QALI_MG47_MG48.pdf
PDF 108 KB Posted
- Attached to
- Initiator Federal contract opportunity
- Solicitation number
- FA821320R3031
About this file
This document contains a quality assurance letter of instruction and related federal contract opportunity solicitation. The quality assurance letter outlines inspection requirements for a contractor producing critical flight items under contract, including mandatory stamping and signatures on documentation, witnessing of testing by government inspectors, and verification of leak testing, x-rays, lot acceptance testing, and other quality control procedures. The related federal contract opportunity solicitation seeks offers for various ballistic devices, initiators, and explosive components used in aircraft ejection systems, to be delivered by December 31, 2021 to multiple Department of Defense and foreign military customers. The solicitation includes line items for over 15 different national stock numbered items and provides quantity and delivery information for domestic and foreign military sales of each item. First article testing and approval is required for one line item.
View the file
Other files for this federal contract opportunity
Show all 50
Initiator has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name CAGE code
DCMA QAR Reviewer
Date Review Completed
Date Issued to Contractor
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Monitor - R: Will monitor testing, may reduce to verification
Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
Concurrence Signature by QAR/DCMA:
QAR/DCMA
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer
Date
Sheet1
| Contract No: 20-50055 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: T-38/ F-5 |
| DODIC: 1139-5, 1010-4, 6161100, 6161200 |
| undefined: V |
| undefined_2: M |
| undefined_3: V |
| undefined_4: M |
| undefined_5: W |
| undefined_6: V |
| undefined_7: M |
| undefined_8: M |
| undefined_9: |
| undefined_10: |
| undefined_11: |
| undefined_12: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: 1.Inspection |
| Text25: 2. Leak Test |
| Text26: 3. X-Ray/N-Ray |
| Text27: 4. LAT Sample Selection |
| Text28: 5. LAT |
| Text29: 6. Preparation for Shipment |
| Text30: 7. AMMO Data Card Review |
| Text31: 8. Shippers (DD250, DD1149, Reports) |
| Text32: 9. Additional Requirements |
| Text33: |
| Text34: |
| Text35: |
| Text36: 1. Explosive Weight |
2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.
3. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Project Engineer
| 2016-05-17T14:35:57-0600 | |
| KRAMER.LAWRENCE.C.1141472808 |
| Text46: 24 April 2019 |
| Text49: |
| Type name_1: |
| Type name_4: |
| Part Number: MG48, MG47 |
| Noun: |
File details come from the government source that posted it. Updated .