utility Infrastructure) services GS-0830-11 in accordance with section 1.3.4 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0045

EMXG Senior Chemical Engineering Services GS-0893-12 in accordance with section 1.3.23 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Senior Chemical Engineering Services GS-1301-12 in accordance with section 1.3.23 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0046

The CLIN description has changed from Training Resource Mgmt. to Training Tech Resource Mgmt..

The CLIN extended description has changed from:

EMXG Training Resource Management Specialist Services GS-1702-11 in accordance with section 1.8.1 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Training Technician Resource Management Specialist Services GS-1702-11 in accordance with section

1.8.1 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics

CLIN 0047

EMXG Process Analyst Services GS-0301-11 in accordance with section 1.4.2 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support

EMXG Process Analyst Services GS-0301-11 in accordance with section 1.4.2 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to support

CLIN 0048

EMXG Management Analyst (PAC) Services GS-0343-11 in accordance with section 1.4.5 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Management Analyst (PAC) Services GS-0343-11 in accordance with section 1.4.5 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0049

The CLIN description has changed from Program Analyst (Security) to Management Analyst (Security).

The CLIN extended description has changed from:

EMXG Program Analyst (Security) Services GS-0343-11 in accordance with section 1.4.4 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Management Analyst (Security) Services GS-0343-11 in accordance with section 1.4.4 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0050

EMXG Management Analyst (Resource Advisor) Services GS-0343-11 in accordance with section 1.4.5 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Management Analyst (Resource Advisor) Services GS-0343-11 in accordance with section 1.4.5 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0051

EMXG Management Analyst (DREP) Services GS-0343-11 in accordance with section 1.4.6 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Management Analyst (DREP) Services GS-0343-11 in accordance with section 1.4.6 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0052

EMXG Production Operations Management Specialist Services GS-1101-11 in accordance with section 1.5 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Production Operations Management Specialist Services GS-1101-11 in accordance with section 1.5 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0053

EMXG Acquisition Support Specialist Services GS-1101-12 in accordance with section 1.6 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Acquisition Support Specialist Services GS-1101-12 in accordance with section 1.6 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0054

EMXG Production Maintenance Support Services GS-1101-07 in accordance with section 1.10 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Production Maintenance Support Services GS-1101-07 in accordance with section 1.10 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0055

EMXG Scheduler Assistant Services GS-0085-07 in accordance with section 1.9.1 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Scheduler Assistant Services GS-0085-07 in accordance with section 1.9.1 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0056

EMXG Environmental Protection Assistant Services GS-0029-07 in accordance with section 1.10.6 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Environmental Protection Assistant Services GS-0029-07 in accordance with section 1.10.6 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0057

EMXG Technical Writer/Editor (Electronics) Services GS-1083-12 in accordance with section 1.11 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Technical Writer/Editor (Electronics) Services GS-1083-12 in accordance with section 1.11 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0058

EMXG Program Support Assistant Services GS-0303-05 in accordance with section 1.8.3 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

EMXG Program Support Assistant Services GS-0303-05 in accordance with section 1.8.3 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in order to

CLIN 0059

EMXG Management and Program Analyst Services GS-0343-11 in accordance with section 1.8.2 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

EMXG Management and Program Analyst Services GS-0343-11 in accordance with section 1.8.2 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide labor in

CLIN 0060

EMXG Resource Management (Program Manager) Services GS-1101-12 in accordance with section 1.8 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Resource Management (Program Manager) Services GS-1101-12 in accordance with section 1.8 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0061

EMXG Mechanical Engineering Services (Hardware Design) GS-0830-11 in accordance with section 1.3.6 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Mechanical Engineering Services (Hardware Design) GS-0830-11 in accordance with section 1.3.6 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0062

EMXG Senior General Engineering Technical Services GS-0801-12 in accordance with section 1.3.16 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior General Engineering Technical Services GS-0801-12 in accordance with section 1.3.16 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0063

EMXG Senior Electrical Engineering Technical Services GS-0802-12 in accordance with section 1.3.20 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior Electrical Engineering Technical Services GS-0802-12 in accordance with section 1.3.20 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0064

EMXG Senior Mechanical Engineering Technical Services GS-0802-12 in accordance with section 1.3.22 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior Mechanical Engineering Technical Services GS-0802-12 in accordance with section 1.3.22 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0065

EMXG Senior General Engineering Technical Services GS-0801-12 in accordance with section 1.3.16 of the attached Statement of Work dated 09 March 2017 in support of the Warner Robins Air Logistics Complex to

EMXG Senior General Engineering Technical Services GS-0802-12 in accordance with section 1.3.16 of the attached Statement of Work dated 28 April 2017 in support of the Warner Robins Air Logistics Complex to provide

CLIN 0066

Overtime may be necessary to meet operational needs. The contractor must obtain full authorization from the Contracting Officer, prior to anyone working overtime. Under no circumstances shall the contractor’s employees exceed the extended hour allotment. If additional extended hours are required, the contractor or government organization shall request that the task be amended accordingly in accordance with 4.4 in the Statement of Work dated 09 March 2017.

Overtime may be necessary to meet operational needs. The contractor must obtain full authorization from the Contracting Officer, prior to anyone working overtime. Under no circumstances shall the contractor’s employees exceed the extended hour allotment. If additional extended hours are required, the contractor or government organization shall request that the task be amended accordingly in accordance with 4.4 in the Statement of Work dated 28 April 2017.

CLIN 0068

EMXG Travel will be in accordance with section 3.1.2 of the attached Statment of Work dated 09 March 2017.

EMXG Travel will be in accordance with section 3.1.2 of the attached Statment of Work dated 28 April 2017.

CLIN 0069

Transition period in accordance with 4.1 in the Statment of Work dated 09 March 2017.

Transition period in accordance with 4.1 in the Statment of Work dated 28 April 2017.

CLIN 0070

Transition period in accordance with 4.1.1 in the Statment of Work dated 09 March 2017.

Transition period in accordance with 4.1.1 in the Statment of Work dated 28 April 2017.

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CDRL A001 3 11-JAN-2017 Exhibit B CDRL A002 3 11-JAN-2017 Exhibit C CDRL A003 3 11-JAN-2017 Attachment 1 DD254 2 07-MAR-2017 Attachment 2 Wage Grade Schedule 1 21-AUG-2016 Attachment 3 Wage Determination 10 31-JAN-2017 Attachment 4 APPENDIX C 13 21-FEB-2017 Attachment 5 Visitor Group Security

Agreement (VGSA)

8 08-FEB-2017

Attachment 6 Qualifications and Requirements for each Position

1 01-MAY-2017

Attachment 7 Production Support Yearly Price Sheet

2 01-MAY-2017

Attachment 8 General Schedule Pay Scale

1 01-JAN-2017

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit A CDRL A001 3 11-JAN-2017 Exhibit B CDRL A002 3 11-JAN-2017 Exhibit C CDRL A003 3 11-JAN-2017 Attachment 1 DD254 2 07-MAR-2017 Attachment 2 Wage Grade Schedule 1 21-AUG-2016 Attachment 3 Wage Determination 10 31-JAN-2017 Attachment 4 APPENDIX C 13 21-FEB-2017 Attachment 5 Visitor Group Security

Agreement (VGSA)

8 08-FEB-2017

Attachment 6 Revised Qualifications and Requirements

1 07-JUN-2017

Attachment 7 Production Support Yearly Price Sheet

2 01-MAY-2017

Attachment 8 General Schedule Pay Scale

1 01-JAN-2017

Attachment 9 Statement of Work 24 28-APR-2017

The following have been modified:

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers: Total Evaluated Price, which will be computed IAW the attached Pricing Sheet

1. Proposal Evaluation. The evaluation process will be accomplished as follows.

A. Cost/Price Factor. Each offeror’s cost/price volume will be evaluated based on the following: The contract labor rates proposed by the Offeror will be evaluated for Reasonableness and Balance. A TEP will be calculated, based on all years’ labor rates. Information on each evaluation and how TEP will be calculated is detailed below.

• Reasonableness: The existence of adequate price competition is expected to support a determination of reasonableness. In addition, price analysis techniques may be used to further validate price reasonableness.

If adequate competition is not obtained or if price reasonableness cannot be determined using price analysis, other techniques described in FAR Subpart 15.4 will be used.

• Balanced Pricing: Offerors are cautioned against submitting an offer that contains unbalanced pricing as outlined in FAR 15.404-1(g). Unbalanced pricing exists when, despite an acceptable total evaluated price, one or more contract labor rates is significantly overstated or understated as indicated by the application of analysis techniques. Rates within each offeror’s response will be compared and evaluated to assure that a logical progression exists as related to rates proposed for each labor category and year proposed. Offers that are determined to be unbalanced may be rejected if the lack of balance poses an unacceptable risk to the Government.

• Total Evaluated Price: The TEP will be calculated based on multiplying the proposed labor category rate by the estimated hours for that category. The following is a summary of how the TEP will be calculated:

o CLINs 0001 – 0065 – Labor FFP – Offeror to propose fully burdened labor rates for each labor category (IAW the attached “Production Support Yearly Rates Price Sheet.xls”) by year to be multiplied by estimated hours.

o CLIN 0066 - Overtime – Offeror to propose rates in accordance with clause 52.222-4. “No Contractor or subcontractor employing laborers or mechanics (see Federal Acquisition Regulation 22.300) shall require or permit them to work over 40 hours in any workweek unless they are paid at least 1 and 1/2 times the basic rate of pay for each hour worked over 40 hours.”

o CLIN 0067 – Data is Not Separately Priced (NSP).

o CLIN 0068 – Travel will be Cost Reimbursable and not included in the TEP.

o CLIN 0069 – Contractor Site Start-up (Transition In).

o CLIN 0070 – Contractor Transition Out

B. The Government intends to award without discussions, but reserves the right to conduct discussions if determined necessary. Any discussions will be conducted in accordance with FAR 15.306. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

C. The total compensation plan and supporting information will be evaluated per FAR 52.222-46 to assure it reflects a sound management approach and understanding of the contract requirements. Failure by the offeror/populated joint venture/each joint venture partner in an unpopulated joint venture to submit this total compensation plan (salaries and fringe benefits) will result in the offeror being considered as failing to meet the RFP terms and conditions.

Proposed compensation plans will be evaluated by comparing each labor category’s proposed burdened salary to the government’s estimate. Any proposed labor categories reflecting a salary lower than the government’s estimate, as stated in the below table, will be determined unrealistically low and the corresponding price volume will not be evaluated for award. This table is applicable to the basic and option years.

CLIN Category GS Equiv Job Series‐Grade‐Step GS Hourly Rate 0001 Avionics Technician (AT2) – Day Shift WG‐2610‐11 $23.89 0002 Sr. Avionics Technician (AT3) – Day Shift WG‐2604‐12 $24.85 0003 Sr. Avionics Technician (AT3) – Swing Shift WG‐2604‐12 $24.85 0004 Mechanical Engineering (Utility) ‐ Day Shift GS‐0830‐11 $25.07 0005 Sr. Mechanical Eng. (Hardware) (E3) ‐ Day Shift GS‐0830‐12 $30.05 0006 Mechanical Eng. (Hardware) (E2) ‐ Day Shift GS‐0830‐11 $25.07 0007 Sr. Electrical Engineer (E3) ‐ Day Shift GS‐0850‐12 $30.05 0008 Electrical Engineer (E2) ‐ Day Shift GS‐0850‐12 $30.05 0009 Sr. General Engineering (E3) ‐ Day Shift GS‐0801‐12 $30.05 0010 Sr. Reverse Engineering (E3) ‐ Day Shift GS‐0855‐12 $30.05 0011 Sr. Test Engineering (E3) ‐ Day Shift GS‐0855‐12 $30.05 0012 Sr. Design Engineering (E3) ‐ Day Shift GS‐0855‐12 $30.05 0013 Sr. Radio Frequency Engineering (E3) ‐ Day Shift GS‐0855‐12 $30.05 0014 Sr. Materials Engineering (E3) ‐ Day Shift GS‐0806‐12 $30.05 0015 Sr. Engineering Technical (ET3) ‐ Day Shift GS‐0856‐12 $30.05 0016 Sr. Engineering Tech (ET3) ‐ Swing Shift GS‐0856‐12 $30.05 0017 Sr. General Eng. Tech. (ET3) ‐ Day Shift GS‐0802‐12 $30.05 0018 Sr. Test Electronics Eng. Tech. (ET3) ‐ Day Shift GS‐0856‐12 $30.05 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/22.htm#P137_21859

0019 Sr. Radio Freq. Electronics Eng. (ET3) ‐ Day Shift GS‐0856‐12 $30.05 0020 Sr. Hybrid Elec. Eng. Tech. (ET3) ‐ Day Shift GS‐0856‐12 $30.05 0021 Sr. Electrical Eng Tech. (ET3) ‐ Day Shift GS‐0802‐12 $30.05 0022 Sr. Eng Tech Comm (ET3) ‐ Day Shift GS‐0856‐12 $30.05 0023 Sr. Mech. Eng. Tech. (ET3) ‐ Day Shift GS‐0802‐12 $30.05 0024 Sr. Chemical Eng (ET3) ‐ Day Shift GS‐1301‐12 $30.05 0025 Industrial Eng Technician (IT2) ‐ Day Shift GS‐0895‐11 $25.07 0026 Sr. Level Ind Eng Tech (IT3) ‐ Day Shift GS‐0895‐12 $30.05 0027 Sr. Ind Eng Tech (IT3) ‐ Day Shift GS‐0895‐12 $30.05 0028 Equipment Custodian ‐ Day Shift GS‐2005‐07 $16.94 0029 Scheduler ‐ Day Shift GS‐1152‐11 $25.07 0030 Tools/Parts Attendant ‐ Day Shift WG‐6904‐06 $19.18 0031 Planner/Production Kitter ‐ Day Shift GS‐0895‐11 $25.07 0032 Supply Technician ‐ Day Shift GS‐2005‐07 $16.94 0033 Machinist ‐ Day Shift GS‐3414‐11 $25.07 0034 Circuit Board Maker ‐ Day Shift GS‐3736‐11 $25.07 0035 Painter ‐ Day Shift GS‐4102‐09 $20.72 0036 Welder ‐ Day Shift GS‐3703‐11 $25.07 0037 Equipment Cleaner ‐ Day Shift WG‐7009‐05 $18.11 0038 Budget Analyst (BA) ‐ Day Shift GS‐0501‐12 $30.05 0039 Sr. Level Mech Eng (E3) ‐ Day Shift GS‐0801‐12 $30.05 0040 Sr. Level Eng. Tech. (ET3) ‐ Day Shift GS‐0856‐12 $30.05 0041 Lean Facilitation Serv (LNF) ‐ Day Shift GS‐0301‐12 $30.05 0042 Security Services (SECA) ‐ Day Shift GS‐0085‐07 $16.94 0043 Security Services (SECA) ‐ Swing Shift GS‐0085‐07 $16.94 0044 Mechanical Eng. (Utility) (E2) ‐ Day Shift GS‐0830‐11 $25.07 0045 Sr. Chemical Engineer (ET3) ‐ Day Shift GS‐1301‐12 $30.05 0046 Training Technician Resource Mgmt. ‐ Day Shift GS‐1702‐11 $25.07 0047 Process Analyst ‐ Day Shift GS‐0301‐11 $25.07 0048 Management Analyst (PAC) ‐ Day Shift GS‐0343‐11 $25.07 0049 Management Analyst (Security) ‐ Day Shift GS‐0343‐11 $25.07 0050 Management Analyst (RA) ‐ Day Shift GS‐0343‐11 $25.07 0051 Mgmt. Analyst (DREP) ‐ Day Shift GS‐0343‐11 $25.07 0052 Production Op. Mgmt. Specialist ‐ Day Shift GS‐1101‐11 $25.07 0053 Acquisition Support Specialist ‐ Day Shift GS‐1101‐12 $30.05 0054 Prod. Maint. Support ‐ Day Shift GS‐1101‐07 $16.94 0055 Security Assistant ‐ Day Shift GS‐0085‐07 $16.94 0056 Envir. Protection Assistant ‐ Day Shift GS‐0029‐07 $16.94 0057 Technical Writer/Editor (Electronics) ‐ Day Shift GS‐1083‐12 $30.05 0058 Program Support Assistant ‐Day Shift GS‐0303‐05 $13.68 0059 Mgmt. and Program Analyst ‐ Day Shift GS‐0343‐11 $25.07 0060 Resource Management (Program Manager) ‐ Day

GS‐1101‐12 $30.05

0061 Mech. Eng. (Hardware) (E3) ‐ Day Shift GS‐0830‐11 $25.07 0062 Senior General Eng. (E3) ‐ Day Shift GS‐0801‐12 $30.05 0063 Sr. Electrical Eng. Tech. (ET3) ‐ Day Shift GS‐0802‐12 $30.05 0064 Sr. Mechanical Eng. Tech. (ET3) ‐ Day Shift GS‐0802‐12 $30.05 0065 Sr. General Eng. Tech. (ET3) ‐ Day Shift GS‐0802‐12 $30.05

Fringe benefits below 25% will be deemed unacceptable due to cost realism unless extenuating circumstances are provided by Contractor as part of the initial proposal.

(b) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(End of provision)

52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5332.

THIS STATEMENT IS FOR INFORMATION ONLY: IT IS NOT A WAGE DETERMINATION

Employee Class Monetary Wage-Fringe Benefits

See attached Wage Grade Schedule and General Schedule Pay Scale

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .