Q A_dtd_08062013.pdf

PDF 76 KB Posted

Attached to
500 Gallon Liquid Oxygen/Liquid Nitrogen Storage Tanks Federal contract opportunity
Solicitation number
FA8533-13-R-30278
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Questions and Answers dtd 8-06-2013

View the file

Other files for this federal contract opportunity

Other files attached to 500 Gallon Liquid Oxygen/Liquid Nitrogen Storage Tanks, newest first.
File Type Posted
Post_Award_Announcement_Synopsis.doc DOC document
FA853313R30278______0002.pdf PDF
PD13WRGRVEA05RevC30July2013.pdf PDF
Attachment1FACTSSheet_revised.pdf PDF
PD13WRGRVEA05 _Rev_B _dtd_25_July_2013.pdf PDF
Q A_dtd_07252013.pdf PDF
FA853313R30278______0001.pdf PDF
C004-SystemSafetyHazardAnalysisReport.pdf PDF
EDL2544.pdf PDF
B005-NoticeofRevision.pdf PDF
EDL1576.pdf PDF
AFMCForm158.pdf PDF
Attachment1FACTSSheet.pdf PDF
A001-TestProcedure.pdf PDF
C005-ProductBaseLineIndex.pdf PDF
StatementWork.pdf PDF
E002-SupplementalDataforProvisioning-Oxygen.pdf PDF
A002-TestInspectionReports.pdf PDF
C003-SystemSafetyProgramPlan.pdf PDF
Attachment3TransmittalLetter.pdf PDF
E004SupplementalDataForProvisioning-Nitrogen.pdf PDF
CertificateofEquivalency.pdf PDF
B002-ConferenceAgenda.pdf PDF
Attachment4ClientAuthorizationLetter.pdf PDF
B004-EngineeringChangeProposal.pdf PDF
E003-InformationLMIDataProducts.pdf PDF
D001-TechnicalManualContractRequirements-Oxyge.pdf PDF
A006-InstructionalMediaPackage.pdf PDF
Attachment2Questionnaire.pdf PDF
FA853313R30278.pdf PDF
PurchaseDescription.pdf PDF
C002-CorrosionPreventionandControlPlan.pdf PDF
A005-DesignDataandCalculations.pdf PDF
A004-TechnicalReportStudyServices.pdf PDF
Attachment5TeamingPartnerConsentForm.pdf PDF
D002-TechnicalManualContractRequirements-Nitro.pdf PDF
B001-ContractorsProgressStatusManagementReport.pdf PDF
A003-ProductionReports.pdf PDF
B006-RequestforDeviation.pdf PDF
Attachment6QuantityRanges.pdf PDF
E001-InformationLMIDataProducts-Oxygen.pdf PDF
B003-ConferenceMinutes.pdf PDF
C001-WeldingProcedures.pdf PDF
Show all 43

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8533‐13‐R‐30278

Questions & Answers dated 8/6/2013

Question 1: Each type of unit (One LOX unit and One LIN unit) will be built for First Article Inspection per the contract, inclusive of evaluation with LOX in one system and separately LIN in the other system. Both of these units will be identical with the exception of the fill connection, service connections and paint/markings. Please confirm both first article units have to go through all the environmental testing (which includes vibration, emergency landing shock, temperature operation & storage, humidity, slat fog, rain, sand, dust, wind and ice accretion) and no submission of any of these tests can be done by similarity between the two. Is this correct?

Answer 1: See Amendment 0002. Only one type of unit, the Liquid Oxygen tank (LOX), shall be used for the environmental testing during First Article test.

Question 2: Test Paragraph 4.7.7 is a 7 day vacuum retention test that is performed on every production unit. The test paragraph further defines that during the 7 day vacuum retention test the production unit shall be subjected to vibration of not less than 30 minutes duration in one plane. Please confirm that every production unit will see this vibration during the 7 day vacuum retention test. Is this correct?

Answer 2: Yes, In accordance with the PD, paragraph 4.7.7, the vacuum portion of the test is for every production unit.