AIRSPEC_20-50055.pdf

PDF 400 KB Posted

Attached to
Initiator Federal contract opportunity
Solicitation number
FA821320R3031
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document outlines requirements for several ammunition and explosive items in a federal contract opportunity solicitation. Key requirements include the contractor providing cartridge actuated initiators, gas generators, drogue gun cartridges, harness release cartridges, and time delay initiators for delivery by December 31, 2021. The solicitation involves over 200 line items totaling several hundred thousand individual explosive devices to various Department of Defense and foreign military customers. The contractor must meet all applicable safety and transportation regulations for handling ammunition and explosives.

View the file

Other files for this federal contract opportunity

Other files attached to Initiator, newest first.
File Type Posted
JQR01-448-3137.pdf PDF
JQR01-414-8934.pdf PDF
Itemdescriptions.pdf PDF
SOWSPI.pdf PDF
AIRSPEC_20-50071.pdf PDF
JQR011664265.pdf PDF
JQR014250548.pdf PDF
F010528206.pdf PDF
F010528208.pdf PDF
DD1423CDRL20-50071.pdf PDF
F013193847.pdf PDF
IHC_CED_DGC.pdf PDF
8206ES__EDL.pdf PDF
ADCSOWJan2018.pdf PDF
20-50083EDLs.pdf PDF
QALI_20-50083.pdf PDF
JQR01-318-7696.pdf PDF
3847ES_EDL.pdf PDF
EDL_Combined.pdf PDF
F012717161.pdf PDF
QALIF-15IFF.pdf PDF
20-50036_20-50037CDRLS.pdf PDF
JQR01-318-7697.pdf PDF
QALI20-50002_50003F-15_initiators.pdf PDF
20-50071ItemDescriptions.pdf PDF
ItemDescription_50002_50003.pdf PDF
JQR014148933.pdf PDF
20-50083ItemDescriptions.pdf PDF
JQR00-295-2166.pdf PDF
JFQRHRC.pdf PDF
AIRSPEC2050002_50003_updated.pdf PDF
JQR002991512.pdf PDF
JQRS_Hatch_Remover_Ctgs.pdf PDF
AIRSPEC_20-50083.pdf PDF
JQR_1511.pdf PDF
FA821320R3031_______0001 Solicitation.pdf PDF
FD2020-20-50002_USAF_50003_FMS_CDRLs_updated.pdf PDF
QALI_20-50071.pdf PDF
CDRL_20-50055.pdf PDF
JFQRGyro.pdf PDF
F012340719.pdf PDF
20-50036_20-50037_AIRSPEC.pdf PDF
JQR_7439.pdf PDF
REPSHIP11Mar14.pdf PDF
QALI_MG47_MG48.pdf PDF
HazClsforFD2020-20-50002_50003.pdf PDF
JQR016488442signed.pdf PDF
CDRLs_DD1423_Package_20-50083.pdf PDF
20-50071EDLs.pdf PDF
FA821320R3031_______0001 Synopsis.pdf PDF
Show all 50

Initiator has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

9/05/2019

AIRMUNITION SPECIFICATION

(version 15 Jun, 2016)

FD2020-20-50055

NSNs:

1377-01-137-6040ES, Alt 1377-01-137-6039ES

1377-01-494-0468ES, Alt 1377-01-494-0471ES

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A

(REPSHIP) shall include all the following data in accordance with Attached REPSHIP.

2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the

DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to: AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT

84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.

3. Department of Defense Identification Code (DODIC)

1377-01-137-6040ES, Alt 1377-01-137-6039ES: MG48

1377-01-494-0468ES, Alt 1377-01-494-0471ES: MG47

4. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work –

Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)

5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.4, 16 Mar 2018, reference attachment.

