QALI20-50002_50003F-15_initiators.pdf
PDF 132 KB Posted
- Attached to
- Initiator Federal contract opportunity
- Solicitation number
- FA821320R3031
About this file
This document outlines a federal solicitation for ballistic initiators and related components used in aircraft ejection systems. The solicitation includes line items for various initiators identified by National Stock Numbers (NSNs) to be delivered to multiple foreign military customers by December 31, 2021. The Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base is listed as the contracting agency. Delivery destinations and quantities are provided for each line item. DODIC codes are included to identify the predominant materials for each item. The solicitation also includes a first article test plan and items.
View the file
Other files for this federal contract opportunity
Show all 50
Initiator has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name CAGE code
DCMA QAR Reviewer
Date Review Completed
Date Issued to Contractor
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Monitor - R: Will monitor testing, may reduce to verification
Notify - N: By phone or email
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
Concurrence Signature by QAR/DCMA:
QAR/DCMA
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer
Date
Sheet1
NSN
PART NUMBER
DODIC
NOUN
1377-00-238-0552ES
2130300-1
M720
Initiator
1377-01-425-0548ES
6124100-1
M720
Initiator
1377-01-648-8442ES
21301900-2
M679
Initiator
1377-01-414-8933ES
6121100
MU78
Initiator
1377-01-318-7696ES
3123900-6
MT 15
Initiator
1377-01-414-8935ES
6123100
MU84
Initiator
1377-01-318-7697ES
3123900-5
MT14
Initiator
1377-01-414-8934ES
6122100
MU87
Initiator
1377-00-299-1512ES
2271500-1
MC61
Initiator, Canopy Actuated
1377-01-166-4265ES
6028200
MH64
Initiator, Canopy Actuated
| Contract No: 20-50002_50003 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: F-15 |
| DODIC: See attached NSN List |
| undefined: V |
| undefined_2: V |
| undefined_3: V |
| undefined_4: M |
| undefined_5: W |
| undefined_6: V |
| undefined_7: V |
| undefined_8: V |
| undefined_9: N |
| undefined_10: |
| undefined_11: |
| undefined_12: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: 1.Inspection |
| Text25: 2. Leak Test |
| Text26: 3. X-Ray/N-Ray |
| Text27: 4. LAT Sample Selection |
| Text28: 5. LAT |
| Text29: 6. Preparation for Shipment |
| Text30: 7. AMMO Data Card Review |
| Text31: 8. Shippers (DD250, DD1149, Reports) |
| Text32: 9. Additional Requirements |
| Text33: |
| Text34: |
| Text35: |
| Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements. |
2. Verify gross/fine leak checks are performed per ATP requirements
3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.
| 2019-04-17T13:18:59-0600 | |
| TIDWELL.QUINN.RAY.1241451913 |
| Text46: 17 Apr 2019 |
| Text49: |
| Type name_1: |
| Type name_4: |
| Part Number: |
| Noun: See attached NSN List |
File details come from the government source that posted it. Updated .