The file's text, extracted by GovTribe without its formatting.
Appendix E: Acronym Listing
A
| AFGSC |
| Air Force Global Strike Command |
| AFI |
| Air Force Instruction |
| AFMC |
| Air Force Materiel Command |
| AFOSH STD |
| Air Force Occupational Safety and Health Standards |
C
| CCB |
| Configuration Control Board |
| CDR |
| Critical Design Review |
| CDRL |
| Contract Data Requirements List |
| CFSR |
| Contractor Funds Status Report |
| CM |
| Configuration Management |
| CMP |
| Configuration Management Plan |
| CMRS |
| Calibration and Measurement Requirements Summary |
| COTS |
| Commercial Off-The-Shelf |
| CSOW |
| Contractor Statement of Work |
D
| DFARS |
| Defense Federal Acquisition Regulation Supplement |
| DID |
| Data Item Description |
| DMSMS |
| Diminishing Manufacturing Sources and Materiel Shortages |
| DoD |
| Department of Defense |
| DoDI |
| Department of Defense Instruction |
E
| ECP |
| Engineering Change Proposal |
| EDFP |
| Engineering Data For Provisioning |
F
| FAR |
| Federal Acquisition Regulation |
| FCA |
| Functional Configuration Audit |
| FMECA |
| Failure Modes, Effects, and Criticality Analysis |
| FOD |
| Foreign Object Damage |
H
| HASP |
| Health and Safety Plan |
I
| ICBM |
| Intercontinental Ballistic Missile |
| ICBMSD |
| Intercontinental Ballistic Missile System Directorate |
| ICD |
| Interface Control Document |
| IMS |
| Integrated Master Schedule |
| IPMR |
| Integrated Program Management Report |
| IPT |
| Integrated Product Team |
| IUID |
| Item Unique Identification |
L
| LCC |
| Launch Control Center |
| LER |
| Launcher Equipment Room |
| LSA |
| Logistics Support Analysis |
M
| MIL-STD |
| Military Standard |
| MIL-HDBK |
| Military Handbook |
| MMXG |
| Missile Maintenance Group |
| MSS |
| Missile Suspension System |
| MXDEA |
| Engineering Division |
N
| NAS |
| National Aerospace Standard |
| NFPA |
| National Fire Protection Association |
O
| OPSEC |
| Operations Security |
| OSHA |
| Occupational, Safety and Health Act |
P
| PCA |
| Physical Configuration Audit |
| PDR |
| Preliminary Design Review |
| PESHE |
| Programmatic Environment, Safety and Occupational Health Evaluation |
| PMR |
| Program Management Review |
| PRR |
| Production Readiness Review |
| PSI |
| Pounds per Square Inch |
R
| RFN |
| Requests for Nomenclature |
| RTM |
| Requirements Traceability Matrix |
S
| SAR |
| Safety Assessment Report |
| SCN |
| Specification Change Notice |
| SDP |
| Software Development Plan |
| SEMP |
| Systems Engineering Management Plan |
| SFR |
| System Functional Review |
| SITT |
| Shock Isolator Test Tower |
| SPS |
| Software Production Specification |
| SRR |
| System Requirements Review |
| SRS |
| Software Requirements Specifications |
| SSPP |
| System Safety Program Plan |
| SSS |
| System/Subsystem Specifications |
| STD |
| Software Test Description |
T
| TDR |
| Technical Design Reviews |
| TEMP |
| Test and Evaluation Master Plan |
| TEPP |
| Test and Evaluation Program Plan |
| TIM |
| Technical Interchange Meeting |
| TLV |
| Threshold Limit Values |
| TME |
| Test Measurement Equipment |
| TRR |
| Test Readiness Review |
U
| UL |
| Underwriters Laboratories |
| USAF |
| United States Air Force |