FA855218R0005-Draft.pdf
PDF 193 KB Posted
- Attached to
- HH-60G Degraded Visual Environment
- Solicitation number
- FA855218R0005
About this file
RFP-Draft
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 1447 (2/2012)
Prescribed by GSA FAR (48 CFR) 53.215-1(d)
4. SOLICITATION NUMBER
FA8552-18-R-0005
X
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS CODE:
8(A) SIZE STANDARD:
DATE SIGNED
28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
ROUTINE
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 180 days.
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) ( ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *180
RATING
DO: A1
3. AWARD/EFFECTIVE DATE
FA8552
2. CONTRACT NO.
X
CHECK IF REMITTANCE IS DIFFERENT
AND PUT SUCH ADDRESS IN OFFER
17.
ITEM NO.
12. ADMINISTERED BY CODE
Estimated
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:B
NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER
24. AWARD AMOUNT (FOR GOVT USE ONLY)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAY DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)
SUPPLIES SERVICES
9.
Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.
30-JUL-2018 4:30PM
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
SOF/PR - ROTARY WING & AVIONICS, AFLCMC/WIUKB
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7227
ROBINS AFB GA 31098-1670
BUYER: Leigh Ann Taylor/WIUKB leigh.taylor.3@us.af.mil Phone: (478) 926- 7441 No Collect Calls
X
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
JSU
SF 1447 (rev 2/2012) BACK
NO RESPONSE FOR THE REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
CANNOT COMPLY WITH SPECIFICATIONS
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
FOLD
FOLD
SOLICITATION NO. FA855218R0005
DUE: 30 JUL 2018 4:30 PM
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Leigh A Taylor/WIUKB
SOF/PR - ROTARY WING & AVIONICS, AFLCMC/WIUKB
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7227
ROBINS AFB GA 31098-1670
FA8552-18-R-0005
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
BASIC CONTRACT PERIOD: The 24 month period effective from the date of contract award.
HH-60G Degraded Visual Environment Non-Recurring Engineering
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Non-Recurring Engineering IAW attached PWS Associated Document(s) Line Item(s)
FD20601930143 0001
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
1 LO *24 Months
Proposed Delivery
1 LO
HH-60G Degraded Visual Environment Prototype Installation Kit
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 KT
Prototype Installation Kit Associated Document(s) Line Item(s)
FD20601930143 0002
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
HH-60G Degraded Visual Environment Prototype Installation Kit
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Buy American Act/Balance of Payments Program Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
A TBD 1 KT *18 Months
Proposed Delivery
A TBD 1 KT
HH-60G Degraded Visual Environment Verification Installation Kit
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 KT
Verification Installation Kit Associated Document(s) Line Item(s)
FD20601930143 0003
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
A TBD 1 KT *22 Months
Proposed Delivery
A TBD 1 KT
HH-60G Degraded Visual Environment Lab/Simulator Kits
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 KT
Lab/Simulator Kits
IAW PWS
Associated Document(s) Line Item(s)
FD20601930143 0004
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
+ F3QCBJ 6 KT *18 Months
Proposed Delivery
+ F3QCBJ 6 KT
HH-60G Degraded Visual Environment Prototype Installation Labor
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Prototype Installation Labor Associated Document(s) Line Item(s)
FD20601930143 0005
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
HH-60G Degraded Visual Environment Prototype Installation Labor
Buy American Act/Balance of Payments Program Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
A TBD 1 LO *18 Months
Proposed Delivery
A TBD 1 LO
HH-60G Degraded Visual Environment Verification Installation Labor
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
Verification Installation Labor Associated Document(s) Line Item(s)
FD20601930143 0006
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required Delivery
A TBD 1 LO *22 Months
Proposed Delivery
A TBD 1 LO
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Data
DATA IAW DD1423
Associated Document(s) Line Item(s)
Data
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Conference Agenda
Item No.
0007AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A001-Conference Agenda
DI-ADMN-81249B
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) _ _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Conference Minutes
Item No.
