Exhibit_A_CDRL_Package.docx

DOCX document 2 MB Posted

Attached to
ICBM Ground Subsystem Support Contract (GSSC) 2. 0 Federal contract opportunity
Solicitation number
FA8204-19-R-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document package includes a draft request for proposal, draft attachments to the solicitation, and a request for information for the ICBM Ground Subsystem Support Contract 2.0 opportunity. The Air Force is seeking products and services in support of maintaining the ground subsystem for intercontinental ballistic missiles. Interested parties were asked to provide feedback on the draft RFP materials by October 16, 2018. The government also planned to hold an industry day on October 3-4, 2018 at Hill Air Force Base in Utah to discuss the opportunity. Responses were requested by the points of contact listed for the upcoming contract to provide ICBM ground subsystem support services.

Exhibit A - DRAFT CDRL package

View the file

Other files for this federal contract opportunity

Other files attached to ICBM Ground Subsystem Support Contract (GSSC) 2. 0, newest first.
File Type Posted
Attachment_5_GSSC_2.0_Section_L_03272019.pdf PDF
Attachment_6_GSSC_2.0_Section_M_03272019.pdf PDF
Synopsis_for_Ground_Subsystem_Support_Contract.docx DOCX document
Attach_2f_SACCS_CLS_GRID.docx DOCX document
Attach_12_Section_L.pdf PDF
Attach_1_Performance_Work_Statement.pdf PDF
Attach_3a_GSSC_GFP_List.pdf PDF
Attach_4_Award_Fee_Plan.pdf PDF
Attach_2a_General_Sustainment_GRID.docx DOCX document
Attach_2e_GMATS_CLS_GRID.docx DOCX document
FA820419R0001_03072019.pdf PDF
Attach_13_Section_M.pdf PDF
Attach_2c_HAC_RMPE_CLS_GRID.docx DOCX document
GSSC_2.0_Answers_to_Industry_Questions.docx DOCX document
Attach_6_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attach_11_DD_254.pdf PDF
Attach_9_Labor_Hours_Summary.xlsx XLSX spreadsheet
Attach_2d_Trainers_CLS_GRID.docx DOCX document
Attach_5_Pricing_Matrix.xlsx XLSX spreadsheet
Attach_2g_ALCS_Sustainment_GRID.docx DOCX document
Attach_7_Government_Labor_Category_Description.docx DOCX document
Industry_Day_3_Schedule_and_Instructions.pdf PDF
One_on_one_sessions_3_Schedule_and_Instructions.pdf PDF
GSSC_2.0_Section_M_18Jan19.pdf PDF
GSSC_2.0_Section_L_18Jan19.pdf PDF
Attach_12_Section_L.pdf PDF
Attach_10_Labor_Rate_Matrix.xlsx XLSX spreadsheet
Attach_13_Section_M.pdf PDF
GSSC_2_Summary_of_Changes.pdf PDF
DRAFT_FA820419R0001_11212018.pdf PDF
Attach_14_TEP_Matrix.xlsx XLSX spreadsheet
GSSC_2.0_Industry_Day_2_Schedule.pdf PDF
GSSC_2.0_Pre-Solicitation_General_Information.pdf PDF
Attach_8_Offeror_Labor_Category_Description_and_Mapping.xlsx XLSX spreadsheet
Attach_2b_IOSSP_Sustainment_GRID.docx DOCX document
Attach_2h_ALCS_Sustainment_GRID.docx DOCX document
Attach_2e_Trainers_CLS_GRID.docx DOCX document
Attach_6_Cross_Reference_Matrix.xlsx XLSX spreadsheet
Attach_7_Government_Labor_Category_Description.docx DOCX document
Attach_X_WBS.xlsx XLSX spreadsheet
Attach_2g_SACCS_CLS_GRID.docx DOCX document
Attach_2d_Codes_CLS_GRID.docx DOCX document
Attach_13_Section_M.pdf PDF
Attach_4_Award_Fee_Plan.docx DOCX document
Attach_3b_SerializedGFP.pdf PDF
RFI_5_Questions.docx DOCX document
Attach_12_Section_L.pdf PDF
Attach_2c_HAC_RMPE_CLS_GRID.docx DOCX document
Attach_1_Performance_Work_Statement.pdf PDF
Attach_11_DD254.pdf PDF
Show all 50

ICBM Ground Subsystem Support Contract (GSSC) 2. 0 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Data Requirements List (CDRL) Program: Grounds Subsystem Support Contract (GSSC) 2.0 Date: 13 September 2018 Version: 1

1. Introduction This document was developed in accordance with DOD MIL-STD 31000A and represents the general requirements for the Technical Data Package (TDP) for this program. The purpose of this Attachment, Technical Data Package, is to define the data deliverables due for this program, including the instructions for their development, and delivery. All specific delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.

2. General Guidelines The CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the Government, as well as the frequency and approval requirements. The Data Item Descriptions (DID), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization Information System (ASSIST) and provide additional direction for data preparation.

3. Communications Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NIES) and the cognizant program manager (PM). Copies of all forms & templates noted in this file are available as requested from your program manager, the DMO or your PCO.

4. Codes used in the DD Form 1423 The directions for submittal and approval of data is indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15 or 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.

4.1 Block 7, DD Form 250 Requirements

Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and “Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements. Information copies of DD Form 250 to accompany each letter of transmittal for this category of data.

