FA825116R0031_SECTION_M.pdf

PDF 20 KB Posted

Attached to
Advanced Programmable Signal Processor
Solicitation number
FA8251-16-R-0019
Issued by

About this file

Section M

View the file

Other files

File Type Posted
RDL_EDA.PDF PDF
FA825116R0019_______0003.pdf PDF
DATA_ITEM_NO_D001Revised.pdf PDF
PACKAGING_REQUIREMENTS.pdf PDF
FA825116R0019_SECTION_L.pdf PDF
DATA_ITEM_NO_B001.pdf PDF
DATA_ITEM_NO_A001.pdf PDF
PACKAGING_SOW.pdf PDF
FA825116R0019_SECTION_M.pdf PDF
DATA_ITEM_NO_C001.pdf PDF
FA825116R0019_______0002.pdf PDF
DATA_ITEM_NO_E001.pdf PDF
FA825116R0019_______0001.RTF RTF text file
FA825116R0019_SECTION_L.pdf PDF
FA825116R0019_SECTION_M.pdf PDF
1798509_TRNSPDATA_REPORT.pdf PDF
FA825116R0031_SECTION_L.pdf PDF
FA825116R0019_DATA_ITEM_NO_B001.pdf PDF
FA825116R0019.RTF RTF text file
FA825116R0019_PACKAGING_REQUIREMENTS.pdf PDF
FA825116R0019_PWS_06162016.pdf PDF
FA825116R0019_RDL.pdf PDF
FA825116R0019_PACKAGING_SOW.pdf PDF
FA825116R0019_DATA_ITEM_NO_C001.pdf PDF
FA825116R0019_DATA_ITEM_NO_A001.pdf PDF
FA825116R0019_DATA_ITEM_NO_D001Revised.pdf PDF
FA825116R0019_DATA_ITEM_NO_E001.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION M

EVALUATION FACTORS FOR AWARD

A. INTRODUCTION:

This acquisition shall be awarded to the Lowest Price (LP) offeror.

Technical pre-qualification is required to be considered for award of this Government requirement. Technical qualification requirements have not been included in this solicitation.

Contractors that are interested in becoming a technically qualified “Approved Source” for the NSN(s) identified on this solicitation are encouraged to contact the Government representative identified at paragraph A.2. of attachment SECTION_L.pdf to obtain technical qualification instructions.

Technical Capability will not serve as a proposal evaluation factor as technical qualification is a requirement that must be completed prior to the date specified for award of the contract.

Proposals from offerors that are not considered technically qualified “Approved Sources” prior to the date specified for award will not be considered for award. The date specified for award is one week after the RFQ closing date. Per FAR 9.202(e) the Contracting Officer need not delay a proposed award in order to provide a potential offeror with an opportunity to meet the standards specified for qualification.

Past Performance will not serve as a proposal evaluation factor, but will be considered in accordance with a determination of responsibility per FAR 9.1. Contractors that are not determined responsible (IAW FAR 9.103, FAR 9.104-1, and other statutes) will not be selected for award.

By submission of its proposal, the offeror accepts all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements.

If a competitive environment is not achieved the evaluation criteria established in attachment SECTION_M.pdf will be dissolved and the sole offeror will enter into negotiations with the Government.

B. PROPOSAL EVALUATION FACTORS AND PROCEEDURES:

The Government will not evaluate proposals from offerors that are not considered technically qualified “Approved Sources” prior to the date specified for award.

The Government shall evaluate proposals from offerors that are considered technically qualified “Approved Sources” prior to the date specified for award based on the evaluation factors established below:

FACTOR 1: PRICE (Lowest Price)

Price is the only proposal evaluation factor.

The Government will conduct price evaluations on all proposals that are determined responsive to the solicitation requirements.

A contract award will be extended to the offerors that submit proposals with the lowest FACTOR 1: PRICE summed extended price per CLIN over all ordering periods, is responsive to the solicitation requirements, and is determined responsible by the Government (IAW FAR 9.103, FAR 9.104-1, and other statutes).

For instance, based on the example identified in SECTION_L.pdf, if Contractor “A” proposed $10,000.00 for CLIN 1005 and $12,500.00 for CLIN 2005 then Contractor “A’s” evaluation amount for X005 would be $22,500.00. If Contractor “B” proposed $11,000 for CLIN 1005 and $11,000 for CLIN 2005 then Contractor “B’s” evaluation amount for X005 would be $22,000.00 and Contractor “B” would be awarded CLINs 1005 and 2005 assuming Contractor “B” was responsive to the solicitation requirements, and determined responsible by the Government. If a contractor wins X005 then they would be awarded 1005 and 2005 etc. as X005 = the sum of the extended prices of CLINs 1005 and 2005. The individual CLINs (i.e. 1005 and 2005) cannot be awarded to separate contractors.

1. FACTOR 1: PRICE

The following documents will facilitate the evaluation of FACTOR 1: PRICE.

EVALUATION BASE(S):

VOLUME I: PRICE

PRICE SPREADSHEET

(Volume_I_Price_Spreadsheet.xlsx)

VOLUME II: DOCUMENTATION

STANDARD FORM 1447

(Volume_II_Standard_Form_1447.pdf)

File details come from the government source that posted it. Updated .