QALI_HRC_DROGUE_GYRO.pdf

PDF 107 KB Posted

Attached to
Initiator Federal contract opportunity
Solicitation number
FA821320R3031
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a quality assurance letter of instruction and a related federal contract opportunity solicitation. The quality assurance letter outlines inspection points that a contractor must include in work orders for critical flight items related to ACES II HRC, drogue, and gyro parts. Inspection types include mandatory stamping/signatures, witnessing, verification, monitoring, and notification. The related federal contract opportunity is a pre-solicitation for the supply of various ballistic devices and initiators for aircraft ejection systems and life support. It includes line items for harnesses, drogues, gas generators, initiators, and other parts, with quantities and delivery dates to various Department of Defense destinations through December 2021. Evaluation will be based on a first article test plan due within 120 days of approval.

View the file

Other files for this federal contract opportunity

Other files attached to Initiator, newest first.
File Type Posted
20-50071ItemDescriptions.pdf PDF
ItemDescription_50002_50003.pdf PDF
JQR014148933.pdf PDF
20-50083ItemDescriptions.pdf PDF
JQR00-295-2166.pdf PDF
JFQRHRC.pdf PDF
AIRSPEC2050002_50003_updated.pdf PDF
JQR002991512.pdf PDF
JQRS_Hatch_Remover_Ctgs.pdf PDF
AIRSPEC_20-50083.pdf PDF
JQR_1511.pdf PDF
FA821320R3031_______0001 Solicitation.pdf PDF
FD2020-20-50002_USAF_50003_FMS_CDRLs_updated.pdf PDF
QALI_20-50071.pdf PDF
JQR01-448-3137.pdf PDF
JQR01-414-8934.pdf PDF
Itemdescriptions.pdf PDF
SOWSPI.pdf PDF
AIRSPEC_20-50071.pdf PDF
JQR011664265.pdf PDF
JQR014250548.pdf PDF
F010528206.pdf PDF
F010528208.pdf PDF
DD1423CDRL20-50071.pdf PDF
F013193847.pdf PDF
IHC_CED_DGC.pdf PDF
8206ES__EDL.pdf PDF
ADCSOWJan2018.pdf PDF
20-50083EDLs.pdf PDF
QALI_20-50083.pdf PDF
JQR01-318-7696.pdf PDF
3847ES_EDL.pdf PDF
EDL_Combined.pdf PDF
F012717161.pdf PDF
QALIF-15IFF.pdf PDF
20-50036_20-50037CDRLS.pdf PDF
AIRSPEC_20-50055.pdf PDF
JQR01-318-7697.pdf PDF
QALI20-50002_50003F-15_initiators.pdf PDF
ES7034_Attachment5.pdf PDF
F012700860spi2.pdf PDF
JFQRDrogue.pdf PDF
F012047439.pdf PDF
20-50101-EDL-3137.pdf PDF
2801ES_EDL_8208ES.pdf PDF
AIRSPEC20_50101.pdf PDF
0537ES_EDL.pdf PDF
20-50101-EDL-2166.pdf PDF
FD2020-20-50101_CDRLS.pdf PDF
FA821320R3031_______0001 Synopsis.pdf PDF
Show all 50

Initiator has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 20-50036, 20-50037
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: ACES II HRC, Drouge, Gyro
DODIC: MD87, MD89, MD92
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: V
undefined_8: V
undefined_9: N
undefined_10:
undefined_11:
undefined_12:
Text19: UTAS, CED
Text20: 17610, 93455
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2018-05-04T07:50:39-0600
HANCEY.ALLEN.R.1386816111
Text46: 29 April 2019
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: HRC: 1002-41, 6284200 Drogue 1003-24, 6284100 Gyro 1004-3, 606610-02

File details come from the government source that posted it. Updated .