Code
Inspection
Acceptance
SS
Source (DD Form 250 or equivalent document)
Source (DD Form 250 or equivalent document)
DD
Destination (DD Form 250 or equivalent document)
Destination (DD Form 250 or equivalent document)
SD
Source (DD Form 250 or equivalent document)
Destination (DD Form 250 or equivalent document)
DS
Destination (DD Form 250 or equivalent document)
Source (DD Form 250 or equivalent document)
Code
Inspection
LT
Letter of Transmittal only
NO
No inspection or acceptance required
XX
Inspection and acceptance requirements specified elsewhere in contract
S
Indicates the contractor’s facility
D
Indicates the primary destination point

4.2 Block 8, Approval Code

When document approval is required (code “A”), the approval authority (ORG) for that 1423 is designated with an (A). Approval coordination shall be done using the Contract Document Action Form (CDA). When document approval is not required (code “N/A”), no approval of the CDRL is required (note that documents that do not require approval shall also be marked as “NO” or “LT” in block 7.

Code
Description
A
Approval Required
N/A
Approval Not Required

4.3 Block 10, Frequency of Submittals

Code
Description
DAILY
Daily
WEKLY
Weekly
BI-WE
Each 2 weeks
MTHLY
Monthly
BI-MO
Each 2 months
QRTLY
Quarterly
ANNLY
Annually
SEMIA
Each 6 months
OTIME
One time
ONE/R
One time and revisions
R/ASR
Revisions as required
ASGEN
As generated
ASREQ
As required*
DFDEL
Deferred delivery
DFORD
Deferred ordering
DFREQ
Deferred requisitioning
ONE/P
One time preliminary draft
XTIME
Multiple separate submittals (i.e., 2Time, 3Time)

* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.

4.4 Block 12 and 13, Dates of Initial and Subsequent Submissions

Code
Description
ATP
Authority To Proceed
ASGEN
As generated
ASREQ
As required*
CDR
Critical Design Review
CA
Contract Award
CO
Change Order
CD
Calendar Day(s)
CP/REQ
Change page/as required
CP/O
Change page/(only)
DCARC
Defense Cost and Research Center
DFDEL
Deferred delivery
FQT
Formal Qualification Test
FCA
Functional Configuration Audit
PCA
Physical Configuration Audit
TRR
Test Readiness Review
SA
Supplemental Agreement
WD
Working Day(s)

* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.

5. Supplemental Data Preparation Instructions

5.1 Data Item Description (DID) Version

The most current version of the DID at the time of the award of the contract or Task Order, whichever date is most current, specified in Block 4, is to be used when submitting data. The most current version can be found at http://quicksearch.dla.mil/.

5.2 DID Tailoring

The DID is a specification for the preparation of data. DID tailoring is reflected in Block 16 of the CDRL form. “T” entered after the DID number in Block 4, means that the DID has been tailored. Block 4 tailoring is made to either relax preparation instructions or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW), Performance Work Statement (PWS) or Statement of Objectives (SOO).

5.3 Distribution Statement Marking

The designation in Block 9 of the CDRL form indicates that one of the following six (6) authorized distribution statements from Department of Defense Instruction (DoDI) 5230.24 and Air Force Instruction (AFI) 61-201 shall be annotated on that technical data. Distribution statements will be selected to denote the audience the data is intended for: A distribution statement marking is distinct from and in addition to a security classification marking assigned in accordance with (IAW) DoD 5200.1 Volume 2. Should Block 9 of the CDRL form and the DID be in conflict, Block 9 of the CDRL form shall take precedence. The following distribution statements are authorized for use in marking technical documents:

Distribution Statement A:

Approved for public release. Distribution is unlimited.

Distribution Statement B:

Distribution authorized to U.S. Government Agencies for Administrative or Operational Use (date of determination). Other requests for this document shall be referred to AFNWC/NI.

Distribution Statement C:

Distribution authorized to U.S. Government Agencies and their contractors (fill in reason) (date of determination). Other requests for this document shall be referred to AFNWC/NI.

Distribution Statement D:

Distribution authorized to Department of Defense and U.S. DoD contractors only for Administrative or Operational Use and Export Control (date of determination). Other requests shall be referred to AFNWC/NI.

Distribution Statement E:

Distribution authorized to DoD Components only for Test and Evaluation (date determination). Other requests shall be referred to AFNWC/NI.

Distribution Statement F:

Further dissemination only as directed by AFNWC/NI.

5.4 Other Notices

All technical documents marked with Distribution Statements B, C, D, E, or F will also be marked with the following notices:

WARNING:

This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

Add the following statement to the bottom of every page of the report except the SF 298, Report Documentation Page: “WARNING: EXPORT CONTROLLED.”

NOTE: The CDO Program Manager (PM) may remove the “Export Control Warning” if “critical technology” is not a reason annotated in the distribution statement and if the CDO PM can verify the technical report/document is not export control.

Destruction Notice:

Documents designated as Distribution B, C, D, E, or F shall be marked with one of the following statements:

For classified documents:

DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, DoDM 5200.01-V3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17 or AFI 16-1404, Air Force Information Security Program, para 5.2.5.

For unclassified, limited documents:

DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

5.5 Pricing CDRL Items Separately

If blocks 17 and 18 of the DD form 1423 documents are marked as "N/A" and "NSP" respectively, then the Government does not want to separately group or price CDRL items. If blocks 17 and 18 are left blank, the Government intends to seek separate pricing for the development costs of each CDRL. This pricing is for development costs of the data items and is considered separate from data rights costs.

