QALI_MG47_MG48.pdf

PDF 108 KB Posted

Attached to
Initiator Federal contract opportunity
Solicitation number
FA821320R3031
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a quality assurance letter of instruction and related federal contract opportunity solicitation. The quality assurance letter outlines inspection requirements for a contractor producing critical flight items under contract, including mandatory stamping and signatures on documentation, witnessing of testing by government inspectors, and verification of leak testing, x-rays, lot acceptance testing, and other quality control procedures. The related federal contract opportunity solicitation seeks offers for various ballistic devices, initiators, and explosive components used in aircraft ejection systems, to be delivered by December 31, 2021 to multiple Department of Defense and foreign military customers. The solicitation includes line items for over 15 different national stock numbered items and provides quantity and delivery information for domestic and foreign military sales of each item. First article testing and approval is required for one line item.

View the file

Other files for this federal contract opportunity

Other files attached to Initiator, newest first.
File Type Posted
20-50071ItemDescriptions.pdf PDF
ItemDescription_50002_50003.pdf PDF
JQR014148933.pdf PDF
20-50083ItemDescriptions.pdf PDF
JQR00-295-2166.pdf PDF
JFQRHRC.pdf PDF
AIRSPEC2050002_50003_updated.pdf PDF
JQR002991512.pdf PDF
JQRS_Hatch_Remover_Ctgs.pdf PDF
AIRSPEC_20-50083.pdf PDF
JQR_1511.pdf PDF
FA821320R3031_______0001 Solicitation.pdf PDF
FD2020-20-50002_USAF_50003_FMS_CDRLs_updated.pdf PDF
QALI_20-50071.pdf PDF
JQR01-448-3137.pdf PDF
JQR01-414-8934.pdf PDF
Itemdescriptions.pdf PDF
SOWSPI.pdf PDF
AIRSPEC_20-50071.pdf PDF
JQR011664265.pdf PDF
JQR014250548.pdf PDF
F010528206.pdf PDF
F010528208.pdf PDF
DD1423CDRL20-50071.pdf PDF
F013193847.pdf PDF
IHC_CED_DGC.pdf PDF
8206ES__EDL.pdf PDF
ADCSOWJan2018.pdf PDF
20-50083EDLs.pdf PDF
QALI_20-50083.pdf PDF
JQR01-318-7696.pdf PDF
3847ES_EDL.pdf PDF
EDL_Combined.pdf PDF
F012717161.pdf PDF
QALIF-15IFF.pdf PDF
20-50036_20-50037CDRLS.pdf PDF
AIRSPEC_20-50055.pdf PDF
JQR01-318-7697.pdf PDF
QALI20-50002_50003F-15_initiators.pdf PDF
ES7034_Attachment5.pdf PDF
F012700860spi2.pdf PDF
JFQRDrogue.pdf PDF
F012047439.pdf PDF
20-50101-EDL-3137.pdf PDF
2801ES_EDL_8208ES.pdf PDF
AIRSPEC20_50101.pdf PDF
0537ES_EDL.pdf PDF
20-50101-EDL-2166.pdf PDF
FD2020-20-50101_CDRLS.pdf PDF
FA821320R3031_______0001 Synopsis.pdf PDF
Show all 50

Initiator has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 20-50055
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: T-38/ F-5
DODIC: 1139-5, 1010-4, 6161100, 6161200
undefined: V
undefined_2: M
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: M
undefined_8: M
undefined_9:
undefined_10:
undefined_11:
undefined_12:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Explosive Weight

2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.

3. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Project Engineer

2016-05-17T14:35:57-0600
KRAMER.LAWRENCE.C.1141472808
Text46: 24 April 2019
Text49:
Type name_1:
Type name_4:
Part Number: MG48, MG47
Noun:

File details come from the government source that posted it. Updated .