0007AB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A002-Conference Minutes
DI-ADMN-81250B
Associated Document(s) Line Item(s)
Conference Minutes
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Bill of Materials (BOM) for Logistics and Supply Chain Risk Management
Item No.
0007AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A003-Bill of Materials (BOM) for Logistics and Supply Chain Risk Management
DI-PSSS-81656B
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed
Bill of Materials (BOM) for Logistics and Supply Chain Risk Management
+ IAW1423 1 LO
Scientific and Technical Reports
Item No.
0007AD
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A004-Scientific and Technical Reports
DI-MISC-80711A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Technical Manual Research and Analysis Source Data
Item No.
0007AE
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A005-Technical Manual Research and Analysis Source Data
DI-TMSS-81354
Associated Document(s) Line Item(s)
FD20601930143 0007
Technical Manual Research and Analysis Source Data
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Training Materials
Item No.
0007AF
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A006-Training Materials
DI-ILSS-80872
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed
+ IAW1423 1 LO
Software Development Plan (SDP)
Item No.
0007AG
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A007-Software Development Plan (SDP)
DI-IPSC-81427B
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
System/Subsystem Specification (SSS)
Item No.
0007AH
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A008-System/Subsystem Specification (SSS)
DI-IPSC-81431A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
System/Subsystem Specification (SSS)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Computer Programming Manual (CPM)
Item No.
0007AJ
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A009-Computer Programming Manual (CPM)
DI-IPSC-81447A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Software Requirements Specification (SRS)
Item No.
0007AK
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00A-Software Requirements Specification (SRS)
Software Requirements Specification (SRS)
DI-IPSC-81433A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Software Transition Plan (STrP)
Item No.
0007AL
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00B-Software Transition Plan (STrP)
DI-IPSC-81429A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required
Software Transition Plan (STrP)
Proposed Delivery
+ IAW1423 1 LO
System/Subsystem Design Description (SSDD)
Item No.
0007AM
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00C-System/Subsystem Design Description (SSDD)
DI-IPSC-81432A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Interface Design Description (IDD)
Item No.
0007AN
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00D-Interface Design Description (IDD)
DI-IPSC-81436A
Associated Document(s) Line Item(s)
FD20601930143 0007
Interface Design Description (IDD)
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Interface Control Document (ICD)
Item No.
0007AP
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00E-Interface Control Document (ICD)
DI-SESS-81248B
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Software Design Description (SDD)
Item No.
0007AQ
Not Separately Priced
Software Design Description (SDD)
Quantity U/I Unit Price
1 LO NSP
A00F-Software Design Description (SDD)
DI-IPSC-81435A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Software Product Specification (SPS)
Item No.
0007AR
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00G-Software Product Specification (SPS)
DI-IPSC-81441A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required
Software Product Specification (SPS)
Proposed Delivery
+ IAW1423 1 LO
Software Version Description (SVD)
Item No.
0007AS
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00H-Software Version Description (SVD)
DI-IPSC-81442A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Firmware Support Manual (FSM)
Item No.
0007AT
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00J-Firmware Support Manual (FSM)
DI-IPSC-81448B
Associated Document(s) Line Item(s)
FD20601930143 0007
Firmware Support Manual (FSM)
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Software Test Plan (STP)
Item No.
0007AU
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00K-Software Test Plan (STP)
DI-IPSC-81438A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed
Software Test Description (STD)
Item No.
0007AV
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00L-Software Test Description (STD)
DI-IPSC-81439A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Software Test Report (STR)
Item No.
0007AW
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00M-Software Test Report (STR)
DI-IPSC-81440A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Software Test Report (STR)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Software User Manual (SUM)
Item No.
0007AX
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00N-Software User Manual (SUM)
DI-IPSC-81443A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Software Architecture Document (SAD)
Item No.
0007AY
Not Separately Priced Quantity U/I Unit Price
A00P-Software Architecture Document (SAD)
Software Architecture Document (SAD)
DI-SESS-82043
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Interface Requirements Specification (IRS)
Item No.