6. Supplemental Data Delivery Instructions

6.1 Due Dates

Due dates for delivery of data are to be construed as receipt at destination. Due dates are based on calendar days unless otherwise noted.

6.2 Late Delivery

Delivery of data is considered late if it does not arrive at its destination by 1530 hours (3:30 PM) Mountain Time on the date specified in Blocks 12, 13 or 16 of the CDRL.

6.3 Submittal Procedures

6.3.1 CDRL Submittal Procedure

For the purposes of data submittal, unclassified CDRLs are submitted to the government via TopVue https://icbm.topvue.com/topvue-icbm/. As per contractors must have, at the very least, a T-1 THIS IS FOR UNCLASSIFIED CDRL SUBMITTALS ONLY. (See below for Classified CDRL submittals (6.3.2)) Each data submittal shall be accompanied by a Contract Document Action (CDA) form (please request current version from ORG1). If for any reason a CDA form is not available, a cover letter shall contain the following information:

1. Contract number

2. CDRL sequence number (i.e., A001)

3. Exact title and subtitle (if applicable) of the document being transmitted

4. Line item or CLIN number

5. Modification Number or Order Number

4. Document date, number, and revision information (if applicable)

5. Data delivery method and date of delivery

6. Whether the document is a draft, or final submittal

7. For approval data: State “For Approval”

8. If the document is a re-submittal, reference the Government letter Contractual Document Action (CDA) requesting re-submittal or disapproval of previous submittal

9. For periodic reports: The report period that the document covers

10. Distribution: Information disclosing the total contractual distribution being made per Block 14, or Block 16 of the CDRL Form

6.3.2 Classified CDRL Submittal Procedure

Classified CDRLs and classified documentation are submitted in accordance with this instruction and are never to be emailed. Classified CDRLs or portions of a CDRL, as applicable, shall be forwarded IAW Appendix B of the DD254 DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). For Classified Disks send two (2) copies.

Outer Envelope:

Address ATTN: Security Office/Document Control

Inner Envelope:

Address ATTN: Name of person for whom the document should be delivered

7. Supplemental Data Review and Approval Process

7.1 Approval CDRLs

The letter “A” in Block 8 of the DD Form 1423 indicates that the Government must approve the data item. In addition, Block 16 of the form may contain additional directions.

Written Approval
Written approval indicates agreement or concurrence with the contractor furnished data only and shall not be construed as changing any of the terms or conditions of the subject contract. The approval authority shall be ORG 1 as outlined in section 9 of this document. Approval shall take the form of either a letter signed by the PCO/DMO or concurrence using the Contractual Document Action (CDA) form, signed and dated by the representative stated in ORG 1. Data items submitted for approvals are NOT automatically approved without government approval.

Approved with Comment or Disapproved The Contractor shall revise data items Approved with Comments or Disapproved in accordance with the specific written comments transmitted with the CDA or PCO/DMO letter and resubmit not later than 30 calendar days (unless otherwise directed) from receipt of the Approval with Comments or Disapproval, unless otherwise directed. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.

Draft Versions of the CDRL If a DD Form 1423 directs the Contractor to submit a “draft” version of an approval CDRL in advance of the final version, the draft will be considered an information only submission. However, the PCO/DMO still retains the right to disapprove a draft data item that does not comply with the contract requirements. Unless otherwise directed by the PCO, the Contractor shall incorporate the Government’s comments in the final submission and shall not resubmit the draft version of the data item.

7.2 Contractual Document Action (CDA)

After the Government receives a data item submission, a Temporary Data Identification Number (TDID), a unique identifier to that submission, will be assigned by the DMO. The Government’s review of that data item will result in a coordinated CDA form, or PCO letter, indicating the data items approval or disapproval. Should the Government have comments on the data item; the CDA will include either comments on the CDA form itself or a Comment Resolution Matrix (CRM). Comments will be provided to the submitter in accordance with the format and timeline noted in block 16. Comments will be assigned one of the following codes:

COMMENT CODE
CODE DESCRIPTION
C
Critical
Comments of a very serious nature that will preclude final approval and publication of the document. You are willing to elevate the comment or issue to senior organization leadership (e.g., general officer) and recommend they non-concur. These are the "show-stoppers". Convincing rationale for critical comments must be provided. The individual making the comment and the document writer will reconcile the comment.
S
Substantive
Comments of a less serious nature that have noticeable impact on the documents quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections.
A
Administrative
Comments that address minor items such as typographical, format and/or grammatical errors.

7.3 Information Only CDRLs

When an “A” is not indicated in Block 8 of the DD Form 1423, the PCO/DMO still retains the right to disapprove any data that does not comply with contract requirements. The Contractor shall revise the disapproved data item in accordance with the specific written comments transmitted with the CDA form or PCO letter and resubmit not later than 30 calendar days, unless otherwise directed, from receipt of the disapproval. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.

8. Data Accession List (DAL) During performance of the contract, requests from the PCO for data ordered from the Data Accession List (DAL) (with the application of DID DI-MGMT-81453A) shall be provided at no increase in contract price. Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such request can be filled at no increase in contract price.

9. Organizational Cross Reference List The following Organizational Cross Reference List shall be used in conjunction with the CDRLs to determine actual addressees for distribution of data. The ORG number will be entered in lieu of a address on the CDRL and will be a part of the CDRL package. Changes to the list will be identified by an asterisk next to the ORG number and a revision date to the list.

ORG#/ Name
Address
Attention/To
Contact Info
ORG1/AFNWC/NIAG
60 30 Gum Ln Bldg 1217

Hill AFB UT 84056

Tyson Pippin
tyson.pippin@us.af.mil
ORG2/AFNWC/NI
N/A

ORG3/AFNWC/NI

Varies

ORG4/AFNWC/NIES
6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056

CM
afnwc.nies.icbm.conm@us.af.mil
ORG5/AFNWC/NIES
6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056

Software
afnwc.nies.software@us.af.mil
ORG6/AFNWC/NIES
6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056

Quality
afnwc.nies.quality.office@us.af.mil
ORG7/AFNWC/NIES
6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056

IUID/Parts Engineering
afnwc.nies.partsengineering@us.af.mil
ORG8/AFNWC/NIES
6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056

Risk Management
afnwc.nies.riskmgmt@us.af.mil
ORG9/AFNWC/NIEV
6053 Elm Ln Bldg 1245

Hill AFB UT 84056

Safety
afnwc.niev.safetymanager@us.af.mil
ORG10/AFNWC/NIEV
6053 Elm Ln Bldg 1245

Hill AFB UT 84056

Security
afnwc.niev.securitymanager@us.af.mil
ORG11/AFNWC/NIEV
6053 Elm Ln Bldg 1245

Hill AFB UT 84056

Environmental
afnwc.niev.environmentalgroup@us.af.mil
ORG12/AFNWC/NIEV
6053 Elm Ln Bldg 1245

Hill AFB UT 84056

Corrosion
afnwc.niev.corrosiongroup@us.af.mil
ORG13/AFNWC/NIEV
6053 Elm Ln Bldg 1245

Hill AFB UT 84056

Nuclear Surety
afnwc.niev.nuclearsuretymanager@us.af.mil
ORG14/AFNWC/NIEV
6053 Elm Ln Bldg 1245

Hill AFB UT 84056

TOMA
afnwc.niev.tomamodmanager@us.af.mil
ORG15/AFNWC/NIEI
6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056

Assessment
afnwc.niei.assessment@us.af.mil
ORG16/AFNWC/NIEI
N/A
ORG17/AFNWC/NIEI
6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056

EMI
afnwc.niei.emirequests@us.af.mil
ORG18/AFNWC/NIEI
N/A
ORG19/AFNWC/NIEI
6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056

NHS
afnwc.niei.nhs@us.af.mil
ORG20/AFNWC/NIEI
N/A
ORG21/AFNWC/NIEE
6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056

TE
afnwc.niee.te@us.af.mil
ORG22/AFNWC/NIT
6053 Elm Ln Bldg 1245

Hill AFB UT 84056

Cybersecurity
afnwc.ni.cybersecurity@us.af.mil
ORG23/AFNWC/NIET
N/A
ORG24/AFGSC/A31
N/A
ORG25/AFNWC/NILA
6014 Dogwood Ave Bldg 1258

Hill AFB UT 84056

DEMIL

ORG26/406 SCMS/GULAB
6038 Aspen Ave Bldg 1289 SW

Hill AFB UT 84056-5805

Provisioning
406scms.provisioning@us.af.mil
ORG27/406 SCMS/GULAA
7973 Utility Dr Bldg 1135

Hill AFB UT 84056

Packaging
406scms.gulaa.pack@us.af.mil
ORG28/419 SCMS/GUBA
6051 Gum Ln Bldg 1226

Hill AFB UT 84056

CAV AF
419scms.guba.worklfow@us.af.mil
ORG29/75 ABW/SE
7290 8th St Bldg 383

Hill AFB UT 84056 Base Safety

75abw.se.workflow@us.af.mil

ORG30/DCMA/ACO
N/A
ORG31/AFNWC/NIF
6008 Wardleigh Rd Bldg 1580

Hill AFB UT 84056

Funds
afnwc.nif.mmiii@us.af.mil
ORG32/AFNWC/PZBA
6008 Wardleigh Rd Bldg 1580

Hill AFB UT 84056

Corey Taggart
corey.taggart@us.af.mil
ORG33/AFNWC/NIES
6054 Dogwood Ave Bldg 1255

Hill AFB UT 84056

Data Management
afnwc.nies.datamgmtoffice@us.af.mil

10. CDRL Master Listing Index Full 1423’s for CDRL’s applicable to this program are included in section 11 of this document.

