FA855218R0005-Draft.pdf

PDF 193 KB Posted

Attached to
HH-60G Degraded Visual Environment
Solicitation number
FA855218R0005
Issued by

About this file

RFP-Draft

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD FORM 1447 (2/2012)

Prescribed by GSA FAR (48 CFR) 53.215-1(d)

4. SOLICITATION NUMBER

FA8552-18-R-0005

X

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS CODE:

8(A) SIZE STANDARD:

DATE SIGNED

28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 180 days.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) ( ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *180

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8552

2. CONTRACT NO.

X

CHECK IF REMITTANCE IS DIFFERENT

AND PUT SUCH ADDRESS IN OFFER

17.

ITEM NO.

12. ADMINISTERED BY CODE

Estimated

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T

SCD:B

NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER

24. AWARD AMOUNT (FOR GOVT USE ONLY)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAY DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES

9.

Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.

30-JUL-2018 4:30PM

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

X

7. ISSUED BY CODE

SOF/PR - ROTARY WING & AVIONICS, AFLCMC/WIUKB

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7227

ROBINS AFB GA 31098-1670

BUYER: Leigh Ann Taylor/WIUKB leigh.taylor.3@us.af.mil Phone: (478) 926- 7441 No Collect Calls

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

JSU

SF 1447 (rev 2/2012) BACK

NO RESPONSE FOR THE REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

CANNOT COMPLY WITH SPECIFICATIONS

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

FOLD

FOLD

SOLICITATION NO. FA855218R0005

DUE: 30 JUL 2018 4:30 PM

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Leigh A Taylor/WIUKB

SOF/PR - ROTARY WING & AVIONICS, AFLCMC/WIUKB

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 7227

ROBINS AFB GA 31098-1670

FA8552-18-R-0005

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

BASIC CONTRACT PERIOD: The 24 month period effective from the date of contract award.

HH-60G Degraded Visual Environment Non-Recurring Engineering

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Non-Recurring Engineering IAW attached PWS Associated Document(s) Line Item(s)

FD20601930143 0001

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

1 LO *24 Months

Proposed Delivery

1 LO

HH-60G Degraded Visual Environment Prototype Installation Kit

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 KT

Prototype Installation Kit Associated Document(s) Line Item(s)

FD20601930143 0002

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

HH-60G Degraded Visual Environment Prototype Installation Kit

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

Buy American Act/Balance of Payments Program Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

A TBD 1 KT *18 Months

Proposed Delivery

A TBD 1 KT

HH-60G Degraded Visual Environment Verification Installation Kit

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 KT

Verification Installation Kit Associated Document(s) Line Item(s)

FD20601930143 0003

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

A TBD 1 KT *22 Months

Proposed Delivery

A TBD 1 KT

HH-60G Degraded Visual Environment Lab/Simulator Kits

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

6 KT

Lab/Simulator Kits

IAW PWS

Associated Document(s) Line Item(s)

FD20601930143 0004

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

+ F3QCBJ 6 KT *18 Months

Proposed Delivery

+ F3QCBJ 6 KT

HH-60G Degraded Visual Environment Prototype Installation Labor

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Prototype Installation Labor Associated Document(s) Line Item(s)

FD20601930143 0005

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

HH-60G Degraded Visual Environment Prototype Installation Labor

Buy American Act/Balance of Payments Program Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

A TBD 1 LO *18 Months

Proposed Delivery

A TBD 1 LO

HH-60G Degraded Visual Environment Verification Installation Labor

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

Verification Installation Labor Associated Document(s) Line Item(s)

FD20601930143 0006

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required Delivery

A TBD 1 LO *22 Months

Proposed Delivery

A TBD 1 LO

Data

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

Data

DATA IAW DD1423

Associated Document(s) Line Item(s)

Data

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Conference Agenda

Item No.

0007AA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A001-Conference Agenda

DI-ADMN-81249B

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) _ _ Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Conference Minutes

Item No.