0007AZ
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00Q-Interface Requirements Specification (IRS)
DI-IPSC-81434A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required
Interface Requirements Specification (IRS)
Proposed Delivery
+ IAW1423 1 LO
Human Engineering Systems Analysis Report (HESAR)
Item No.
0007BA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00R-Human Engineering Systems Analysis Report (HESAR)
DI-HFAC-80745C
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Acceptance Test Plan
Item No.
0007BB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00S-Acceptance Test Plan
DI-QCIC-80553A
Associated Document(s) Line Item(s)
FD20601930143 0007
Acceptance Test Plan
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Systems Engineering Master Plan (SEMP)
Item No.
0007BC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00T-Systems Engineering Master Plan (SEMP)
DI-SESS-81785A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed
Weight and Balance Report for Aircraft
Item No.
0007BD
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00U-Weight and Balance Report for Aircraft
DI-MGMT-81501A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Information Assurance (IA) Design Review Information Package (DRIP)
Item No.
0007BE
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00V-Information Assurance (IA) Design Review Information Package (DRIP)
DI-MGMT-81845
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Information Assurance (IA) Design Review Information Package (DRIP)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Information Assurance (IA) Test Plan
Item No.
0007BF
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00W-Information Assurance (IA) Test Plan
DI-MGMT-81844
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Information Assurance (IA) Test Report
Item No.
0007BG
Not Separately Priced Quantity U/I Unit Price
A00X-Information Assurance (IA) Test Report
Information Assurance (IA) Test Report
DI-MGMT-81843
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Security Test Plan
Item No.
0007BH
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00Y-Security Test Plan
DI-NDTI-81351
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required
Security Test Plan
Proposed Delivery
+ IAW1423 1 LO
System Safety Hazard Analysis Report (SSHAR)
Item No.
0007BJ
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A00Z-System Safety Hazard Analysis Report (SSHAR)
DI-SAFT-80101C
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Programmatic Environmental Safety and Health Evaluation (PESHE) Plan
Item No.
0007BK
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A010-Programmatic Environmental Safety and Health Evaluation (PESHE) Plan
DI-ENVR-81840
Associated Document(s) Line Item(s)
FD20601930143 0007
Programmatic Environmental Safety and Health Evaluation (PESHE) Plan
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Reliability and Maintainability Predictions Report
Item No.
0007BL
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A011-Reliability and Maintainability Predictions Report
DI-SESS-81497A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed
Failure Modes, Effects, and Criticality Analysis Report
Item No.
0007BM
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A012-Failure Modes, Effects, and Criticality Analysis Report
DI-SESS-81495A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Status Report
Item No.
0007BN
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A013-Status Report
DI-MGMT-80368A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Status Report
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Human Engineering Design Approach Document - Maintainer (HEDAD-M)
Item No.
0007BP
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A014-Human Engineering Design Approach Document - Maintainer (HEDAD-M)
DI-HFAC-80747C
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Integrated Master Plan (IMP)
Item No.
0007BQ
Not Separately Priced Quantity U/I Unit Price
A015-Integrated Master Plan (IMP)
Integrated Master Plan (IMP)
DI-MGMT-81797
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Test/Inspection Report
Item No.
0007BR
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A016-Test/Inspection Report
DI-NDTI-80809B
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required
Test/Inspection Report
Proposed Delivery
+ IAW1423 1 LO
Product Drawings/Models and Associated Lists
Item No.
0007BS
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A017-Product Drawings/Models and Associated Lists
DI-SESS-81000E/T
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
TMCR
Item No.
0007BT
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A018-TMCR
TM-08-01
Associated Document(s) Line Item(s)
FD20601930143 0007
TMCR
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Logistics Product Data
Item No.
0007BU
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A019-Logistics Product Data
DI-SESS-81758A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed
Engineering Data for Provisioning
Item No.