CDRL #
DID TITLE
DID #
A001
Integrated Program Management Report (IPMR)
DI-MGMT-81861
A002
Conference Agenda (Meeting Agenda)
DI-ADMN-81249
A003
Briefing Material
DI-MGMT-81605
A004
Report, Record of Meeting/Minutes
DI-ADMN-81505
A005
Statement of Work (SOW)
DI-MGMT-81606
A006
Contract Work Breakdown Structure
DI-MGMT-81334
A007
Program Management Plan
DI-MGMT-81797
A008-1
Work Management Plan (DEMIL/Disposal Plan)
DI-MGMT-81911
A008-2
Work Management Plan (Transition Plan)
DI-MGMT-81911
A008-3
Work Management Plan (Scope Management Plan)
DI-MGMT-81911
A008-4
Work Management Plan (Manual Procedures)
DI-MGMT-81911
A008-5
Work Management Plan (Capabilities Maturity Model Index Plan)
DI-MGMT-81911
A010
Contractor’s Risk Management Plan
DI-MGMT-81808
A011
Supplier's Configuration Management Plan
DI-SESS-80858
A012
Contractor’s Corrective Action Plan
DI-MGMT-80501
A013
Corrosion Prevention and Control Plan
DI-MFFP-81403
A014
Counterfeit Prevention Plan
DI-MISC-81832
A015-1
Quality Assurance Program Plan
DI-QCIC-81794
A015-2
Quality Assurance Program Plan (Software Quality Assurance Plan)
DI-QCIC-81794
A016
Implementation Plan
DI-MGMT-81737
A018
Contract Funds Status Report (CFSR)
DI-MGMT-81468
A019
Contract Summary Report
DI-ADMN-80447
A020
Performance and Cost Report
DI-FNCL-80912
A022
Funds and Labor Hour Expenditure Report
DI-FNCL-81537
A026
Status Report
DI-MGMT-80368
A027
Product Drawings/Models and Associated Lists
DI-SESS-81000/T
A030
Specification Change Notice (SCN)
DI-SESS-80643
A031
Engineering Change Proposal (ECP)
DI-SESS-80639
A032
Interface Control Document (ICD)
DI-SESS-81248
A033
System/Subsystem Specification
DI-IPSC-81431
A034
Master Engineering Document Lists (MEDL)
DI-MISC-82127
A035
Deficiency Report (DR)
DI-PSSS-81535
A036
Request for Nomenclature (DD Form 61)
DI-SESS-81254
A037
Request for Variance (RFV)
DI-SESS-80640
A040
Computer Software Product End Item
DI-AVCS-80700
A041
Software Development Plan (SDP)
DI-IPSC-81427
A042
Software Requirements Specification (SRS)
DI-IPSC-81433
A044
Software Design Description (SDD)
DI-IPSC-81435
A046
Software Test Plan (STP)
DI-IPSC-81438
A047
Software Test Description (STD)
DI-IPSC-81439
A048
Software Test Report (STR)
DI-IPSC-81440
A049
Software Product Specification (SPS)
DI-IPSC-81441
A050
Software Version Description (SVD)
DI-IPSC-81442
A054
Automated Computer Program Identification Number (ACPIN) Data and Control Record
DI-MISC-81454
A055
System Engineering Management Plan (SEMP)
DI-SESS-81785
A057
Technical Report – Study/Services (Test and Evaluation Master Plan)
DI-MISC-80508/T
A058
Technical Report – Study/Services (Trade Studies)
DI-MISC-80508/T
A059
Technical Report – Study/Services
DI-MISC-80508/T
A059-1
Technical Report – Study/Services (Identify Items Not Listed)
DI-MISC-80508/T
A059-2
Technical Report - Study/Services (Transactions Affecting NWRM)
DI-MISC-80508/T
A059-3
Technical Report - Study/Services (Root Cause Analysis)
DI-MISC-80508/T
A059-4
Technical Report - Study/Services (Completion of Employee Training Report)
DI-MISC-80508/T
A059-5
Technical Report - Study/Services (Security Assessment)
DI-MISC-80508/T
A059-6
Technical Report - Study/Services (Quality Report)
DI-MISC-80508/T
A059-7
Technical Report - Study/Services (Software Analysis)
DI-MISC-80508/T
A059-8
Technical Report - Study/Services (Trending Analysis)
DI-MISC-80508/T
A059-9
Technical Report - Study/Services (Data Book)
DI-MISC-80508/T
A059-10
Technical Report - Study/Services (Close Loop Failure Analysis)
DI-MISC-80508/T
A059-11
Technical Report - Study/Services (Weapon System Assessment)
DI-MISC-80508/T
A059-12
Technical Report - Study/Services (Aging Surveillance Assessment)
DI-MISC-80508B/T
A059-13
Technical Report - Study/Services (Weapon System Effectiveness Report (WSER))
DI-MISC-80508B/T
A059-14
Technical Report - Study/Services (Requirements Development and Analysis)
DI-MISC-80508B/T
A059-15
Technical Report - Study/Services (Metrics to inclue Mean Time to Repair (MTTR), Meant Time Between Failures (MTBF), and Inherent Availability)
DI-MISC-80508B/T
A059-16
Technical Report - Study/Services (SACCS Trouble Monitor report Analysis (STMR))
DI-MISC-80508B/T
A059-17
Technical Report - Study/Services (Analytical Assessment and Evaluation)
DI-MISC-80508B/T
A059-18
Technical Report - Study/Services (Service Life Extension (SLE) Study)
DI-MISC-80508B/T
A059-18
Technical Report - Study/Services (Feasibility Study)
DI-MISC-80508B/T
A059-19
Technical Report - Study/Services (Power and Grounding Study Study)
DI-MISC-80508B/T
A059-20
Technical Report - Study/Services (Mitigation Strategy Options)
DI-MISC-80508B/T
A059-21
Technical Report - Study/Services (Problem Log)
DI-MISC-80508B/T
A059-22
Technical Report - Study/Services (Watch List Report)
DI-MISC-80508B/T
A059-23
Technical Report - Study/Services (Non-availability Report)
DI-MISC-80508B/T
A059-24
Technical Report - Study/Services (Temporary Fix)
DI-MISC-80508B/T
A059-25
Technical Report - Study/Services (Quick Look Report)
DI-MISC-80508B/T
A060
Test Plan
DI-NDTI-80566
A061
Test Procedure
DI-NDTI-80603
A062
Test/Inspection Report
DI-NDTI-80809
A065
System Safety Program Plan (SSPP)
DI-SAFT-81626
A066
System Safety Hazard Analysis Report (SSHAR)
DI-SAFT-80101
A067
Safety Assessment Report (SAR)
DI-SAFT-80102
A068
Safety Studies Plan
DI-SAFT-81066
A069
Safety Studies Report
DI-SAFT-81065
A071
Accident/Incident Report
DI-SAFT-81563
A072
Work Management Plan (Safety Plan (Appendix C))
DI-MGMT-81911
A074
Programmatic Environmental Safety and Health Evaluation (PESHE) Plan
DI-ENVR-81840
A075
Technical Report- Study/Services (NEPA)
DI-MISC-80508/T
A076
Finish Specification
DI-MFFP-81402
A077
Aircraft Nuclear Safety Analysis Report (NSAR)
DI-NUOR-81405/T
A078
Certification Requirements Plan (CRP)
DI-NUOR-81409
A079
Engineering Evaluation Report (EER)
DI-NURO-81411
A080
Nuclear Certification Impact Statement (NCIS)
DI-NUOR-81888
A081
Technical Report – Study/Services (Nuclear Surety Evaluation Report (NSER)
DI-MISC-80508/T
A082
Electromagnetic Interference Control Procedures (EMICP)
DI-EMCS-80199
A083
Electromagnetic Interference Test Procedures (EMITP)
DI-EMCS-80201
A084
Electromagnetic Interference Test Report (EMITIR)
DI-EMCS-80200
A089
Nuclear Hardness and Survivability (NH&S) Program Plan
DI-ENVR-82097
A090
Nuclear Hardness and Survivability (NH&S) Design Analysis Report
DI-ENVR-80266
A091
Preservation & Packing Data
DI-PACK-80120/T
A092
Special Packaging Instructions (SPIs)
DI-PACK-80121/T
A093
Container Design Retrieval System (CDRS) Search Request
DI-PACK-80683
A094
Container Design retrieval System (CDRS) Data Input
DI-PACK-80684
A095
Performance Oriented Packaging Test Report
DI-PACK-81059
A099
Commercial Asset Visibility Air Force (CAV AF)/ Government Furnished Material Report
DI-MGMT-81634
A101
Failure Summary and Analysis Report
DI-SESS-80255
A102
Failure Modes, Effects, and Criticality Analysis Report (FMECA)
DI-SESS-81495
A103
Item Unique Identification (IUID) Marking Plan
DI-MGMT-81803
A104
Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
DI-MGMT-81804
A105
Information Systems Accreditation Documentation
DI-ADMN-80239
A106
Naval Aviation Program Protection Implementation Plan
DI-MGMT-82144/T
A107
Training Materials
DI-ILSS-80872
A108
Status of Government Furnished Equipment (GFE) Report
DI-MGMT-80269
A109
Commercial Off-the-Shelf (COTS) Manuals and Associated Supplemental Data
DI-TMSS-80527
A110
Technical Manual contract Requirement (TMCR)
TM 86-01
A111
Data Accession List (DAL)
DI-MGMT-81453
A112
Report of Receipts, Inventory, Adjustments, and Shipments of Government Property
DI-MGMT-80442
A113
Report of Shipping (Item) and Packaging Discrepancy
DI-MGMT-80503
A114
Real Property Inventory Detail List
DI-MGMT-80213
A115
NAVAIR Cybersecurity Implementation Plan
DI-MGMT-82002/T
A116
System Assessment Report (SAR)
DI-MGMT-80469
A117
Cybersecurity Vulnerability Report
DI-MGMT-82191
A118
Software Quality Assurance Report
DI-QCIC-81795
A119
Mathematical Model Finite Element Analysis Report
DI-GDRQ-81257
A120
Critical Items List
DI-RELI-80685
A121
Risk Management Status Report
DI-MGMT-81809
A122
Parts, Materials, and Processes Selection List (PMPSL)
DI-MISC-81277
A123
Integrated Logistics Support Plan
DI-ILSS-80095
A124
Hardness Data Manual (HDM) Update
DI-ENVR-82096
A125
Time Compliance Technical Order (TCTO) Reporting
DI-MGMT-81325
A126
Small Business Subcontractor Report
DI-MGMT-81642
A127
Bill of Materials (BOM) for Logistics and Supply Chain Risk Management
DI-PSSS-81656
A128
Site Survey Report (SSR)
DI-MISC-82104
A129
Contractor’s Progress, Status and Management Report
DI-MGMT-80227
A130
Baseline Description Document
DI-SESS-81121
A131
Department of Defense (DoD) Modeling and Simulation (M&S) Verification and Validation (V&V) Plan
DI-MSSM-81751
A132
Department of Defense (DoD) Modeling and Simulation (M&S) Verification and Validation (V&V) Report
DI-MSSM-81752
A133
Performance Specification Documents
DI-SDMP-81465
A134
Repair Procedure
DI-MGMT-81910
A135
System Problem Report – SPR
DI-MGMT-81232
A136
Equipment Inventory Records (EIRS)
DI-ILSS-81251
A137
Trip/Travel Report
DI-MISC-81943
A138
Integrated Production Schedule (IPS) Report
DI-MGMT-82075
A139
Contract Field Service Report
DI-MGMT-81238
A140
Maintenance Service Report
DI-MGMT-80995
A141
Operations Security (OPSEC) Plan
DI-MGMT-80934
A142
Naval Aviation Supply Chain Risk Management (SCRM) Process
DI-MGMT-82147/T
A143
Customized Microelectronics Devices Source Protection Plan
DI-MGMT-81763
A144
Security Verification Plan and Procedures
DI-QCIC-81689
A145
Security Evaluation Document (SED)
DI-MISC-81762
A146
Source/Vendor List
DI-MGMT-80894
A147
Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report
DI-QCIC-80125
A148
Security Vulnerability Analysis
DI-MISC-80841
A149
Survivability Analysis Report
DI-MISC-80564

11. DD Form 1423s (full 1423’s) *1423’s, block A Reference Number: CLIN number to be added at time of award **1423’s block E Reference Number: Contract and Mod/TO number to be added at time of award

CONTRACT DATA REQUIREMENTS LISTLM 18-37

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER ___X_____
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0

FA8204-19-R-0001

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A001

INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR)

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MGMT-81861/T
PWS Para TBD
AFNWC/NIAG
7. DD 250 REQ
9.DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.DISTRIBUTION

LT

MTHLY
SEE BLK 16

b. COPIES

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

N/A

EOM
SEE BLK 16

Reg

Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 4:

0. All formats shall be submitted electronically in accordance with the DoD-approved XML schemas located in the EVM Central Repository (EVM-CR) http://cade.osd.mil/tools/evm-tools.

2.All IPMR files must be electronically forwarded to the EVM-CR at the DCARC Web site at https://service.cade.osd.mil/DCARCPortal.
3.Only Formats 1, 4, 5, 6, and 7 are required. (Format 7 required only if program is greater than $20M)
4.Formats 1 4, & 6 shall be submitted using the DoD-approved cost XML guideline and schema.
5.Formats 5 shall be submitted in contractor format.
6.Format 7 shall be submitted using the DoD-approved time-phased cost SML guideline and schema only when program is great than $20M.
7.IPMRs, when required from subcontractors, will be provided electronically using the DoD-approved SML formats.
8.Format 1 Instructions: Work Breakdown Structure (WBS) elements shall be reported in accordance with the PMO approved contractually required WBS. This is also known as the “Reporting Level.”

· The Government reserves the right, with prior notice, to request, if available, temporary visibility into WBS elements one level below the contractual WBS>

· Only ACWP, BAC, EAC, BCWWS, BCWP, SV, CV and VAC are required to be filled out for reporting purposes to the Government.

9.Format 2 Instructions: Not Required.
10.Format 3 Instructions: Not Required.
11.Format 4 Instructions:

EVM-CR

ORG1 (Lt of delivery only)

ORG2 (Lt of delivery only)

ORG32 (Lt of delivery only)

ORG33 (Lt of delivery only)

15. TOTAL

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

See digital signature

DD Form 1423-1, FEB 2001 Page___1__of__2_ Page

CONTRACT DATA REQUIREMENTS LISTLM 18-37

Form Approved

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP X TM OTHER _____ ____
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0

16. REMARKS (Continued): CDRL A001 Continued.

· Significant changes that require explanations in Format 5 are those that change the absolute value of the projected total staff-months at completion of any organizational or functional category by more than =/-5%.

· Staffing forecast should be by month for the next six months and quarterly thereafter.

12. Format 5 Instructions:

· Format 5 shall address major accomplishments and tasks worked during the month along with major barriers to accomplishing the planned work.

· The variance analysis thresholds are:

· 10% and $25K for current period variances.

· 5% and $100K for cumulative cost variances.

· 5% for at complete variances.

· Narrative explanations required and variance thresholds will be reviewed periodically and may be adjusted by contract modification with no change to contract price.

· Variance analysis narratives shall be reported at the reporting level as determined by the WBS level on Format 1. The narratives also shall:

· Quantify and explain the root cause of the variance and account for at least the majority of the variance amount exceeding the threshold.

· Specific corrective actions, forecasted closure date, and impact to the Estimate at Completion (EAC) shall be included in each variance narrative.

· If there are no changes to the reportable element problem analysis, the expected impacts, or corrective action status, then specify, “no changes since the last reported analysis” and reference the IPMR date when the narrative was reported.

13.Format 6 Instructions: Monthly
14.Format 7 Instructions: Work Breakdown Structure (WBS) elements shall be reported in accordance with the PMO approved contractually required WBS (BCWS, BCWP, ACWP, SV, CV, BAC, EAC, & VAC).

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Initial Submittal:

Contractor shall submit initial Integrated Program Management Report (IPMR) (Formats 1, 4, 5, 6, & 7) NLT 12th day after the end of the second full accounting period following authorization to proceed (ATP).

Subsequent Submittals:

Contractor shall submit subsequent IPMR, containing the required Formats, NLT 20th business day of each month thereafter. Format 7 is due annually, NLT 20 days after the end of the fiscal year. Final submissions are due when the last significant milestone/deliverable as defined by the contract has been achieved and remaining risk areas have been mitigated. Government will be allowed 10 days, after receipt from contractor, to review comments. Contractor shall submit revised IPMR incorporating Government comments, if applicable, on the following month’s IPMR.

