Requests_For_Information--08-05-16.docx

DOCX document 13 KB Posted

Attached to
Construct New Depack Facility Near Building 145 Federal contract opportunity
Solicitation number
FA8501-16-B-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Responses to submitted RFIs

View the file

Other files for this federal contract opportunity

Other files attached to Construct New Depack Facility Near Building 145, newest first.
File Type Posted
Abstract_Signed_.pdf PDF
Geotech_Report _RAFB_Depack_Facility.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
Request_For_Information_1.docx DOCX document
Modification_Document.pdf PDF
Conform_Document.pdf PDF
Wage_Determination.pdf PDF
Amendment_1.pdf PDF
Amendment_1_Conform.pdf PDF
Special_Warranty_Requirements_Letter.doc DOC document
140006--SUBMITTAL_REGISTER_-_Construction_Contract_(initial).pdf PDF
Combined_Specs_Double_Sided--rev_2.pdf PDF
Drawings--rev1_Part1.pdf PDF
FA8501-16-D-0001_FBO_Posting.pdf PDF
BASE_FACILITY_STANDARDS_REV_23_June_14.pdf PDF
Drawings--rev1_Part2.pdf PDF
App_C_UHHZ_140006.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requests for Information/Clarification Composite Document

1. Reference spec section 13 34 19, 2.4.2: The first paragraph calls for factory-applied polyvinylidene fluoride finish (which is Kynar). Subpart C. mentions Vinyl Plastisol which is a different product/process (and I don’t think is even available anymore in the industry). Please clarify.

The proper material is polyvinylidene fluoride finish (Kynar), not Vinyl Plastisol.

2. Reference sheet CC102: Is it acceptable to substitute the HD Asphalt with Concrete Paving as a contractors option?

Yes, as long as the cost is less than or equal to the cost of the high density asphalt.

3. Reference sheet CU103: Item 13 under Construction Notes advises to undercut to a depth of 6 feet or more according to the Geotechnical Report. I cannot find the Geotechnical Report in either the specs or drawings. Can you assist with this?

It was inadvertently left out of the documents provided to Contracting and was not included in the Specs, which is where we normally include it. It is attached.

4. Please advise as to the required stencil size for the 'LOADING ZONE NO PARKING' pavement markings as shown on Plate Number CC102.

Eight-inch high letters should be used.

5. Reference sheet A101: Is the chain link fence around the sprinkler riser a complete enclosure (all 4 sides) or just from wall to wall (2 sided)? The drawing seems to indicate a complete enclosure (4 sides) but it is difficult to tell.

Wall to wall (2 sides), with gate, as shown.

6. Reference sheet A101: Does the chain link fence around the sprinkler riser have an open top or a chain link ceiling?

Open top.

7. Reference sheet CU104 and A101: Are the two (2) bollards shown on CU104 at the new fire hydrant installed per detail 3/A101 (bolt down) or will they be typical fully embedded bollards?

Fully embedded bollards would be preferred, but costs may dictate otherwise.