0007BV
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A01A-Engineering Data for Provisioning
DI-SESS-81874
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Program Protection Implementation Plan (PPIP)
Item No.
0007BW
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A01B-Program Protection Implementation Plan (PPIP)
DI-SESS-81874
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Program Protection Implementation Plan (PPIP)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Contractor's Risk Management Plan
Item No.
0007BX
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A01C-Contractor's Risk Management Plan
DI-MGMT-81808
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Integrated Program Management Report (IPMR)
Item No.
0007BY
Not Separately Priced Quantity U/I Unit Price
A01D-Integrated Program Management Report (IPMR)
Integrated Program Management Report (IPMR)
DI-MGMT-81861A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Reserved
Item No.
0007BZ
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A01E-Reserved Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required
Reserved
Proposed Delivery
+ IAW1423 1 LO
Presentation Materials
Item No.
0007CA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A01F-Presentation Materials
DI-ADMN-81373
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Integrated Logistics Support Plan
Item No.
0007CB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A01G-Integrated Logistics Support Plan
DI-ILSS-80095
Associated Document(s) Line Item(s)
FD20601930143 0007
Integrated Logistics Support Plan
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Item Unique Identification (IUID) Marking Activity, Validation and Verification
Item No.
0007CC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A01H-Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
DI-MGMT-81804A
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed
Item Unique Identification (IUID) Marking Plan
Item No.
0007CD
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A01J-Item Unique Identification (IUID) Marking Plan
DI-MGMT-81803
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Counterfeit Prevention Plan
Item No.
0007CE
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A01K-Counterfeit Prevention Plan
DI-MISC-81832
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Counterfeit Prevention Plan
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Status of Government Furnished Equipment (GFE) Report
Item No.
0007CF
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A01L-Status of Government Furnished Equipment (GFE) Report
DI-MGMT-80269
Associated Document(s) Line Item(s)
FD20601930143 0007
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Contractor Travel
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 EA
Contractor Travel and Per Diem Travel IAW Attached PWS.
Contractor Travel
Travel shall be approved in advance by the PCO. Travel charges shall be IAW FAR 31.205-46, Travel Costs.
Associated Document(s) Line Item(s)
FD20601930143 0008
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
1 EA
Proposed Delivery
1 EA
As Required
HH-60G Degraded Visual Environment System Familiarization
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
System Familiarization Associated Document(s) Line Item(s)
FD20601930143 0009
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Type / Ship To Quantity (U/I) *ARO Contract _ Req No / Pri
Required
1 LO *18 Months
HH-60G Degraded Visual Environment System Familiarization
Proposed Delivery
1 LO
OPTION PERIOD I: The 12 month period immediately following the basic contract period. The option may be exercised on or before the last day of the contract period. An option is determined to be exercised at time of the written notification to the contractor via email.
HH-60G Degraded Visual Environment Production Kits
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
31 KT
Prodcution Kits Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Conference Agenda
Item No.
1002AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A001-Conference Agenda
DI-ADMN-81249B
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Conference Minutes
Item No.
1002AB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A002-Conference Minutes
DI-ADMN-81250B
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Conference Minutes
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Status Report
Item No.
1002AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
A013-Status Report
DI-MGMT-80368A
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Presentation Materials
Item No.
1002AD
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A01F-Presentation Materials
DI-ADMN-81373
Presentation Materials
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
OPTION PERIOD II: The 12 month period immediately following the Option Period I. The option may be exercised on or before the last day of the contract period. An option is determined to be exercised at time of the written notification to the contractor via email.
HH-60G Degraded Visual Environment Production Kits
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
31 KT
Prodcution Kits Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Data
Item No.
Data
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Conference Agenda
Item No.
2002AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A001-Conference Agenda
DI-ADMN-81249B
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed
Conference Minutes
Item No.
2002AB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A002-Conference Minutes
DI-ADMN-81250B
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
Status Report
Item No.
2002AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
A013-Status Report
DI-MGMT-80368A
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.