Wage_Determination.pdf

PDF 64 KB Posted

Attached to
Construct New Depack Facility Near Building 145 Federal contract opportunity
Solicitation number
FA8501-16-B-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Wage Determination

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Depack Facility Near Building 145, newest first.
File Type Posted
Abstract_Signed_.pdf PDF
Geotech_Report _RAFB_Depack_Facility.pdf PDF
Requests_For_Information--08-05-16.docx DOCX document
Site_Visit_Sign_In_Sheet.pdf PDF
Request_For_Information_1.docx DOCX document
Conform_Document.pdf PDF
Modification_Document.pdf PDF
Amendment_1.pdf PDF
Amendment_1_Conform.pdf PDF
Special_Warranty_Requirements_Letter.doc DOC document
140006--SUBMITTAL_REGISTER_-_Construction_Contract_(initial).pdf PDF
Drawings--rev1_Part2.pdf PDF
App_C_UHHZ_140006.pdf PDF
FA8501-16-D-0001_FBO_Posting.pdf PDF
BASE_FACILITY_STANDARDS_REV_23_June_14.pdf PDF
Combined_Specs_Double_Sided--rev_2.pdf PDF
Drawings--rev1_Part1.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: GA160152 05/20/2016 GA152

Superseded General Decision Number: GA20150152

State: Georgia

Construction Type: Building

County: Houston County in Georgia.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 03/11/2016 2 05/20/2016

* ASBE0048-001 04/01/2016

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 26.92 14.96

BOIL0026-001 01/01/2013

Rates Fringes

BOILERMAKER......................$ 24.91 19.69

ELEC1316-020 01/01/2015

Rates Fringes

ELECTRICIAN (Including Low Voltage Wiring)..................$ 22.85 10.95

ENGI0474-001 07/01/2013

Rates Fringes

POWER EQUIPMENT OPERATOR:

Bobcat/Skid Steer/Skid Loader, Bulldozer, and Forklift (under 15 tons)....$ 22.72 12.30 Crane (over 10 tons) and Forklift (15 tons and over).$ 24.55 12.30

7/18/2016http://www.wdol.gov/wdol/scafiles/davisbacon/GA152.dvb?v=2

Crane (over 120 tons).......$ 25.55 12.30 Crane (over 250 tons).......$ 26.55 12.30 Oiler.......................$ 20.38 12.30

PLUM0072-007 08/01/2015

Rates Fringes

PIPEFITTER (Including HVAC Pipe Installation)...............$ 27.70 13.43

PLUMBER..........................$ 27.70 13.43

SHEE0085-009 08/01/2012

Rates Fringes

SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 29.34 13.44

SUGA2012-059 08/11/2012

Rates Fringes

BRICKLAYER.......................$ 15.09 1.04

CARPENTER, Includes Form Work....$ 15.00 0.00

CEMENT MASON/CONCRETE FINISHER...$ 15.18 3.89

FLOOR LAYER (Carpet, Vinyl and Resilient Flooring)..........$ 20.00 0.00

IRONWORKER, REINFORCING..........$ 20.47 3.89

IRONWORKER, STRUCTURAL...........$ 24.04 9.26

LABORER: Common or General......$ 10.99 0.00

LABORER: Mason Tender - Brick...$ 9.00 0.00

LABORER: Pipelayer..............$ 11.48 1.90

OPERATOR: Backhoe/Excavator.....$ 14.63 0.00

OPERATOR: Grader/Blade..........$ 17.52 0.00

OPERATOR: Loader................$ 8.00 0.00

PAINTER: Brush, Roller and Spray............................$ 16.00 1.62

ROOFER...........................$ 14.48 0.00

SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 18.03 0.00

TILE FINISHER....................$ 10.31 0.00

TILE SETTER......................$ 20.00 0.00

TRUCK DRIVER: Dump Truck........$ 10.00 1.33

TRUCK DRIVER: Lowboy Truck......$ 17.41 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .