CDRL Package BGG Cartridge Repair 10 Aug 20 - signed.pdf

PDF 812 KB Posted

Attached to
BGG Cartridge Repair
Solicitation number
FA821420R7006
Issued by

About this file

This is a solicitation for the repair of 104 Ballistic Gas Generators to convert them from an older version to the latest version. The work consists of repairing unserviceable BGGs to a serviceable condition. The government intends to award this contract on a sole source basis to Nammo Talley. Foreign participation is prohibited at the prime contractor level. Technical information provided could contain classified or export-controlled data. Certain documents require a DD2345 form to view. Performance dates listed are estimates and will adjust upon award.

View the file

Other files

File Type Posted
Updated Provisions_Clauses.docx DOCX document
BGG Cartridge Repair SOO RFP.pdf PDF
FA821420R7006.pdf PDF
GRID TEMPLATE.docx DOCX document
CDRL Package BGG Cartridge Repair 2 Jul 20 - signed.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Data Requirements List (CDRL) Program: Ballisti Gas Generator (BGG) Cartridge Repair Date: 10 August 2020 Version: 1

1. Introduction This document was developed in accordance with DOD MIL-STD 31000A and represents the general requirements for the Technical Data Package (TDP) for this program. The purpose of this Attachment, Technical Data Package, is to define the data deliverables due for this program, including the instructions for their development, and delivery. All specific delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.

2. General Guidelines The CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the Government, as well as the frequency and approval requirements. The Data Item Descriptions (DID), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization Information System (ASSIST) and provide additional direction for data preparation.

3. Communications Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NMED) and the cognizant program manager (PM). Copies of all forms & templates noted in this file are available as requested from your program manager, the DMO or your PCO.

4. Codes used in the DD Form 1423 The directions for submittal and approval of data is indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15 or 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.

4.1 Block 7, DD Form 250 Requirements

Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and “Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements.

Information copies of DD Form 250 to accompany each letter of transmittal for this category of data.

Code Inspection Acceptance SS Source (DD Form 250 or equivalent document) Source (DD Form 250 or equivalent document)

DD Destination (DD Form 250 or equivalent document)

Destination (DD Form 250 or equivalent document)

SD Source (DD Form 250 or equivalent document)

Destination (DD Form 250 or equivalent document)

DS Destination (DD Form 250 or equivalent document)

Source (DD Form 250 or equivalent document)

Code Inspection LT Letter of Transmittal only NO No inspection or acceptance required

XX Inspection and acceptance requirements specified elsewhere in contract S Indicates the contractor’s facility D Indicates the primary destination point

4.2 Block 8, Approval Code

When document approval is required (code “A”), the approval authority (ORG) for that 1423 is designated with an (A). Approval coordination shall be done using the Contract Document Action Form (CDA). When document approval is not required (code “N/A”), no approval of the CDRL is required (note that documents that do not require approval shall also be marked as “NO” or “LT” in block 7.

Code Description A Approval Required N/A Approval Not Required

4.3 Block 10, Frequency of Submittals

Code Description DAILY Daily WEKLY Weekly BI-WE Each 2 weeks MTHLY Monthly BI-MO Each 2 months QRTLY Quarterly ANNLY Annually SEMIA Each 6 months OTIME One time ONE/R One time and revisions R/ASR Revisions as required ASGEN As generated ASREQ As required* DFDEL Deferred delivery DFORD Deferred ordering DFREQ Deferred requisitioning ONE/P One time preliminary draft XTIME Multiple separate submittals (i.e., 2Time, 3Time)

* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.

4.4 Block 12 and 13, Dates of Initial and Subsequent Submissions

Code Description ATP Authority To Proceed ASGEN As generated ASREQ As required* CDR Critical Design Review CA Contract Award CO Change Order CD Calendar Day(s)

CP/REQ Change page/as required CP/O Change page/(only) DCARC Defense Cost and Research Center DFDEL Deferred delivery FQT Formal Qualification Test FCA Functional Configuration Audit PCA Physical Configuration Audit TRR Test Readiness Review SA Supplemental Agreement WD Working Day(s)

* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.

5. Supplemental Data Preparation Instructions

5.1 Data Item Description (DID) Version

The most current version of the DID at the time of the award of the contract or Task Order, whichever date is most current, specified in Block 4, is to be used when submitting data. The most current version can be found at http://quicksearch.dla.mil/.

5.2 DID Tailoring

The DID is a specification for the preparation of data. DID tailoring is reflected in Block 16 of the CDRL form. “T” entered after the DID number in Block 4, means that the DID has been tailored. Block 4 tailoring is made to either relax preparation instructions or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW), Performance Work Statement (PWS) or Statement of Objectives (SOO).

5.3 Distribution Statement Marking

The designation in Block 9 of the CDRL form indicates that one of the following six (6) authorized distribution statements from Department of Defense Instruction (DoDI) 5230.24 and Air Force Instruction (AFI) 61-201 shall be annotated on that technical data. Distribution statements will be selected to denote the audience the data is intended for: A distribution statement marking is distinct from and in addition to a security classification marking assigned in accordance with (IAW) DoD 5200.1 Volume 2. Should Block 9 of the CDRL form and the DID be in conflict, Block 9 of the CDRL form shall take precedence. The following distribution statements are authorized for use in marking technical documents:

Distribution Statement A:

Approved for public release. Distribution is unlimited.

Distribution Statement B:

Distribution authorized to U.S. Government Agencies for Administrative or Operational Use (date of determination). Other requests for this document shall be referred to AFNWC/NME.

Distribution Statement C:

Distribution authorized to U.S. Government Agencies and their contractors (fill in reason) (date of determination). Other requests for this document shall be referred to AFNWC/NME.

Distribution Statement D:

Distribution authorized to Department of Defense and U.S. DoD contractors only for Administrative or Operational Use and Export Control (date of determination). Other requests shall be referred to

AFNWC/NME.

http://quicksearch.dla.mil/

Distribution Statement E:

Distribution authorized to DoD Components only for Test and Evaluation (date determination).

Other requests shall be referred to AFNWC/NME.

Distribution Statement F:

Further dissemination only as directed by

AFNWC/NME.

5.4 Other Notices

All technical documents marked with Distribution Statements B, C, D, E, or F will also be marked with the following notices:

WARNING:

This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Add the following statement to the bottom of every page of the report except the SF 298, Report Documentation Page: “WARNING: EXPORT CONTROLLED.”

NOTE: The CDO Program Manager (PM) may remove the “Export Control Warning” if “critical technology” is not a reason annotated in the distribution statement and if the CDO PM can verify the technical report/document is not export control.

Destruction Notice:

Documents designated as Distribution B, C, D, E, or F shall be marked with one of the following statements:

For classified documents:

DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, DoDM 5200.01-V3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17 or AFI 16-1404, Air Force Information Security Program, para 5.2.5.

For unclassified, limited documents:

DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

5.5 Pricing CDRL Items Separately

If blocks 17 and 18 of the DD form 1423 documents are marked as "N/A" and "NSP" respectively, then the Government does not want to separately group or price CDRL items. If blocks 17 and 18 are left blank, the Government intends to seek separate pricing for the development costs of each CDRL. This pricing is for development costs of the data items and is considered separate from data rights costs.

6. Supplemental Data Delivery Instructions

6.1 Due Dates

Due dates for delivery of data are to be construed as receipt at destination. Due dates are based on calendar days unless otherwise noted. If due date falls on a non-business day, i.e. weekend or holiday, due date is pushed to the next business day.

6.2 Late Delivery

Delivery of data is considered late if it does not arrive at its destination by 1530 hours (3:30 PM) Mountain Time on the date specified in Blocks 12, 13 or 16 of the CDRL.

6.3 Submittal Procedures

6.3.1 CDRL Submittal Procedure

For the purposes of data submittal, unclassified CDRLs are submitted to the government via TopVue https://icbm.topvue.com/topvue-icbm/. For access to CDRLVue, the contractors must obtain and maintain T-1 eligibility, National Agency Check with Inquiries (NACI).

THIS IS FOR UNCLASSIFIED CDRL SUBMITTALS ONLY.

(See below for Classified CDRL submittals (6.3.2)) Each data submittal shall be accompanied by a Contract Document Action (CDA) form (please request current version from ORG1). If for any reason a CDA form is not available, a cover letter shall contain the following information:

1. Contract number

2. CDRL sequence number (i.e., A001)

3. Exact title and subtitle (if applicable) of the document being transmitted

4. Line item or CLIN number

5. Modification Number or Order Number

4. Document date, number, and revision information (if applicable)

5. Data delivery method and date of delivery

6. Whether the document is a draft, or final submittal

7. For approval data: State “For Approval”

8. If the document is a re-submittal, reference the Government letter Contractual Document Action (CDA) requesting re-submittal or disapproval of previous submittal

9. For periodic reports: The report period that the document covers

10. Distribution: Information disclosing the total contractual distribution being made per Block 14, or Block 16 of the CDRL Form

6.3.2 Classified CDRL Submittal Procedure

If any deliverables contain classified information, contractors must obtain and maintain T-3 eligibility, National Agency Check with Law and Credit (NACLC). Classified CDRLs and classified documentation are submitted in accordance with this instruction and are never to be emailed.* Classified CDRLs or portions of a CDRL, as applicable, shall be forwarded IAW Appendix B of the DD254 and DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). For Classified Disks send two (2) copies.

Outer Envelope:

Address ATTN: AFNWC/NIOS ICBM Security Office

Inner Envelope:

Address ATTN: Name of person for whom the document should be delivered

*A letter of delivery shall be submitted to TopVue https://icbm.topvue.com/topvue-icbm/, when classified data is delivered via the instructions above.

https://icbm.topvue.com/topvue-icbm/

7. Supplemental Data Review and Approval Process

7.1 Approval CDRLs

The letter “A” in Block 8 of the DD Form 1423 indicates that the Government must approve the data item. In addition, Block 16 of the form may contain additional directions.

Written Approval

Written approval indicates agreement or concurrence with the contractor furnished data only and shall not be construed as changing any of the terms or conditions of the subject contract. The approval authority shall be ORG 1 as outlined in section 9 of this document. Approval shall take the form of either a letter signed by the PCO/DMO or concurrence using the Contractual Document Action (CDA) form, signed and dated by the representative stated in ORG 1. Data items submitted for approvals are NOT automatically approved without government approval.

Approved with Comment or Disapproved

The Contractor shall revise data items Approved with Comments or Disapproved in accordance with the specific written comments transmitted with the CDA or PCO/DMO letter and resubmit not later than 30 calendar days (unless otherwise directed) from receipt of the Approval with Comments or Disapproval, unless otherwise directed. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.

Draft Versions of the CDRL

If a DD Form 1423 directs the Contractor to submit a “draft” version of an approval CDRL in advance of the final version, the draft will be considered an information only submission. However, the PCO/DMO still retains the right to disapprove a draft data item that does not comply with the contract requirements. Unless otherwise directed by the PCO, the Contractor shall incorporate the Government’s comments in the final submission and shall not resubmit the draft version of the data item.

7.2 Contractual Document Action (CDA)

After the Government receives a data item submission, a Temporary Data Identification Number (TDID), a unique identifier to that submission, will be assigned by the DMO. The Government’s review of that data item will result in a coordinated CDA form, or PCO letter, indicating the data items approval or disapproval. Should the Government have comments on the data item; the CDA will include either comments on the CDA form itself or a Comment Resolution Matrix (CRM). Comments will be provided to the submitter in accordance with the format and timeline noted in block 16. Comments will be assigned one of the following codes:

COMMENT CODE CODE DESCRIPTION

C Critical Comments of a very serious nature that will preclude final approval and publication of the document. You are willing to elevate the comment or issue to senior organization leadership (e.g., general officer) and recommend they non-concur. These are the "show-stoppers". Convincing rationale for critical comments must be provided. The individual making the comment and the document writer will reconcile the comment.

S Substantive Comments of a less serious nature that have noticeable impact on the documents quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections.

A Administrative Comments that address minor items such as typographical, format and/or grammatical errors.

7.3 Information Only CDRLs

When an “A” is not indicated in Block 8 of the DD Form 1423, the PCO/DMO still retains the right to disapprove any data that does not comply with contract requirements. The Contractor shall revise the disapproved data item in accordance with the specific written comments transmitted with the CDA form or PCO letter and resubmit not later than 30 calendar days, unless otherwise directed, from receipt of the disapproval. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.

8. Data Accession List (DAL) During performance of the contract, requests from the PCO for data ordered from the Data Accession List (DAL) (with the application of DID DI-MGMT-81453A) shall be provided at no increase in contract price. Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such request can be filled at no increase in contract price.

9. Organizational Cross Reference List The following Organizational Cross Reference List shall be used in conjunction with the CDRLs to determine actual addressees for distribution of data. The ORG number will be entered in lieu of an address on the CDRL and will be a part of the CDRL package. Changes to the list will be identified by an asterisk next to the ORG number and a revision date to the list.

ORG#/ Name Address Attention/To Contact Info ORG1/AFNWC/NMSP 6014 Dogwood Ave Bldg 1258

Hill AFB UT 84056 Rachel Adams rachel.adams.6@us.af.mil

ORG2/AFNWC/NMSP 6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056

PM nathan.whipple@us.af.mil

ORG3/AFNWC/NI N/A

ORG4/AFNWC/NMED 6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056 CM afnwc.nies.icbm.conm@us.af.mil

ORG5/AFNWC/NMED N/A

ORG6/AFNWC/NMED N/A

ORG7/AFNWC/NMES N/A

ORG8/AFNWC/NMED N/A

ORG9/AFNWC/NMES 6014 Dogwood Ave Bldg 1258

Hill AFB UT 84056 Safety afnwc.niev.safetymanager@us.af.mil

ORG10/AFNWC/NMES N/A

ORG11/AFNWC/NMES N/A

ORG12/AFNWC/NMES N/A

ORG13/AFNWC/NMES N/A

ORG14/AFNWC/NMED N/A

ORG15/AFNWC/NIA N/A

ORG16/AFNWC/NIA N/A

ORG17/AFNWC/NMES N/A

ORG18/AFNWC/NIA N/A

ORG19/AFNWC/NMES 6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056 NHS afnwc.niei.emirequests@us.af.mil

ORG20/AFNWC/NIA N/A

ORG21/AFNWC/NM 6014 Dogwood Ave Bldg 1258

Hill AFB UT 84056 TE afnwc.nia.testandevaluation@us.af.mil

ORG22/AFNWC/NITA N/A

ORG23/AFNWC/NIASF N/A

mailto:rachel.adams.6@us.af.mil mailto:nathan.whipple@us.af.mil mailto:afnwc.nies.icbm.conm@us.af.mil mailto:afnwc.niev.safetymanager@us.af.mil mailto:afnwc.niei.emirequests@us.af.mil mailto:afnwc.nia.testandevaluation@us.af.mil

ORG24/AFGSC/A31 N/A

ORG25/AFNWC/NILA N/A

ORG26/406 SCMS/GULAB N/A

ORG27/406 SCMS/GULAA N/A

ORG28/419 SCMS/GUBA 6051 Gum Ln Bldg 1226

Hill AFB UT 84056

CAV AF

ORG29/75 ABW/SE 7290 8th St Bldg 383 Hill AFB UT 84056

Base Safety

75abw.se.workflow@us.af.mil

ORG30/DCMA/ACO N/A

ORG31/AFNWC/NMES FM N/A

ORG32/AFNWC/PZBB 6008 Wardleigh Rd Bldg 1580

Hill AFB UT 84056 Blake Davis blake.davis.1@us.af.mil

ORG33/AFNWC/NMED 6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056

Data Management afnwc.nies.datamgmtoffice@us.af.mil

ORG34/AFNWC/NMES/SI

V

6014 Dogwood Ave Bldg 1258 Hill AFB UT 84056

SIV afnwc.nie.siv@us.af.mil

ORG35/AFNWC/AEDC N/A

ORG36/AFNWC/NIA PEG N/A

10. CDRL Master Listing Index Full 1423’s for CDRL’s applicable to this program are included in section 11 of this document.

CDRL # DID TITLE DID #

A001 Integrated Program Management Data Analysis Report (IPMDAR) DI-MGMT-81861B/T A002 Conference Agenda (Meeting Agenda) DI-ADMN-81249B A003 Briefing Material DI-MGMT-81605 A004 Report, Record of Meeting/Minutes DI-ADMN-81505 A005 Statement of Work (SOW) DI-MGMT-81606 A015 Quality Assurance Program Plan DI-QCIC-81794A A026 Status Report DI-MGMT-80368A A027 Product Engineering Design Data and Associated Lists DI-SESS-81000F/T A030 Specification Change Notice (SCN) DI-SESS-80643E A031 Engineering Change Proposal (ECP) DI-SESS-80639E A037 Request for Variance (RFV) DI-SESS-80640E A062 Test/Inspection Report DI-NDTI-80809B A063 Acceptance Test Plan (ATP) DI-QCIC-80553A A064 Acceptance Test Report (ATR) DI-QCIC-81891 A071 Accident/Incident Report DI-SAFT-81563 A113 Repairable Item Inspection Report DI-PSSS-80386A A114 Ammunition Data Card DI-MISC-80043B mailto:75abw.se.workflow@us.af.mil mailto:blake.davis.1@us.af.mil mailto:afnwc.nies.datamgmtoffice@us.af.mil mailto:afnwc.nie.siv@us.af.mil

11. DD Form 1423s (full 1423’s) *1423’s, block A Reference Number: CLIN number to be added at time of award **1423’s block E Reference Number: Contract and Mod/TO number to be added at time of award

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

BALLISTIC GAS GENERATOR

(BGG) CARTRIDGE REPAIR

F2DCAH0128A101

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001

INTEGRATED PROGRAM MANAGEMENT

DATA AND ANALYSIS REPORT (IPMDAR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81861B/T SOO Para 2.3 AFNWC/NMSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION 14. DISTRIBUTION

LT MTHLY SEE BLK 16 b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

N/A SEE BLK 16 SEE BLK 16

Reg

Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Initial Submittal:

Contractor shall submit initial Integrated Program Management Data and Analysis Report (IPMDAR) Schedule Performance Dataset (SPD) and native schedule as part of the Proposal.

Subsequent Submittals:

Contractor shall submit the first subsequent IPMDAR SPD and native shcedule, NLT the 5th business day after the end of the first full accounting period after Contract Award. All subsequent submittals shall be submitted NLT the 5th business day of each month thereafter.

BLOCK 14:

For unclassified deliverables, contractor shall submit IPMDAR to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit IPMDAR via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.

ORG1 (Lt of delivery only)

ORG2 (Lt of delivery only)

ORG32 (Lt of delivery only)

ORG33 (Lt of delivery only)

15. TOTAL

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

8/10/2020

X Nancy N. Baker Nancy N. Baker, GS-12 Data Manager Signed by: BAKER.NANCY.N.1239591376

See digital signature

8/10/2020

X Rachel E. Adams Rachel E. Adams, GS-12 Program Manager Signed by: ADAMS.RACHEL.ELIZABETH.1168242456

DD Form 1423-1, FEB 2001 Page___1__of__2_ Page

LM 20-14

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A002 CONFERENCE AGENDA Meeting Agenda

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-ADMN-81249B SOO Para 2.2 AFNWC/NMSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

LT ASREQ N/A b. COPIES

a. ADDRESSEE

Draft Final

N/A N/A N/A

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Conference Agenda (Meeting Agenda), if applicable, NLT 5 days prior to scheduled meetings or meetings deemed necessary by the Government. Government will be allowed 2 days, after receipt from contractor, to review for comments.

Contractor shall submit revised Meeting Agenda incorporating Government comments, if applicable, NLT 2 days after receipt from Government.

BLOCK 14: For unclassified deliverables, contractor shall submit Meeting Agenda to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit Meeting Agenda via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.

8/10/2020

X Nancy N. Baker Nancy N. Baker, GS-12

8/10/2020

X Rachel E. Adams Rachel E. Adams, GS-12

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A003 BRIEFING MATERIALS

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81605 SOO Para 2.2 AFNWC/NMSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

LT ASREQ SEE BLK 16 b. COPIES

a. ADDRESSEE

Draft Final

N/A N/A N/A

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Briefing Materials NLT 5 days prior to each scheduled meeting and/or any other meeting deemed necessary by the Government and as requested by the Government. Government will be allowed 2 days, after receipt from contractor, to review for comments.

Contractor shall present corrected Briefing Materials incorporating Government comments, if applicable, NLT 2 days after receipt from Government.

BLOCK 14:

For unclassified deliverables, contractor shall submit Briefing Materials to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit Briefing Materials via instructions (see

8/10/2020

X Nancy N. Baker Nancy N. Baker, GS-12

8/10/2020

X Rachel E. Adams Rachel E. Adams, GS-12

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A004

REPORT, RECORD OF MEETING/MINUTES

Meeting Minutes

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ADMN-81505 SOO Para 2.2 AFNWC/NMSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

a. ADDRESSEE

Draft Final

N/A N/A SEE BLK 16

distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Report, Record of Meeting Minutes (Meeting Minutes) NLT 5 days after meeting or event has been held.

Government will be allowed 5 days, after receipt from contractor, to review for comments. Contractor shall submit revised Meeting Minutes incorporating Government comments, if applicable, NLT 2 days after receipt from Government.

BLOCK 14: For unclassified deliverables, contractor shall submit Meeting Minutes to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit Report, Record of Meeting Minutes (Meeting Minutes) via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.

8/10/2020

X Nancy N. Baker Nancy N. Baker, GS-12

8/10/2020

X Rachel E. Adams Rachel E. Adams, GS-12

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A005 STATEMENT OF WORK (SOW)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81606 SOO Para 2.4 AFNWC/NMSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

LT R/ASR SEE BLK 16 b. COPIES

a. ADDRESSEE

Draft Final

A SEE BLK 16 SEE BLK 16

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Statement of Work (SOW) as part of the Proposal. Government will be allowed 5 days after receipt from contractor to review for approval/disapproval/comments. Contractor shall resubmit corrected SOW incorporating Government comments, if applicable, NLT 5 days after receipt from Government.

BLOCK 14: For unclassified deliverables, contractor shall submit SOW to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit SOW via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.

8/10/2020

X Nancy N. Baker Nancy N. Baker, GS-12

8/10/2020

X Rachel E. Adams Rachel E. Adams, GS-12

DD Form 1423-1, FEB 2001 Page___1__of___1__Pages

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A015 QUALITY ASSURANCE PROGRAM PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-QCIC-81794A SOO Para 3.1 AFNWC/NMSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

LT ONE/R SEE BLK 16 b. COPIES

a. ADDRESSEE

Draft Final distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit initial Quality Assurance Program Plan NLT 30 days after contract award. Government will be allowed 10 days after receipt from contractor to review for approval/disapproval/ comments. Contractor shall resubmit corrected Quality Assurance Program Plan incorporating Government comments, if applicable, NLT 10 days after receipt from Government.

BLOCK 14: For unclassified deliverables, contractor shall submit Quality Assurance Program Plan to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit Quality Assurance Program Plan via instructions (see paragraph 6.3.2), and a letter of delivery to TopVue.

NOTE: Quality Assurance Program Plan shall be submitted IAW

AS 9100.

ORG2 (Lt of delivery 0nly)

8/10/2020

X Nancy N. Baker Nancy N. Baker, GS-12

8/10/2020

X Rachel E. Adams Rachel E. Adams, GS-12

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A026 STATUS REPORT

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-80368A SOO Para 1.6 AFNWC/NMSP

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

LT MTHLY SEE BLK 16 b. COPIES

a. ADDRESSEE

Draft Final

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Initial Submittal:

Contractor shall submit initial Status Report the 5th day of the month following the first complete month of the contract. Contractor will work with Government on desired template.

Subsequent Submittals:

Contractor shall submit subsequent Status Report the 5th day of each month thereafter for the duration of the contract.

Government will be allowed 5 days, after receipt from contractor, to review for comments. Contractor shall submit revised Status Report incorporating Government comments, if applicable, NLT 5days after receipt from Government.

BLOCK 14: For unclassified deliverables, contractor shall submit Status Report to TopVue https://icbm.topvue.com/topvue-icbm/ as per instructions (see paragraph 6.3.1). For classified deliverables, contractor shall submit Status Report via instructions (see paragraph

15. TOTAL 1

8/10/2020

X Nancy N. Baker Nancy N. Baker, GS-12

8/10/2020

X Rachel E. Adams Rachel E. Adams, GS-12

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A027

PRODUCT ENGINEERING DESIGN DATA AND

ASSOCIATED LIST

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81000F/T SOO Para 1.4, 1.5 AFNWC/NMED

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

LT SEE BLK 16 SEE BLK 16 b. COPIES

a. ADDRESSEE

Draft Final distribution statement, warning, and destruction notices)

ORG4 (Lt of delivery only)

8/10/2020

X Nancy N. Baker Nancy N. Baker, GS-12

8/10/2020

X Rachel E. Adams Rachel E. Adams, GS-12

DD Form 1423-1, FEB 2001 Page___1__of__4_ Page

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP X TM OTHER _____ ____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued): CDRL A027 Continued.

1. Reference documents. The applicable issue of any documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract. This CDRL is applicable to both software and hardware drawings.

2. Distribution Statement. Distribution statement, export control statement (if applicable), and Destruction Notice shall be IAW DoDD 5230.24. The following Distribution Statement shall be used for all data.

Distribution Statement D: Distribution authorized to DoD and U.S. DoD contractors only for administrative and operational use, determined (date of determination)*. Other requests for this document shall be referred to ICBM Systems Directorate, Hill AFB, UT 84056.

WARNING:

This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Add the following statement to the bottom of every page of the report except the SF 298, Report Documentation Page: “WARNING: EXPORT CONTROLLED.”

NOTE: The CDO Program Manager (PM) may remove the “Export Control Warning” if “critical technology” is not a reason annotated in the distribution statement and if the CDO PM can verify the technical report/document is not export control.

Destruction Notice:

Documents designated as Distribution B, C, D, E, or F shall be marked with one of the following statements:

For classified documents:

DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, DoDM 5200.01-V3, DoD Information Security Program:

Protection of Classified Information, Enclosure 3, paragraph 17 or AFI 16-1404, Air Force Information Security Program, para 5.2.5.

For unclassified, limited documents:

DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

*NOTE: Date of determination is the date the distribution statement is added to the document.

3. Drawing Baseline. Contractor shall maintain drawing baseline configuration for both software and hardware (current through completion of contract). Existing Drawings and Associated Lists that are updated by this effort shall also be updated to include the applicable Distribution Statement, Export Control Statement (if applicable) and Destruction Notice.

4. Engineering Changes to Air Force Drawings.

a. Contractor shall document changes to existing Air Force Drawings using AFMC Forms 3925, 3926, and 3927 (Engineering Order Forms). Final approval and release of engineering orders shall be a function of the U.S. Government.

b. Delivery of Engineering Orders – Contractor shall submit DRAFT engineering order forms to the Government as they occur. The Government requires 15 working days for review and approval. Contractor shall incorporate comments and provide corrected copies within 10 working days of receipt. Draft delivery shall be in PDF format.

c. Instructions for completing engineering orders (AFMC Forms 3925, 3926, & 3927) can be found on the form.

DD Form 1423-1, FEB 2001 Page___2__of___4__Page

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

5. Control Drawings. Contractor shall prepare control drawings for commercial or vendor items IAW ASME Y14.24M.

6. New drawings. For newly created Drawings and Associated Lists, DI-SESS-81000D/T and Technical Data Package Option Selection Worksheet (defined in MIL-STD-31000) are applicable. Tailoring to DID shall be per TDP Option Selection Worksheet (Atch 1).

All newly created Drawings and Associated Lists shall be IAW the following tailored documents: ASME Y14.100 (including Appendices B, C, D, E), AMSE Y14.3M, ASME Y14.5M, and ASME Y14.35M.

Tailoring to these documents as indicated on this DD form 1423. The following documents are used in whole:

ASME Y14.1, ASME Y14.2M, ASME Y14.24, ASME Y14.34M, ASME Y14.38 and ASME Y14.38a

ADDENDA.

7. Existing Drawings. Existing Drawings and Associated Lists shall be updated IAW the drawing standards in which they were originally prepared.

8. Tailoring to ASME documents:

ASME Y14.100

(1) (Application Data) para 4.6 – Application Data is required on first sheet of Drawing and Associated List.

General use or multi-use notations is allowed.

(2) (Drawing Notes) para 4.27 – Drawing Notes shall be on first sheet of drawing.

ASME Y14.35M

(1) (Redrawn Drawings) – shall be IAW para 4.3, sub-para 4.3.2

(2) (Revision Column) – shall be IAW para 6, sub-para 6.1.2, 6.1.3(d), 6.1.7(c).

Contractor shall maintain revision history in its entirety.

(3) (Revision Letters) – Shall be IAW para 7.2, sub-para 7.2.1(a), (b), (c).

(4) (Revision History Block) – shall be IAW para 7.2.2(a), (b).

(5) (Revision Status of Sheets Block) – shall be IAW para 7.4, sub-para 7.4.2(a), (b), (c).

(6) (Adding Sheets) – shall be IAW para 7.5, sub-para 7.5.1(a)

(7) (Deleting Sheets) – shall be IAW para 7.5, sub-para 7.5.2(b)

ASME Y14.5M

(Dimensioning and Tolerancing) – shall be IAW para 1.6.2 and shall be decimal inch.

ASME Y14.3M

(Angle of Projection) – shall be IAW para 1.6.1 (Third Angle Projection)

ASME Y14.100 INVOKED APPENDICES

Appendix B – Noncommercial Drawing Practices Appendix B – for para B5 see TDP Option Selection Worksheet Appendix C – Drawing Titles Appendix D – Numbering, Coding, and Identification Appendix E – Makings on Engineering Drawings Appendix E – for para E7 see DD1423 Block 16

DD Form 1423-1, FEB 2001 Page___3__of___4__Page

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

9. Metadata Requirements

A metadata file shall accompany each Drawing and Associated List submittal. Not all fields in the Metadata are filled in or used. Only the fields that are required to have inputs have been filled in. The other fields shall be left blank. Columns may be hidden, but no columns shall be deleted from the database nor shall extra columns be added. AFNWC/NMED will provide column-by-column instructions for completion of the metadata (Atch 3).

Metadata input must be in ALL CAPS with the exception of the file extension (File Ext) field. The File Extension listed in this field must match the file extension of the image file (upper/lower case).

AFNWC/NMED will provide a sample metadata file as an attachment to this CDRL package (Atch 2). The attached sample metadata file and database is in Excel. Contractor shall submit a metadata sample in Excel on CD ROM to AFNWC/NMED 90 working days after contract award The Government requires 20 working days for inspection and acceptance of sample files.

10. Drawing deliveries:

Draft/preliminary drawings shall be delivered 30 working days prior to the Preliminary Design Review (or equivalent), Critical Design Review (or equivalent) and Physical Configuration Audit in PDF format on CD ROM. The Government shall provide comments to the drawings 10 working days prior to each review/audit.

Agreed to comments shall be incorporated into the drawing prior to the next review/audit.

J-size drawings (if applicable) shall be split into frames and submitted as E-size sheets.

Final Delivery: Delivery of the final drawing package and final metadata file shall be made 30 working days after closeout of the physical configuration audit. Final delivery for Drawings and Associated Lists shall be in the format(s) specified on the TDP and shall be delivered on CD ROM. Drawings can be submitted as a single file for each drawing (multiple sheets per file) or as a single file for each sheet. Associated lists (specs, PLs, AL, WLs, etc) may be submitted as A-size sheets provided all information and boarders for each sheet of the document are formatted to print within an 8 ½ X 11 sheet of paper. If any sheet of the document runs over to another page the file cannot be accepted. Associated Lists shall be submitted as one file for the complete document. Final delivery media for metadata shall be in Excel on the same CD ROM as the drawings. CD ROM label shall be marked with the following information: date, contract #, company name, company CAGE, nomenclature(s) of top assembly being submitted.

Contractor shall submit a letter of delivery to TopVue https://icbm.topvue.com/topvue-icbm/

11. Shipping List – A shipping list shall be provided with each shipment of engineering data delivery.

Shipping list shall identify each document being furnished in the TDP in alphanumeric order. Media shall be in paper copy to AFNWC/NMED.

3 Attachments

1. TDP Selection Worksheet

2. Metadata file

3. Metadata column-by-column instructions

DD Form 1423-1, FEB 2001 Page___4__of___4__Page

MIL-DTL-31000B

TDP OPTION SELECTION WORKSHEET

P R O D U C T D R A W I N G S A N D A S S O C I A T E D L I S T S

A. CONTRACT NO.

B. EXHIBIT/ATTACHMENT NO.

C. CLIN

D. CDRL DATA ITEM NO.

A027

1. DELIVERABLE PRODUCT (X and complete as applicable.)

X

a. ORIGINALS (Specify current design activity's full size reproducible drawing or digital data file(s) on which is kept the revision record recognized as official) (Identify specification, type, grade and class, etc.)

b. REPRODUCTIONS (Identify specifications, type, grade and class, etc., and quantity of each)

X

c. DIGITAL DATA (Identify specification, exchange media, etc. and specify original (master) or copy) Drawings and Associated Lists shall be delivered in PDF format on CD ROM. Metadata shall be delivered in EXCEL on CD ROM.

2. CAGE CODE AND DOCUMENT NUMBERS (X one)

X a. CONTRACTOR

b. GOVERNMENT Complete (1) and (2) or (3)

(1) Use CAGE Code 98747

(2) Use Document Numbers

(3) To Be Assigned By:

AFNWC/NMED (Configuration Mgr)

3. DRAWING FORMATS AND DRAWING FORMS (X one and complete as applicable)

X a. CONTRACTOR FORMATS. Forms to be supplied by contractor. See DD1423 Blk 16

b. GOVERNMENT FORMATS. Forms to be supplied by contractor.

Samples supplied by (Specify)

c. GOVERNMENT FORMATS. Forms to be supplied as Government Furnished Material by (Specify)

4. TYPES OF DRAWINGS SELECTION (X one)

X a. CONTRACTOR SELECTS b. GOVERNMENT SELECTS (Specify in Item 9)

5. ASSOCIATED LISTS (X and complete as applicable) X a. PARTS LISTS (X one) (1) Integral X (2) Separate X b. DATA LISTS (X one) (1) Not Required X (2) Required (Specify levels of assembly) ALL ASSY LEVELS

c. INDEX LISTS (X one) (1) Not Required (2) Required (Specify levels of assembly)

d. WIRING LISTS (X one) (1) Not Required X (2) Required (Specify levels of assembly)

e. INDENTURED DATA LISTS (X one) (1) Not Required X (2) Required (Specify levels of assembly)

X f. APPLICATION LISTS (X one) (1) Not Required X (2) Required (Specify levels of assembly) SEE BLK 9

6. DETAILS (X one)

X a. MULTIDETAIL DRAWINGS PERMITTED b. MONODETAIL DRAWINGS MANDATORY

7. VENDOR SUBSTANTIATION DATA (X one)

X a. NOT REQUIRED b. REQUIRED

8. APPLICABILITY OF STANDARDS. The following Standards apply: (X as applicable)

X

a. ASME Y14.100-2000, ENGINEERING

DRAWING PRACTICES

(COMMERCIAL)

B. X b. ASME Y14.100, WITH APPENDICES

B, C, D, E

B, C, D, and E

X

c. ASME Y14.34M, ASSOCIATED LISTS

d. EXISTING STANDARDS

DO NOT APPLY

C. X

D. X

E. X

9. OTHER TAILORING (Attach additional sheets as necessary) 5 (F) Application List shall be on the first sheet of each Drawing and Associated List

Atch 1 Atch 1

Worksheet – Product Drawings and Associated List

Atch 2 Metadata Spreadsheet

METADATA FILE

2014.xls

Atch 3 METADATA spreadsheet column-by-column description

NOTE: DO NOT ADD OR REMOVE COLUMNS

Column Header name Required

Field Max # char’

Description

A Row Format Yes 10 Value…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .