Appendix_C_SHOCK_ISOLATOR_TEST_TOWER.doc

DOC document 58 KB Posted

Attached to
Shock Isolator Test Tower (SITT) Federal contract opportunity
Solicitation number
FA8224-16-R-0026
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Safety

View the file

Other files for this federal contract opportunity

Other files attached to Shock Isolator Test Tower (SITT), newest first.
File Type Posted
FA8224-15-R-0026-0002.docx DOCX document
SITT_Preliminary_Design_Concept_-_Dec-2014.docx DOCX document
Testing_Examples.pdf PDF
RFP_QA.docx DOCX document
Preproposal_QA.docx DOCX document
FA8224-16-R-0026.pdf PDF
PROPOSED_CDRL_LIST_SITT_ver_7_(002).docx DOCX document
FA8224-16-R-0026-00001.pdf PDF
Appendix_E_-_Acronyms.doc DOC document
Shock_Isolator_Test_Statement_of_Work_(SOW).docx DOCX document
Complete_CDRL_Package_SITT_13_Apr_16.pdf PDF
SITT_TRD.docx DOCX document
Foundation_and_Footing_Information.pdf PDF
Building_850_Electrical_Panels.pdf PDF
Purchase_Specification_20160303.doc DOC document
Building_850_Shop_Layout.pdf PDF
Shock_Isolator_Test_Statement_of_Work_(SOW).docx DOCX document
Purchase_Specification_20160303.docx DOCX document
SITT_TRD.docx DOCX document
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX C

SAFETY, FIRE PROTECTION AND HEALTH

SPECIFICATION

INDUSTRIAL SAFETY REQUIREMENTS

OGDEN AIR LOGISTICS COMPLEX

UNITED STATES AIR FORCE

HILL AIR FORCE BASE, UTAH 84056

SHOCK ISOLATOR TEST TOWER

DATE 15 Mar 2016 Prepared by:

Tim Helms

OO-ALC/SE

801-586-6038

Control Number: TH160302

SECTION I - GENERAL REQUIREMENTS

A. Safety Program Requirements.

The contractor will implement a safety program plan that ensures protection of Government personnel and property. The program will consist of, as a minimum:

1. Mishap reporting, as defined in paragraph B1 below.

2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II –Specific Requirements, and will be used during the performance of the work described in the contract. The Safety Plan will be accepted by OO-ALC/SE (Safety Office) prior to commencement of any work described in this contract.

3. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.

4. Competent personnel to provide surveillance of the Safety Plan.

5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.

6. All contractor personnel shall be trained and qualified to perform their duties safely.

7. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.

B. Mishap Notification

1. The contractor shall notify OO-ALC/SE (801-586-6038) or the Hill AFB Command Post (801-777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA COR (Contracting Officer's Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to OO-ALC/SE. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.

Mishap notifications shall contain, as a minimum, the following information:

(a) Contract, Contract Number, Name and Title of Person(s) Reporting

(b) Date, Time and exact location of accident/incident

(c) Brief Narrative of accident/incident (Events leading to accident/incident)

(d) Cause of accident/incident, if known

(e) Estimated cost of accident/incident (material and labor to repair/replace)

(f) Nomenclature of equipment and personnel involved in accident/incident

(g) Corrective actions (taken or proposed)

(h) Other pertinent information

2. The contractor shall cooperate with any and all government mishap investigations. Additionally if requested by government personnel or designated government representative (GR), i.e., the ACO, PCO, or DCMA COR, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.

3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.

4. The contractor shall support and comply with the safety investigation and reporting requirements of AFI 91-204, Chapters 1 – 5.

C. General Safety Requirements:

If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Contract Administration Office safety representative.

The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, Air Force Occupational Safety and Health Standards (AFOSH STD), to include AFI 91-203, Air Force Consolidated Occupational Safety Instruction, AFI 91-204, Safety investigations Reports, AFPAM 91-210, Contract Safety, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees. All documents required as a result of OSHA 29 CFR 1910 and 1926 regulations, (i.e. certifications, training, respiratory protection program, workplace hazard assessments), shall be made available to the COR upon request.

The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken.

Hazard Assessment. In accordance with 1910.132(d)(2), the contractor shall conduct a certified Hazard Assessment on all work areas. A follow-on survey shall be conducted by the contractor when the workload or environment conditions change. If respirators are necessary to protect the health of the employee or whenever respirators are required by the contractor, the contractor employer shall establish and implement a written respiratory protection program according to 29CFR 1910.134.

Contractor personnel must receive Explosive Safety Awareness Training if their duties require entry into the Explosive Clear Zone. This training will be provided by the OO-ALC Safety Office. Contact Eric Covington at 586-0168.

A Risk Assessment will be required prior to any work being accomplished, if munitions will remain in the facility.

Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: AFOSH STDs are annotated because many of the Air Force Standards exceed the OSHA standard criteria. If a conflict is noted, the most stringent requirement takes precedence. The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation (FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.

SECTION II – SPECIFIC REQUIREMENTS

The contractor’s prepared Safety Plan shall:

· Demonstrate a management commitment to employee safety and health

· Identify applicable rules and regulations

· Identify the roles and responsibilities of Management, Supervisors, Employees and Safety Coordinator

· Identify work to be performed and location of expected operations

· Provide a description of safety program, safety monitoring responsibilities, organizational structure, and contact information for on-site personnel

· Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures

· Identify employee safety and health training requirements and the documentation process

· Include emergency response plans and procedures that relate to protection of government personnel and property

· Include hazard reporting procedures and identify individual(s) responsible for the correcting identified hazards

· Identify procedures for accident reporting and investigation

· Identify the process for tracking controlled hazards in contractors work area

The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:

PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.

MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, Para 3-4; DODI 6055.4, DoD Traffic Safety Program, 20 Jul 99; AFI 91-207, USAF Traffic Safety Program, 22 May 07; and AFI 91-207 AFMC SUP1, The US Air Force Traffic Safety Program, 1 Oct 07. Each applies to all persons at any time on an Air Force Installation and includes all leased, owned, or privatized property including housing areas. In addition: AFI 13-213, Airfield Management, 29 Jan 08, Paragraphs 1.3.6 and 4.4.2.1 applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on Hill Air Force Base, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.

HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in OSHA Standard 29 CFR 1910.141. CLEAN AS YOU GO will be enforced.

The authorized Government Representative (OO-ALC Safety Office) shall approve the contractor’s procedures within the Health and Safety Plan as meeting the intent of the below referenced standards, with the exception of Mishap Notification / Reporting Procedures, which are outlined in Section I, paragraph B of this Appendix C.

Element/Requirement

Referenced Benchmark

Contract Safety

AFPAM 91-210 Para. 6

Mishap Notification/Reporting

Appendix C, Section I

AFI 91-204 Para. 4.9

Facility Fire Protection

NFPA 13, 70, & 72

NFPA 409/410

AFI 91-203 Chapters 6, 22

Handling, Storage and use of Flammable/

NFPA 30, 33

Combustible Liquids

AFI 91-203 Chapters 6, 22

Hazardous Material Management

AFI 32-7086 HAFBSUP 1

Personal Protective Equipment

AFI 91-203 Chapter 14

Materials Handling Equipment

AFI 91-203 Chapter 35

Storage and Materials Handling

DoDI 4140.62

DoDI 41

PAGE

Date: 29 July 2014

File details come from the government source that posted it. Updated .