BLOCK 14: Contractor shall submit letter of delivery of IPMR to TopVue https://icbm.topvue.com/topvue-icbm/

DD Form 1423-1, FEB 2001 Page___2__of___2__Page

CONTRACT DATA REQUIREMENTS LISTLM 18-37

Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER ___X_____
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A002
CONFERENCE AGENDA
Meeting Agenda
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-ADMN-81249
PWS Para TBD
AFNWC/NIAG
7. DD 250 REQ
9.DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.DISTRIBUTION

LT

ASREQ
N/A

b. COPIES

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

A

N/A
N/A

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Conference Agenda (Meeting Agenda), if applicable, NLT 5 days prior to scheduled meetings or meetings deemed necessary by the Government. Government will be allowed 2 days, after receipt from contractor, to review for approval/disapproval/ comments. Contractor shall submit revised Meeting Agenda incorporating Government comments, if applicable, NLT 2 days after receipt from Government.

BLOCK 14: Contractor shall submit Meeting Agenda to TopVue https://icbm.topvue.com/topvue-icbm/

ORG2 (Lt of delivery only)

15. TOTAL

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

CONTRACT DATA REQUIREMENTS LISTLM 18-37

Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER ___X_____
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A003
BRIEFING MATERIALS
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MGMT-81605
PWS Para TBD
AFNWC/NIAG
7. DD 250 REQ
9.DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.DISTRIBUTION

LT

ASREQ
SEE BLK 16

b. COPIES

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

N/A

N/A
N/A

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Briefing Materials NLT 5 days prior to each scheduled meeting and/or any other meeting deemed necessary by the Government and as requested by the Government. Government will be allowed 2 days, after receipt from contractor, to review for comments. Contractor shall present corrected Briefing Materials incorporating Government comments, if applicable, NLT 2 days after receipt from Government.

BLOCK 14:

Contractor shall submit Briefing Materials to TopVue https://icbm.topvue.com/topvue-icbm/

15. TOTAL

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

CONTRACT DATA REQUIREMENTS LISTLM 18-37

Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER ___X_____
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A004

REPORT, RECORD OF MEETING/MINUTES

Meeting Minutes

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-ADMN-81505
PWS Para TBD
AFNWC/NIAG
7. DD 250 REQ
9.DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.DISTRIBUTION

LT

ASREQ
SEE BLK 16

b. COPIES

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

A

N/A
SEE BLK 16

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Report, Record of Meeting Minutes (Meeting Minutes) NLT 15 days after meeting or event has been held. Government will be allowed 5 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Minutes incorporating Government comments, if applicable, NLT 5 days after receipt from Government.

BLOCK 14: Contractor shall submit Meeting Minutes to TopVue https://icbm.topvue.com/topvue-icbm/

15. TOTAL

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

CONTRACT DATA REQUIREMENTS LISTLM 18-37

Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER ___X_____
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A005
STATEMENT OF WORK (SOW)
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MGMT-81606
PWS Para TBD
AFNWC/NIAG
7. DD 250 REQ
9.DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.DISTRIBUTION

LT

R/ASR
SEE BLK 16

b. COPIES

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

A

SEE BLK 16
SEE BLK 16

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Statement of Work (SOW) NLT the 30 days after contract award. Government will be allowed 15 days after receipt from contractor to review for approval/disapproval/comments. Contractor shall resubmit corrected SOW incorporating Government comments, if applicable, NLT 15 days after receipt from Government.

BLOCK 14: Contractor shall submit SOW to TopVue https://icbm.topvue.com/topvue-icbm/

15. TOTAL

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD Form 1423-1, FEB 2001 Page___1__of___1__Pages

CONTRACT DATA REQUIREMENTS LISTLM 18-37

Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER ___X_____
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A006

CONTRACT WORK BREAKDOWN STRUCTURE

4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MGMT-81334
PWS Para TBD
AFNWC/NIAG
7. DD 250 REQ
9.DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.DISTRIBUTION

LT

ASREQ
SEE BLK 16

b. COPIES

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

A

N/A
SEE BLK 16

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Contract Work Breakdown Structure (CWBS) NLT 30 days after award of contract. Contractor shall submit updated CWBS annually per option period. Government will be allowed 30 days, after receipt from the contractor, to review for comments. Contractor shall submit revised CWBS incorporating Government comments, if applicable, NLT 15 days after receipt from Government.

BLOCK 14: Contractor shall submit CWBS to TopVue, https://icbm.topvue.com/topvue-icbm/.

15. TOTAL

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

CONTRACT DATA REQUIREMENTS LISTLM 18-37

Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A
TDP TM OTHER ___X_____
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR

GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0

1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE

17. PRICE GROUP

A007
PROGRAM MANAGEMENT PLAN
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE

18. ESTIMATED TOTAL PRICE

DI-MGMT-81797
PWS Para TBD
AFNWC/NIAG
7. DD 250 REQ
9.DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.DISTRIBUTION

LT

ANNLY
SEE BLK 16

b. COPIES

8. APP CODE
D
11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

A

SEE BLK 16
SEE BLK 16

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 4:

1. Delete paragraph 2.c. in its entirety.

BLOCK 9:

Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Contractor shall submit Program Management Plan NLT 30 days after award of contract. Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit updated Program Management Plan incorporating Government comments, if applicable, NLT 30 days after receipt from Government.

BLOCK 14: Contractor shall submit Program Management Plan to TopVue, https://icbm.topvue.com/topvue-icbm/

15. TOTAL

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

CONTRACT DATA REQUIREMENTS LISTLM 18-37

Form Approved

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:
A

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .