QALI_20-50083.pdf

PDF 888 KB Posted

Attached to
Initiator Federal contract opportunity
Solicitation number
FA821320R3031
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a federal contract solicitation for various ballistic devices and initiators used in aircraft ejection systems. The solicitation involves nine line items for products such as harness release cartridges, drogue gun cartridges, gas generators, and initiators with various part numbers. Delivery is required by 31 December 2021 for most items, with some deliveries due by 30 September 2021. The solicitation includes additional line items for foreign military sales of the same products to over a dozen countries. The Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base is the contracting agency. First article and test plan due dates are provided for some line items. DODIC codes and national stock numbers are included throughout.

View the file

Other files for this federal contract opportunity

Other files attached to Initiator, newest first.
File Type Posted
20-50071ItemDescriptions.pdf PDF
ItemDescription_50002_50003.pdf PDF
JQR014148933.pdf PDF
20-50083ItemDescriptions.pdf PDF
JQR00-295-2166.pdf PDF
JFQRHRC.pdf PDF
AIRSPEC2050002_50003_updated.pdf PDF
JQR002991512.pdf PDF
JQRS_Hatch_Remover_Ctgs.pdf PDF
AIRSPEC_20-50083.pdf PDF
JQR_1511.pdf PDF
FA821320R3031_______0001 Solicitation.pdf PDF
FD2020-20-50002_USAF_50003_FMS_CDRLs_updated.pdf PDF
QALI_20-50071.pdf PDF
ES7034_Attachment5.pdf PDF
F012700860spi2.pdf PDF
JFQRDrogue.pdf PDF
F012047439.pdf PDF
20-50101-EDL-3137.pdf PDF
2801ES_EDL_8208ES.pdf PDF
AIRSPEC20_50101.pdf PDF
0537ES_EDL.pdf PDF
20-50101-EDL-2166.pdf PDF
FD2020-20-50101_CDRLS.pdf PDF
8208ES_EDL.pdf PDF
JQR_002380552.pdf PDF
CADPADItemMarkingInstruction.pdf PDF
QALI_HRC_DROGUE_GYRO.pdf PDF
IHC_CED_HRC.pdf PDF
JQR01-448-3137.pdf PDF
JQR01-414-8934.pdf PDF
Itemdescriptions.pdf PDF
SOWSPI.pdf PDF
AIRSPEC_20-50071.pdf PDF
JQR011664265.pdf PDF
JQR014250548.pdf PDF
F010528206.pdf PDF
F010528208.pdf PDF
DD1423CDRL20-50071.pdf PDF
F013193847.pdf PDF
IHC_CED_DGC.pdf PDF
8206ES__EDL.pdf PDF
ADCSOWJan2018.pdf PDF
20-50083EDLs.pdf PDF
JQR01-318-7696.pdf PDF
3847ES_EDL.pdf PDF
EDL_Combined.pdf PDF
F012717161.pdf PDF
QALIF-15IFF.pdf PDF
FA821320R3031_______0001 Synopsis.pdf PDF
Show all 50

Initiator has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46:
2019-05-10T15:35:14-0600
SWANSON.DEVIN.D.1385800432
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 6129100
DODIC: KY90
Text20: 17610
Text19:
Part Number Line 2:
Contract No:
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: B-1B

File details come from the government source that posted it. Updated .