6. Shelf Life Code marking NOT required per MIL-STD-129.

7. Hazard Classification Information:

NSN 1377011376040ES

Hazard Class/Division: 1.4

Storage Compatibility Group: C

DOT Marking/Proper Shipping Name: CARTRIDGES, POWER DEVICE

DOT Class/Hazard Class: 1.4C

DOT Label/Shipping Label: UN0276, CARTRIDGES, POWER DEVICE, 1.4C, PG II

UN Serial No.: 0276

UN Proper Shipping Name/UN No: CARTRIDGES, POWER DEVICE 0276

Net Explosive Weight per item (NEW): 0.003100

NEW Unit of Measurement: lbs.

mailto:ooalc.gacp.transportation@us.af.mil

NSN 1377011376039ES

Hazard Class/Division: 1.4

Storage Compatibility Group: C

DOT Marking/Proper Shipping Name: CARTRIDGES, POWER DEVICE

DOT Class/Hazard Class: 1.4C

DOT Label/Shipping Label: UN0276, CARTRIDGES, POWER DEVICE, 1.4C, PG II

UN Serial No.: 0276

UN Proper Shipping Name/UN No: CARTRIDGES, POWER DEVICE 0276

Net Explosive Weight per item (NEW): 0.007000

NSN 1377014940468ES

Storage Compatibility Group: C

DOT Marking/Proper Shipping Name: CARTRIDGES, POWER DEVICE

DOT Class/Hazard Class: 1.4C

DOT Label/Shipping Label: UN0276, CARTRIDGES, POWER DEVICE, 1.4C, PG II

UN Serial No.: 0276

UN Proper Shipping Name/UN No: CARTRIDGES, POWER DEVICE 0276

Net Explosive Weight per item (NEW): 0.005676

NSN 1377014940471ES

Storage Compatibility Group: C

DOT Marking/Proper Shipping Name: CARTRIDGES, POWER DEVICE

DOT Class/Hazard Class: 1.4C

DOT Label/Shipping Label: UN0276, CARTRIDGES, POWER DEVICE, 1.4C, PG II

UN Serial No.: UN0276

UN Proper Shipping Name/UN No: CARTRIDGES, POWER DEVICE 0276

Net Explosive Weight per item (NEW): 0.010931

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly

MSDS) and applicable supporting documentation.

8. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with

NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the:

COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639D)

NORs – CDRL (DI-SESS-80642D)

RFVs – CDRL (DI-SESS-80640D)

Distribution Statement: B, Reason: Administrative or Operational (ref. DoD 5230.24)

9. Item(s) must pass both gross and fine leak checks. MIL-STD-883, Method 1014.13 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same. Contractor shall generate a Lot Acceptance

Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

10. Lot Acceptance Test Requirements are IAW latest Government approved ATP: Contractor

11. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system: WAWF

CDRL: (DI-NDTI-80809B)

12. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air

Force Engineering Organization within 1 business day.

Air Force Engineering Organization: AFLCMC/EBHJ

Organization E-mail: Lawrence.Kramer@us.af.mil

13. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required.

CDRL: (DI-SESS-80255A)

14. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive;

and maximum particle size shall not exceed 250 microns.

15. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121

(http://www.pmddtc.state.gov/regulations_laws/itar.html).

16. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to:

fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance

(COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan. Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the

ITAR part 120 and 121.

17. Percussion primers shall have been certified /recertified by performing sensitivity (all- fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2 year certification.

Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item. All primers shall be X-rayed in top and side views for critical defects prior to use.

18. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI. MRB approval authority shall be retained by government engineer.

http://www.pmddtc.state.gov/regulations_laws/itar.html

19. Approval from government engineer is required prior to rework and repair of nonconforming material (see

Attachment Clause ES7034)

20. First Article Test/Inspection Report IAW AFMC form 260, FAT-Contractor Test

CDRL (DI-NDTI-80603A)

21. First Article Test Plan and Procedures

CDRL (DI-NDTI-81307A)

22. Contracts involving ammunition and explosives (AE) will contain:

- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives

- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives

Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments

File details come from the government source that posted it. Updated .