About this file

Submittal Register

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Depack Facility Near Building 145, newest first.
File Type Posted
Abstract_Signed_.pdf PDF
Geotech_Report _RAFB_Depack_Facility.pdf PDF
Requests_For_Information--08-05-16.docx DOCX document
Site_Visit_Sign_In_Sheet.pdf PDF
Request_For_Information_1.docx DOCX document
Modification_Document.pdf PDF
Conform_Document.pdf PDF
Wage_Determination.pdf PDF
Amendment_1.pdf PDF
Amendment_1_Conform.pdf PDF
Special_Warranty_Requirements_Letter.doc DOC document
FA8501-16-D-0001_FBO_Posting.pdf PDF
BASE_FACILITY_STANDARDS_REV_23_June_14.pdf PDF
Combined_Specs_Double_Sided--rev_2.pdf PDF
Drawings--rev1_Part1.pdf PDF
Drawings--rev1_Part2.pdf PDF
App_C_UHHZ_140006.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4600-11-B-0025

Attachment 3

PROJECT NO.

UHHZ 140006

APPROVED DISAPPROVED

1 Topographic and Utility Surveys D-NTP + 21

8 AF2519 Welding and Safety Checklist D-NTP + 14

10 Contractor's Kickoff Meeting Checklist At Kick-off Meeting

11 Stormwater Permit Application--N/A

12 Work Plan C-NTP + 15

13 Solid Waste Disposal Plan C-NTP + 16

14 Storage and Trailer Request C-NTP + 17

15 Time Schedule C-NTP + 18

16 List of Values C-NTP + 19

17 AF Form 3064 & 3065 C-NTP + 20

18 List of Proposed Subcontractors C-NTP + 21

19 Superintendent & Certified Formen (if req'd) C-NTP + 22

20 Systems Functional Test Report 7 Days prior to Pre-Final Insp.

21 Request for Final Inspection 7 Days prior to Pre-Final Insp.

22 Operations and Maintenance Manuals Prior to Closeout

23 As-built Drawings Prior to Closeout

24 Warranties Prior to Closeout

Construction List of Material Submittals (see Material Submittals below) Prior to Closeout

Construction List of Material Submittals (see Material Submittals below) Prior to Closeout Material Submittals List below all mat. submittals (design and constr.)

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O U

T

C

LO

SE

O

U T

O

PE

R

AT

IN

G

ST

R

U C

TI

O

N

S DATE

TO

CIVIL

ENGR.

SH

O

P D

R

AW

IN

G

S

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O

TH

ER

M

AT

ER

IA

L

O R

AT

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

EC

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

RETURN

SUSPENSE

DATE

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

W

AR

R

AN

TY

SOLICITATION/CONTRACT NO.PROJECT TITLE

Construct Depack Facility near B145 FA8501-XXXX

SCHEDULE OF MATERIAL SUBMITTALS

ROBINS AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

Not Used

Not Used

Not Used Not Used

Not Used Not Used

Not Used

1B-2

PROJECT NO.

UHHZ 130209

APPROVED DISAPPROVEDC

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SE

O U

T

C

LO

SE

O

U T

O

PE

R

AT

R

U C

TI

O

N

S DATE

TO

CIVIL

ENGR.

SH

O

P D

R

AW

IN

G

S

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O

TH

ER

M

AT

ER

IA

L

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

RETURN

SUSPENSE

DATE

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

R

AN

TY

SOLICITATION/CONTRACT NO.PROJECT TITLE

Construct Addition to Kitting Facility, B20121 FA8501-XXXX

SCHEDULE OF MATERIAL SUBMITTALS

ROBINS AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

LEGEND:

D-NTP = Design NTP, C-NTP = Construction NTP

1B-3

PROJECT NO.

UHHZ 130209

APPROVED DISAPPROVEDC

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

SA

M

PL

ES

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

SE

O U

T

C

LO

SE

O

U T

O

PE

R

AT

R

U C

TI

O

N

S DATE

TO

CIVIL

ENGR.

SH

O

P D

R

AW

IN

G

S

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O

TH

ER

M

AT

ER

IA

L

A

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

O M

M

EN

D

AT

IO

N

S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

RETURN

SUSPENSE

DATE

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

BEFORE CONSTR AFTER CONSTR

M

AN

U

FA

C

TU

R

R

AN

TY

SOLICITATION/CONTRACT NO.PROJECT TITLE

Construct Addition to Kitting Facility, B20121 FA8501-XXXX

SCHEDULE OF MATERIAL SUBMITTALS

ROBINS AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

Sheet1

File details come from the government source that posted it. Updated .