0007AB

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A002-Conference Minutes

DI-ADMN-81250B

Associated Document(s) Line Item(s)

Conference Minutes

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

Item No.

0007AC

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A003-Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

DI-PSSS-81656B

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

+ IAW1423 1 LO

Scientific and Technical Reports

Item No.

0007AD

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A004-Scientific and Technical Reports

DI-MISC-80711A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Technical Manual Research and Analysis Source Data

Item No.

0007AE

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A005-Technical Manual Research and Analysis Source Data

DI-TMSS-81354

Associated Document(s) Line Item(s)

FD20601930143 0007

Technical Manual Research and Analysis Source Data

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Training Materials

Item No.

0007AF

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A006-Training Materials

DI-ILSS-80872

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

+ IAW1423 1 LO

Software Development Plan (SDP)

Item No.

0007AG

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A007-Software Development Plan (SDP)

DI-IPSC-81427B

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

System/Subsystem Specification (SSS)

Item No.

0007AH

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A008-System/Subsystem Specification (SSS)

DI-IPSC-81431A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

System/Subsystem Specification (SSS)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Computer Programming Manual (CPM)

Item No.

0007AJ

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A009-Computer Programming Manual (CPM)

DI-IPSC-81447A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Requirements Specification (SRS)

Item No.

0007AK

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00A-Software Requirements Specification (SRS)

Software Requirements Specification (SRS)

DI-IPSC-81433A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Transition Plan (STrP)

Item No.

0007AL

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00B-Software Transition Plan (STrP)

DI-IPSC-81429A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

Software Transition Plan (STrP)

Proposed Delivery

+ IAW1423 1 LO

System/Subsystem Design Description (SSDD)

Item No.

0007AM

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00C-System/Subsystem Design Description (SSDD)

DI-IPSC-81432A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Interface Design Description (IDD)

Item No.

0007AN

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00D-Interface Design Description (IDD)

DI-IPSC-81436A

Associated Document(s) Line Item(s)

FD20601930143 0007

Interface Design Description (IDD)

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Interface Control Document (ICD)

Item No.

0007AP

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00E-Interface Control Document (ICD)

DI-SESS-81248B

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Design Description (SDD)

Item No.

0007AQ

Not Separately Priced

Software Design Description (SDD)

Quantity U/I Unit Price

1 LO NSP

A00F-Software Design Description (SDD)

DI-IPSC-81435A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) Req No / Pri

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Product Specification (SPS)

Item No.

0007AR

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00G-Software Product Specification (SPS)

DI-IPSC-81441A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

Software Product Specification (SPS)

Proposed Delivery

+ IAW1423 1 LO

Software Version Description (SVD)

Item No.

0007AS

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00H-Software Version Description (SVD)

DI-IPSC-81442A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Firmware Support Manual (FSM)

Item No.

0007AT

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00J-Firmware Support Manual (FSM)

DI-IPSC-81448B

Associated Document(s) Line Item(s)

FD20601930143 0007

Firmware Support Manual (FSM)

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Test Plan (STP)

Item No.

0007AU

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00K-Software Test Plan (STP)

DI-IPSC-81438A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Software Test Description (STD)

Item No.

0007AV

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00L-Software Test Description (STD)

DI-IPSC-81439A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Test Report (STR)

Item No.

0007AW

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00M-Software Test Report (STR)

DI-IPSC-81440A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Software Test Report (STR)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software User Manual (SUM)

Item No.

0007AX

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00N-Software User Manual (SUM)

DI-IPSC-81443A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Software Architecture Document (SAD)

Item No.

0007AY

Not Separately Priced Quantity U/I Unit Price

A00P-Software Architecture Document (SAD)

Software Architecture Document (SAD)

DI-SESS-82043

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Interface Requirements Specification (IRS)

Item No.

0007AZ

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00Q-Interface Requirements Specification (IRS)

DI-IPSC-81434A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

Interface Requirements Specification (IRS)

Proposed Delivery

+ IAW1423 1 LO

Human Engineering Systems Analysis Report (HESAR)

Item No.

0007BA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00R-Human Engineering Systems Analysis Report (HESAR)

DI-HFAC-80745C

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Acceptance Test Plan

Item No.

0007BB

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00S-Acceptance Test Plan

DI-QCIC-80553A

Associated Document(s) Line Item(s)

FD20601930143 0007

Acceptance Test Plan

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Systems Engineering Master Plan (SEMP)

Item No.

0007BC

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00T-Systems Engineering Master Plan (SEMP)

DI-SESS-81785A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Weight and Balance Report for Aircraft

Item No.

0007BD

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00U-Weight and Balance Report for Aircraft

DI-MGMT-81501A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Information Assurance (IA) Design Review Information Package (DRIP)

Item No.

0007BE

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00V-Information Assurance (IA) Design Review Information Package (DRIP)

DI-MGMT-81845

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Information Assurance (IA) Design Review Information Package (DRIP)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Information Assurance (IA) Test Plan

Item No.

0007BF

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00W-Information Assurance (IA) Test Plan

DI-MGMT-81844

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Information Assurance (IA) Test Report

Item No.

0007BG

Not Separately Priced Quantity U/I Unit Price

A00X-Information Assurance (IA) Test Report

Information Assurance (IA) Test Report

DI-MGMT-81843

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Security Test Plan

Item No.

0007BH

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00Y-Security Test Plan

DI-NDTI-81351

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

Security Test Plan

Proposed Delivery

+ IAW1423 1 LO

System Safety Hazard Analysis Report (SSHAR)

Item No.

0007BJ

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A00Z-System Safety Hazard Analysis Report (SSHAR)

DI-SAFT-80101C

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Programmatic Environmental Safety and Health Evaluation (PESHE) Plan

Item No.

0007BK

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A010-Programmatic Environmental Safety and Health Evaluation (PESHE) Plan

DI-ENVR-81840

Associated Document(s) Line Item(s)

FD20601930143 0007

Programmatic Environmental Safety and Health Evaluation (PESHE) Plan

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Reliability and Maintainability Predictions Report

Item No.

0007BL

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A011-Reliability and Maintainability Predictions Report

DI-SESS-81497A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Failure Modes, Effects, and Criticality Analysis Report

Item No.

0007BM

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A012-Failure Modes, Effects, and Criticality Analysis Report

DI-SESS-81495A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Status Report

Item No.

0007BN

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A013-Status Report

DI-MGMT-80368A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Status Report

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Human Engineering Design Approach Document - Maintainer (HEDAD-M)

Item No.

0007BP

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A014-Human Engineering Design Approach Document - Maintainer (HEDAD-M)

DI-HFAC-80747C

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Integrated Master Plan (IMP)

Item No.

0007BQ

Not Separately Priced Quantity U/I Unit Price

A015-Integrated Master Plan (IMP)

Integrated Master Plan (IMP)

DI-MGMT-81797

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Test/Inspection Report

Item No.

0007BR

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A016-Test/Inspection Report

DI-NDTI-80809B

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

Test/Inspection Report

Proposed Delivery

+ IAW1423 1 LO

Product Drawings/Models and Associated Lists

Item No.

0007BS

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A017-Product Drawings/Models and Associated Lists

DI-SESS-81000E/T

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

TMCR

Item No.

0007BT

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A018-TMCR

TM-08-01

Associated Document(s) Line Item(s)

FD20601930143 0007

TMCR

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Logistics Product Data

Item No.

0007BU

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A019-Logistics Product Data

DI-SESS-81758A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Engineering Data for Provisioning

Item No.

0007BV

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01A-Engineering Data for Provisioning

DI-SESS-81874

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Program Protection Implementation Plan (PPIP)

Item No.

0007BW

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01B-Program Protection Implementation Plan (PPIP)

DI-SESS-81874

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Program Protection Implementation Plan (PPIP)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Contractor's Risk Management Plan

Item No.

0007BX

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01C-Contractor's Risk Management Plan

DI-MGMT-81808

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Integrated Program Management Report (IPMR)

Item No.

0007BY

Not Separately Priced Quantity U/I Unit Price

A01D-Integrated Program Management Report (IPMR)

Integrated Program Management Report (IPMR)

DI-MGMT-81861A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Reserved

Item No.

0007BZ

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01E-Reserved Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required

Reserved

Proposed Delivery

+ IAW1423 1 LO

Presentation Materials

Item No.

0007CA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01F-Presentation Materials

DI-ADMN-81373

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Integrated Logistics Support Plan

Item No.

0007CB

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01G-Integrated Logistics Support Plan

DI-ILSS-80095

Associated Document(s) Line Item(s)

FD20601930143 0007

Integrated Logistics Support Plan

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Item Unique Identification (IUID) Marking Activity, Validation and Verification

Item No.

0007CC

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01H-Item Unique Identification (IUID) Marking Activity, Validation and Verification Report

DI-MGMT-81804A

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Item Unique Identification (IUID) Marking Plan

Item No.

0007CD

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01J-Item Unique Identification (IUID) Marking Plan

DI-MGMT-81803

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Counterfeit Prevention Plan

Item No.

0007CE

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01K-Counterfeit Prevention Plan

DI-MISC-81832

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Counterfeit Prevention Plan

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Status of Government Furnished Equipment (GFE) Report

Item No.

0007CF

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01L-Status of Government Furnished Equipment (GFE) Report

DI-MGMT-80269

Associated Document(s) Line Item(s)

FD20601930143 0007

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Contractor Travel

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 EA

Contractor Travel and Per Diem Travel IAW Attached PWS.

Contractor Travel

Travel shall be approved in advance by the PCO. Travel charges shall be IAW FAR 31.205-46, Travel Costs.

Associated Document(s) Line Item(s)

FD20601930143 0008

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

1 EA

Proposed Delivery

1 EA

As Required

HH-60G Degraded Visual Environment System Familiarization

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

System Familiarization Associated Document(s) Line Item(s)

FD20601930143 0009

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri

Required

1 LO *18 Months

HH-60G Degraded Visual Environment System Familiarization

Proposed Delivery

1 LO

OPTION PERIOD I: The 12 month period immediately following the basic contract period. The option may be exercised on or before the last day of the contract period. An option is determined to be exercised at time of the written notification to the contractor via email.

HH-60G Degraded Visual Environment Production Kits

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

31 KT

Prodcution Kits Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Data

Item No.

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Conference Agenda

Item No.

1002AA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A001-Conference Agenda

DI-ADMN-81249B

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Conference Minutes

Item No.

1002AB

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A002-Conference Minutes

DI-ADMN-81250B

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Conference Minutes

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Status Report

Item No.

1002AC

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

A013-Status Report

DI-MGMT-80368A

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Presentation Materials

Item No.

1002AD

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A01F-Presentation Materials

DI-ADMN-81373

Presentation Materials

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

OPTION PERIOD II: The 12 month period immediately following the Option Period I. The option may be exercised on or before the last day of the contract period. An option is determined to be exercised at time of the written notification to the contractor via email.

HH-60G Degraded Visual Environment Production Kits

Item No.

Firm Fixed Price Quantity U/I Unit Price Amount

31 KT

Prodcution Kits Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Data

Item No.

Data

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

DATA

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Conference Agenda

Item No.

2002AA

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A001-Conference Agenda

DI-ADMN-81249B

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed

Conference Minutes

Item No.

2002AB

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A002-Conference Minutes

DI-ADMN-81250B

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Required Delivery

+ IAW1423 1 LO

Proposed Delivery

+ IAW1423 1 LO

Status Report

Item No.

2002AC

Not Separately Priced Quantity U/I Unit Price

1 LO NSP

A013-Status Report

DI-MGMT-80368A

Priority: R ROUTINE

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.