140006--SUBMITTAL_REGISTER_-_Construction_Contract_(initial).pdf
PDF 156 KB Posted
- Attached to
- Construct New Depack Facility Near Building 145 Federal contract opportunity
- Solicitation number
- FA8501-16-B-0001
About this file
Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract_Signed_.pdf | ||
| Geotech_Report _RAFB_Depack_Facility.pdf | ||
| Requests_For_Information--08-05-16.docx | DOCX document | |
| Site_Visit_Sign_In_Sheet.pdf | ||
| Request_For_Information_1.docx | DOCX document | |
| Modification_Document.pdf | ||
| Conform_Document.pdf | ||
| Wage_Determination.pdf | ||
| Amendment_1.pdf | ||
| Amendment_1_Conform.pdf | ||
| Special_Warranty_Requirements_Letter.doc | DOC document | |
| FA8501-16-D-0001_FBO_Posting.pdf | ||
| BASE_FACILITY_STANDARDS_REV_23_June_14.pdf | ||
| Combined_Specs_Double_Sided--rev_2.pdf | ||
| Drawings--rev1_Part1.pdf | ||
| Drawings--rev1_Part2.pdf | ||
| App_C_UHHZ_140006.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4600-11-B-0025
Attachment 3
PROJECT NO.
UHHZ 140006
APPROVED DISAPPROVED
1 Topographic and Utility Surveys D-NTP + 21
8 AF2519 Welding and Safety Checklist D-NTP + 14
10 Contractor's Kickoff Meeting Checklist At Kick-off Meeting
11 Stormwater Permit Application--N/A
12 Work Plan C-NTP + 15
13 Solid Waste Disposal Plan C-NTP + 16
14 Storage and Trailer Request C-NTP + 17
15 Time Schedule C-NTP + 18
16 List of Values C-NTP + 19
17 AF Form 3064 & 3065 C-NTP + 20
18 List of Proposed Subcontractors C-NTP + 21
19 Superintendent & Certified Formen (if req'd) C-NTP + 22
20 Systems Functional Test Report 7 Days prior to Pre-Final Insp.
21 Request for Final Inspection 7 Days prior to Pre-Final Insp.
22 Operations and Maintenance Manuals Prior to Closeout
23 As-built Drawings Prior to Closeout
24 Warranties Prior to Closeout
Construction List of Material Submittals (see Material Submittals below) Prior to Closeout
Construction List of Material Submittals (see Material Submittals below) Prior to Closeout Material Submittals List below all mat. submittals (design and constr.)
C
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
SA
M
PL
ES
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
AN
D
C
LO
SE
O U
T
C
LO
SE
O
U T
O
PE
R
AT
IN
G
ST
R
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
SH
O
P D
R
AW
IN
G
S
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
ER
M
AT
ER
IA
L
O R
AT
A
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
ER
'S
EC
O M
M
EN
D
AT
IO
N
S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
RETURN
SUSPENSE
DATE
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
BEFORE CONSTR AFTER CONSTR
M
AN
U
FA
C
TU
R
W
AR
R
AN
TY
SOLICITATION/CONTRACT NO.PROJECT TITLE
Construct Depack Facility near B145 FA8501-XXXX
SCHEDULE OF MATERIAL SUBMITTALS
ROBINS AFB
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
Not Used
Not Used
Not Used Not Used
Not Used Not Used
Not Used
1B-2
PROJECT NO.
UHHZ 130209
APPROVED DISAPPROVEDC
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
SA
M
PL
ES
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SE
O U
T
C
LO
SE
O
U T
O
PE
R
AT
R
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
SH
O
P D
R
AW
IN
G
S
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
ER
M
AT
ER
IA
L
A
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
RETURN
SUSPENSE
DATE
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
BEFORE CONSTR AFTER CONSTR
M
AN
U
FA
C
TU
R
R
AN
TY
SOLICITATION/CONTRACT NO.PROJECT TITLE
Construct Addition to Kitting Facility, B20121 FA8501-XXXX
SCHEDULE OF MATERIAL SUBMITTALS
ROBINS AFB
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
LEGEND:
D-NTP = Design NTP, C-NTP = Construction NTP
1B-3
PROJECT NO.
UHHZ 130209
APPROVED DISAPPROVEDC
AT
AL
O
G D
AT
A
LI
N
E N
U M
BE
R
SA
M
PL
ES
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
SE
O U
T
C
LO
SE
O
U T
O
PE
R
AT
R
U C
TI
O
N
S DATE
TO
CIVIL
ENGR.
SH
O
P D
R
AW
IN
G
S
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
ER
M
AT
ER
IA
L
A
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
C
TU
R
O M
M
EN
D
AT
IO
N
S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
RETURN
SUSPENSE
DATE
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
BEFORE CONSTR AFTER CONSTR
M
AN
U
FA
C
TU
R
R
AN
TY
SOLICITATION/CONTRACT NO.PROJECT TITLE
Construct Addition to Kitting Facility, B20121 FA8501-XXXX
SCHEDULE OF MATERIAL SUBMITTALS
ROBINS AFB
NO. OF COPIES REQUIRED
TO BE COMPLETED BY PROJECT ENGINEER
Sheet1
File details come from the government source that posted it. Updated .