The file's text, extracted by GovTribe without its formatting.
Contract Data Requirements List (CDRL) Program: Grounds Subsystem Support Contract (GSSC) 2.0 Date: 13 September 2018 Version: 1
1. Introduction This document was developed in accordance with DOD MIL-STD 31000A and represents the general requirements for the Technical Data Package (TDP) for this program. The purpose of this Attachment, Technical Data Package, is to define the data deliverables due for this program, including the instructions for their development, and delivery. All specific delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.
2. General Guidelines The CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the Government, as well as the frequency and approval requirements. The Data Item Descriptions (DID), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization Information System (ASSIST) and provide additional direction for data preparation.
3. Communications Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NIES) and the cognizant program manager (PM). Copies of all forms & templates noted in this file are available as requested from your program manager, the DMO or your PCO.
4. Codes used in the DD Form 1423 The directions for submittal and approval of data is indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15 or 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.
4.1 Block 7, DD Form 250 Requirements
Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and “Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements. Information copies of DD Form 250 to accompany each letter of transmittal for this category of data.
| Code |
| Inspection |
| Acceptance |
| SS |
| Source (DD Form 250 or equivalent document) |
| Source (DD Form 250 or equivalent document) |
| DD |
| Destination (DD Form 250 or equivalent document) |
| Destination (DD Form 250 or equivalent document) |
| SD |
| Source (DD Form 250 or equivalent document) |
| Destination (DD Form 250 or equivalent document) |
| DS |
| Destination (DD Form 250 or equivalent document) |
| Source (DD Form 250 or equivalent document) |
| LT |
| Letter of Transmittal only |
| NO |
| No inspection or acceptance required |
| XX |
| Inspection and acceptance requirements specified elsewhere in contract |
| S |
| Indicates the contractor’s facility |
| D |
| Indicates the primary destination point |
4.2 Block 8, Approval Code
When document approval is required (code “A”), the approval authority (ORG) for that 1423 is designated with an (A). Approval coordination shall be done using the Contract Document Action Form (CDA). When document approval is not required (code “N/A”), no approval of the CDRL is required (note that documents that do not require approval shall also be marked as “NO” or “LT” in block 7.
| N/A |
| Approval Not Required |
4.3 Block 10, Frequency of Submittals
| ONE/R |
| One time and revisions |
| R/ASR |
| Revisions as required |
| DFREQ |
| Deferred requisitioning |
| ONE/P |
| One time preliminary draft |
| XTIME |
| Multiple separate submittals (i.e., 2Time, 3Time) |
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.
4.4 Block 12 and 13, Dates of Initial and Subsequent Submissions
| CDR |
| Critical Design Review |
| CP/REQ |
| Change page/as required |
| DCARC |
| Defense Cost and Research Center |
| FQT |
| Formal Qualification Test |
| FCA |
| Functional Configuration Audit |
| PCA |
| Physical Configuration Audit |
| TRR |
| Test Readiness Review |
| SA |
| Supplemental Agreement |
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in Block 16.
5. Supplemental Data Preparation Instructions
5.1 Data Item Description (DID) Version
The most current version of the DID at the time of the award of the contract or Task Order, whichever date is most current, specified in Block 4, is to be used when submitting data. The most current version can be found at http://quicksearch.dla.mil/.
5.2 DID Tailoring
The DID is a specification for the preparation of data. DID tailoring is reflected in Block 16 of the CDRL form. “T” entered after the DID number in Block 4, means that the DID has been tailored. Block 4 tailoring is made to either relax preparation instructions or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW), Performance Work Statement (PWS) or Statement of Objectives (SOO).
5.3 Distribution Statement Marking
The designation in Block 9 of the CDRL form indicates that one of the following six (6) authorized distribution statements from Department of Defense Instruction (DoDI) 5230.24 and Air Force Instruction (AFI) 61-201 shall be annotated on that technical data. Distribution statements will be selected to denote the audience the data is intended for: A distribution statement marking is distinct from and in addition to a security classification marking assigned in accordance with (IAW) DoD 5200.1 Volume 2. Should Block 9 of the CDRL form and the DID be in conflict, Block 9 of the CDRL form shall take precedence. The following distribution statements are authorized for use in marking technical documents:
Distribution Statement A:
Approved for public release. Distribution is unlimited.
Distribution Statement B:
Distribution authorized to U.S. Government Agencies for Administrative or Operational Use (date of determination). Other requests for this document shall be referred to AFNWC/NI.
Distribution Statement C:
Distribution authorized to U.S. Government Agencies and their contractors (fill in reason) (date of determination). Other requests for this document shall be referred to AFNWC/NI.
Distribution Statement D:
Distribution authorized to Department of Defense and U.S. DoD contractors only for Administrative or Operational Use and Export Control (date of determination). Other requests shall be referred to AFNWC/NI.
Distribution Statement E:
Distribution authorized to DoD Components only for Test and Evaluation (date determination). Other requests shall be referred to AFNWC/NI.
Distribution Statement F:
Further dissemination only as directed by AFNWC/NI.
5.4 Other Notices
All technical documents marked with Distribution Statements B, C, D, E, or F will also be marked with the following notices:
WARNING:
This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.
Add the following statement to the bottom of every page of the report except the SF 298, Report Documentation Page: “WARNING: EXPORT CONTROLLED.”
NOTE: The CDO Program Manager (PM) may remove the “Export Control Warning” if “critical technology” is not a reason annotated in the distribution statement and if the CDO PM can verify the technical report/document is not export control.
Destruction Notice:
Documents designated as Distribution B, C, D, E, or F shall be marked with one of the following statements:
For classified documents:
DESTRUCTION NOTICE: Follow the procedures in DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, DoDM 5200.01-V3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17 or AFI 16-1404, Air Force Information Security Program, para 5.2.5.
For unclassified, limited documents:
DESTRUCTION NOTICE: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.
5.5 Pricing CDRL Items Separately
If blocks 17 and 18 of the DD form 1423 documents are marked as "N/A" and "NSP" respectively, then the Government does not want to separately group or price CDRL items. If blocks 17 and 18 are left blank, the Government intends to seek separate pricing for the development costs of each CDRL. This pricing is for development costs of the data items and is considered separate from data rights costs.
6. Supplemental Data Delivery Instructions
6.1 Due Dates
Due dates for delivery of data are to be construed as receipt at destination. Due dates are based on calendar days unless otherwise noted.
6.2 Late Delivery
Delivery of data is considered late if it does not arrive at its destination by 1530 hours (3:30 PM) Mountain Time on the date specified in Blocks 12, 13 or 16 of the CDRL.
6.3 Submittal Procedures
6.3.1 CDRL Submittal Procedure
For the purposes of data submittal, unclassified CDRLs are submitted to the government via TopVue https://icbm.topvue.com/topvue-icbm/. As per contractors must have, at the very least, a T-1 THIS IS FOR UNCLASSIFIED CDRL SUBMITTALS ONLY. (See below for Classified CDRL submittals (6.3.2)) Each data submittal shall be accompanied by a Contract Document Action (CDA) form (please request current version from ORG1). If for any reason a CDA form is not available, a cover letter shall contain the following information:
1. Contract number
2. CDRL sequence number (i.e., A001)
3. Exact title and subtitle (if applicable) of the document being transmitted
4. Line item or CLIN number
5. Modification Number or Order Number
4. Document date, number, and revision information (if applicable)
5. Data delivery method and date of delivery
6. Whether the document is a draft, or final submittal
7. For approval data: State “For Approval”
8. If the document is a re-submittal, reference the Government letter Contractual Document Action (CDA) requesting re-submittal or disapproval of previous submittal
9. For periodic reports: The report period that the document covers
10. Distribution: Information disclosing the total contractual distribution being made per Block 14, or Block 16 of the CDRL Form
6.3.2 Classified CDRL Submittal Procedure
Classified CDRLs and classified documentation are submitted in accordance with this instruction and are never to be emailed. Classified CDRLs or portions of a CDRL, as applicable, shall be forwarded IAW Appendix B of the DD254 DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM). For Classified Disks send two (2) copies.
Outer Envelope:
Address ATTN: Security Office/Document Control
Inner Envelope:
Address ATTN: Name of person for whom the document should be delivered
7. Supplemental Data Review and Approval Process
7.1 Approval CDRLs
The letter “A” in Block 8 of the DD Form 1423 indicates that the Government must approve the data item. In addition, Block 16 of the form may contain additional directions.
| Written Approval |
| Written approval indicates agreement or concurrence with the contractor furnished data only and shall not be construed as changing any of the terms or conditions of the subject contract. The approval authority shall be ORG 1 as outlined in section 9 of this document. Approval shall take the form of either a letter signed by the PCO/DMO or concurrence using the Contractual Document Action (CDA) form, signed and dated by the representative stated in ORG 1. Data items submitted for approvals are NOT automatically approved without government approval. |
Approved with Comment or Disapproved The Contractor shall revise data items Approved with Comments or Disapproved in accordance with the specific written comments transmitted with the CDA or PCO/DMO letter and resubmit not later than 30 calendar days (unless otherwise directed) from receipt of the Approval with Comments or Disapproval, unless otherwise directed. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.
Draft Versions of the CDRL If a DD Form 1423 directs the Contractor to submit a “draft” version of an approval CDRL in advance of the final version, the draft will be considered an information only submission. However, the PCO/DMO still retains the right to disapprove a draft data item that does not comply with the contract requirements. Unless otherwise directed by the PCO, the Contractor shall incorporate the Government’s comments in the final submission and shall not resubmit the draft version of the data item.
7.2 Contractual Document Action (CDA)
After the Government receives a data item submission, a Temporary Data Identification Number (TDID), a unique identifier to that submission, will be assigned by the DMO. The Government’s review of that data item will result in a coordinated CDA form, or PCO letter, indicating the data items approval or disapproval. Should the Government have comments on the data item; the CDA will include either comments on the CDA form itself or a Comment Resolution Matrix (CRM). Comments will be provided to the submitter in accordance with the format and timeline noted in block 16. Comments will be assigned one of the following codes:
| COMMENT CODE |
| CODE DESCRIPTION |
| C |
| Critical |
| Comments of a very serious nature that will preclude final approval and publication of the document. You are willing to elevate the comment or issue to senior organization leadership (e.g., general officer) and recommend they non-concur. These are the "show-stoppers". Convincing rationale for critical comments must be provided. The individual making the comment and the document writer will reconcile the comment. |
| S |
| Substantive |
| Comments of a less serious nature that have noticeable impact on the documents quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections. |
| A |
| Administrative |
| Comments that address minor items such as typographical, format and/or grammatical errors. |
7.3 Information Only CDRLs
When an “A” is not indicated in Block 8 of the DD Form 1423, the PCO/DMO still retains the right to disapprove any data that does not comply with contract requirements. The Contractor shall revise the disapproved data item in accordance with the specific written comments transmitted with the CDA form or PCO letter and resubmit not later than 30 calendar days, unless otherwise directed, from receipt of the disapproval. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.
8. Data Accession List (DAL) During performance of the contract, requests from the PCO for data ordered from the Data Accession List (DAL) (with the application of DID DI-MGMT-81453A) shall be provided at no increase in contract price. Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such request can be filled at no increase in contract price.
9. Organizational Cross Reference List The following Organizational Cross Reference List shall be used in conjunction with the CDRLs to determine actual addressees for distribution of data. The ORG number will be entered in lieu of a address on the CDRL and will be a part of the CDRL package. Changes to the list will be identified by an asterisk next to the ORG number and a revision date to the list.
| ORG#/ Name |
| Address |
| Attention/To |
| Contact Info |
| ORG1/AFNWC/NIAG |
| 60 30 Gum Ln Bldg 1217 |
Hill AFB UT 84056
| Tyson Pippin |
| tyson.pippin@us.af.mil |
ORG3/AFNWC/NI
Varies
| ORG4/AFNWC/NIES |
| 6054 Dogwood Ave Bldg 1255 |
Hill AFB UT 84056
| CM |
| afnwc.nies.icbm.conm@us.af.mil |
| ORG5/AFNWC/NIES |
| 6054 Dogwood Ave Bldg 1255 |
Hill AFB UT 84056
| Software |
| afnwc.nies.software@us.af.mil |
| ORG6/AFNWC/NIES |
| 6054 Dogwood Ave Bldg 1255 |
Hill AFB UT 84056
| Quality |
| afnwc.nies.quality.office@us.af.mil |
| ORG7/AFNWC/NIES |
| 6054 Dogwood Ave Bldg 1255 |
Hill AFB UT 84056
| IUID/Parts Engineering |
| afnwc.nies.partsengineering@us.af.mil |
| ORG8/AFNWC/NIES |
| 6054 Dogwood Ave Bldg 1255 |
Hill AFB UT 84056
| Risk Management |
| afnwc.nies.riskmgmt@us.af.mil |
| ORG9/AFNWC/NIEV |
| 6053 Elm Ln Bldg 1245 |
Hill AFB UT 84056
| Safety |
| afnwc.niev.safetymanager@us.af.mil |
| ORG10/AFNWC/NIEV |
| 6053 Elm Ln Bldg 1245 |
Hill AFB UT 84056
| Security |
| afnwc.niev.securitymanager@us.af.mil |
| ORG11/AFNWC/NIEV |
| 6053 Elm Ln Bldg 1245 |
Hill AFB UT 84056
| Environmental |
| afnwc.niev.environmentalgroup@us.af.mil |
| ORG12/AFNWC/NIEV |
| 6053 Elm Ln Bldg 1245 |
Hill AFB UT 84056
| Corrosion |
| afnwc.niev.corrosiongroup@us.af.mil |
| ORG13/AFNWC/NIEV |
| 6053 Elm Ln Bldg 1245 |
Hill AFB UT 84056
| Nuclear Surety |
| afnwc.niev.nuclearsuretymanager@us.af.mil |
| ORG14/AFNWC/NIEV |
| 6053 Elm Ln Bldg 1245 |
Hill AFB UT 84056
| TOMA |
| afnwc.niev.tomamodmanager@us.af.mil |
| ORG15/AFNWC/NIEI |
| 6054 Dogwood Ave Bldg 1255 |
Hill AFB UT 84056
| Assessment |
| afnwc.niei.assessment@us.af.mil |
| ORG17/AFNWC/NIEI |
| 6054 Dogwood Ave Bldg 1255 |
Hill AFB UT 84056
| EMI |
| afnwc.niei.emirequests@us.af.mil |
| ORG19/AFNWC/NIEI |
| 6054 Dogwood Ave Bldg 1255 |
Hill AFB UT 84056
| NHS |
| afnwc.niei.nhs@us.af.mil |
| ORG21/AFNWC/NIEE |
| 6054 Dogwood Ave Bldg 1255 |
Hill AFB UT 84056
| TE |
| afnwc.niee.te@us.af.mil |
| ORG22/AFNWC/NIT |
| 6053 Elm Ln Bldg 1245 |
Hill AFB UT 84056
| Cybersecurity |
| afnwc.ni.cybersecurity@us.af.mil |
| ORG25/AFNWC/NILA |
| 6014 Dogwood Ave Bldg 1258 |
Hill AFB UT 84056
DEMIL
| ORG26/406 SCMS/GULAB |
| 6038 Aspen Ave Bldg 1289 SW |
Hill AFB UT 84056-5805
| Provisioning |
| 406scms.provisioning@us.af.mil |
| ORG27/406 SCMS/GULAA |
| 7973 Utility Dr Bldg 1135 |
Hill AFB UT 84056
| Packaging |
| 406scms.gulaa.pack@us.af.mil |
| ORG28/419 SCMS/GUBA |
| 6051 Gum Ln Bldg 1226 |
Hill AFB UT 84056
| CAV AF |
| 419scms.guba.worklfow@us.af.mil |
| ORG29/75 ABW/SE |
| 7290 8th St Bldg 383 |
Hill AFB UT 84056 Base Safety
75abw.se.workflow@us.af.mil
| ORG31/AFNWC/NIF |
| 6008 Wardleigh Rd Bldg 1580 |
Hill AFB UT 84056
| Funds |
| afnwc.nif.mmiii@us.af.mil |
| ORG32/AFNWC/PZBA |
| 6008 Wardleigh Rd Bldg 1580 |
Hill AFB UT 84056
| Corey Taggart |
| corey.taggart@us.af.mil |
| ORG33/AFNWC/NIES |
| 6054 Dogwood Ave Bldg 1255 |
Hill AFB UT 84056
| Data Management |
| afnwc.nies.datamgmtoffice@us.af.mil |
10. CDRL Master Listing Index Full 1423’s for CDRL’s applicable to this program are included in section 11 of this document.
| A001 |
| Integrated Program Management Report (IPMR) |
| DI-MGMT-81861 |
| A002 |
| Conference Agenda (Meeting Agenda) |
| DI-ADMN-81249 |
| A003 |
| Briefing Material |
| DI-MGMT-81605 |
| A004 |
| Report, Record of Meeting/Minutes |
| DI-ADMN-81505 |
| A005 |
| Statement of Work (SOW) |
| DI-MGMT-81606 |
| A006 |
| Contract Work Breakdown Structure |
| DI-MGMT-81334 |
| A007 |
| Program Management Plan |
| DI-MGMT-81797 |
| A008-1 |
| Work Management Plan (DEMIL/Disposal Plan) |
| DI-MGMT-81911 |
| A008-2 |
| Work Management Plan (Transition Plan) |
| DI-MGMT-81911 |
| A008-3 |
| Work Management Plan (Scope Management Plan) |
| DI-MGMT-81911 |
| A008-4 |
| Work Management Plan (Manual Procedures) |
| DI-MGMT-81911 |
| A008-5 |
| Work Management Plan (Capabilities Maturity Model Index Plan) |
| DI-MGMT-81911 |
| A010 |
| Contractor’s Risk Management Plan |
| DI-MGMT-81808 |
| A011 |
| Supplier's Configuration Management Plan |
| DI-SESS-80858 |
| A012 |
| Contractor’s Corrective Action Plan |
| DI-MGMT-80501 |
| A013 |
| Corrosion Prevention and Control Plan |
| DI-MFFP-81403 |
| A014 |
| Counterfeit Prevention Plan |
| DI-MISC-81832 |
| A015-1 |
| Quality Assurance Program Plan |
| DI-QCIC-81794 |
| A015-2 |
| Quality Assurance Program Plan (Software Quality Assurance Plan) |
| DI-QCIC-81794 |
| A016 |
| Implementation Plan |
| DI-MGMT-81737 |
| A018 |
| Contract Funds Status Report (CFSR) |
| DI-MGMT-81468 |
| A019 |
| Contract Summary Report |
| DI-ADMN-80447 |
| A020 |
| Performance and Cost Report |
| DI-FNCL-80912 |
| A022 |
| Funds and Labor Hour Expenditure Report |
| DI-FNCL-81537 |
| A026 |
| Status Report |
| DI-MGMT-80368 |
| A027 |
| Product Drawings/Models and Associated Lists |
| DI-SESS-81000/T |
| A030 |
| Specification Change Notice (SCN) |
| DI-SESS-80643 |
| A031 |
| Engineering Change Proposal (ECP) |
| DI-SESS-80639 |
| A032 |
| Interface Control Document (ICD) |
| DI-SESS-81248 |
| A033 |
| System/Subsystem Specification |
| DI-IPSC-81431 |
| A034 |
| Master Engineering Document Lists (MEDL) |
| DI-MISC-82127 |
| A035 |
| Deficiency Report (DR) |
| DI-PSSS-81535 |
| A036 |
| Request for Nomenclature (DD Form 61) |
| DI-SESS-81254 |
| A037 |
| Request for Variance (RFV) |
| DI-SESS-80640 |
| A040 |
| Computer Software Product End Item |
| DI-AVCS-80700 |
| A041 |
| Software Development Plan (SDP) |
| DI-IPSC-81427 |
| A042 |
| Software Requirements Specification (SRS) |
| DI-IPSC-81433 |
| A044 |
| Software Design Description (SDD) |
| DI-IPSC-81435 |
| A046 |
| Software Test Plan (STP) |
| DI-IPSC-81438 |
| A047 |
| Software Test Description (STD) |
| DI-IPSC-81439 |
| A048 |
| Software Test Report (STR) |
| DI-IPSC-81440 |
| A049 |
| Software Product Specification (SPS) |
| DI-IPSC-81441 |
| A050 |
| Software Version Description (SVD) |
| DI-IPSC-81442 |
| A054 |
| Automated Computer Program Identification Number (ACPIN) Data and Control Record |
| DI-MISC-81454 |
| A055 |
| System Engineering Management Plan (SEMP) |
| DI-SESS-81785 |
| A057 |
| Technical Report – Study/Services (Test and Evaluation Master Plan) |
| DI-MISC-80508/T |
| A058 |
| Technical Report – Study/Services (Trade Studies) |
| DI-MISC-80508/T |
| A059 |
| Technical Report – Study/Services |
| DI-MISC-80508/T |
| A059-1 |
| Technical Report – Study/Services (Identify Items Not Listed) |
| DI-MISC-80508/T |
| A059-2 |
| Technical Report - Study/Services (Transactions Affecting NWRM) |
| DI-MISC-80508/T |
| A059-3 |
| Technical Report - Study/Services (Root Cause Analysis) |
| DI-MISC-80508/T |
| A059-4 |
| Technical Report - Study/Services (Completion of Employee Training Report) |
| DI-MISC-80508/T |
| A059-5 |
| Technical Report - Study/Services (Security Assessment) |
| DI-MISC-80508/T |
| A059-6 |
| Technical Report - Study/Services (Quality Report) |
| DI-MISC-80508/T |
| A059-7 |
| Technical Report - Study/Services (Software Analysis) |
| DI-MISC-80508/T |
| A059-8 |
| Technical Report - Study/Services (Trending Analysis) |
| DI-MISC-80508/T |
| A059-9 |
| Technical Report - Study/Services (Data Book) |
| DI-MISC-80508/T |
| A059-10 |
| Technical Report - Study/Services (Close Loop Failure Analysis) |
| DI-MISC-80508/T |
| A059-11 |
| Technical Report - Study/Services (Weapon System Assessment) |
| DI-MISC-80508/T |
| A059-12 |
| Technical Report - Study/Services (Aging Surveillance Assessment) |
| DI-MISC-80508B/T |
| A059-13 |
| Technical Report - Study/Services (Weapon System Effectiveness Report (WSER)) |
| DI-MISC-80508B/T |
| A059-14 |
| Technical Report - Study/Services (Requirements Development and Analysis) |
| DI-MISC-80508B/T |
| A059-15 |
| Technical Report - Study/Services (Metrics to inclue Mean Time to Repair (MTTR), Meant Time Between Failures (MTBF), and Inherent Availability) |
| DI-MISC-80508B/T |
| A059-16 |
| Technical Report - Study/Services (SACCS Trouble Monitor report Analysis (STMR)) |
| DI-MISC-80508B/T |
| A059-17 |
| Technical Report - Study/Services (Analytical Assessment and Evaluation) |
| DI-MISC-80508B/T |
| A059-18 |
| Technical Report - Study/Services (Service Life Extension (SLE) Study) |
| DI-MISC-80508B/T |
| A059-18 |
| Technical Report - Study/Services (Feasibility Study) |
| DI-MISC-80508B/T |
| A059-19 |
| Technical Report - Study/Services (Power and Grounding Study Study) |
| DI-MISC-80508B/T |
| A059-20 |
| Technical Report - Study/Services (Mitigation Strategy Options) |
| DI-MISC-80508B/T |
| A059-21 |
| Technical Report - Study/Services (Problem Log) |
| DI-MISC-80508B/T |
| A059-22 |
| Technical Report - Study/Services (Watch List Report) |
| DI-MISC-80508B/T |
| A059-23 |
| Technical Report - Study/Services (Non-availability Report) |
| DI-MISC-80508B/T |
| A059-24 |
| Technical Report - Study/Services (Temporary Fix) |
| DI-MISC-80508B/T |
| A059-25 |
| Technical Report - Study/Services (Quick Look Report) |
| DI-MISC-80508B/T |
| A060 |
| Test Plan |
| DI-NDTI-80566 |
| A061 |
| Test Procedure |
| DI-NDTI-80603 |
| A062 |
| Test/Inspection Report |
| DI-NDTI-80809 |
| A065 |
| System Safety Program Plan (SSPP) |
| DI-SAFT-81626 |
| A066 |
| System Safety Hazard Analysis Report (SSHAR) |
| DI-SAFT-80101 |
| A067 |
| Safety Assessment Report (SAR) |
| DI-SAFT-80102 |
| A068 |
| Safety Studies Plan |
| DI-SAFT-81066 |
| A069 |
| Safety Studies Report |
| DI-SAFT-81065 |
| A071 |
| Accident/Incident Report |
| DI-SAFT-81563 |
| A072 |
| Work Management Plan (Safety Plan (Appendix C)) |
| DI-MGMT-81911 |
| A074 |
| Programmatic Environmental Safety and Health Evaluation (PESHE) Plan |
| DI-ENVR-81840 |
| A075 |
| Technical Report- Study/Services (NEPA) |
| DI-MISC-80508/T |
| A076 |
| Finish Specification |
| DI-MFFP-81402 |
| A077 |
| Aircraft Nuclear Safety Analysis Report (NSAR) |
| DI-NUOR-81405/T |
| A078 |
| Certification Requirements Plan (CRP) |
| DI-NUOR-81409 |
| A079 |
| Engineering Evaluation Report (EER) |
| DI-NURO-81411 |
| A080 |
| Nuclear Certification Impact Statement (NCIS) |
| DI-NUOR-81888 |
| A081 |
| Technical Report – Study/Services (Nuclear Surety Evaluation Report (NSER) |
| DI-MISC-80508/T |
| A082 |
| Electromagnetic Interference Control Procedures (EMICP) |
| DI-EMCS-80199 |
| A083 |
| Electromagnetic Interference Test Procedures (EMITP) |
| DI-EMCS-80201 |
| A084 |
| Electromagnetic Interference Test Report (EMITIR) |
| DI-EMCS-80200 |
| A089 |
| Nuclear Hardness and Survivability (NH&S) Program Plan |
| DI-ENVR-82097 |
| A090 |
| Nuclear Hardness and Survivability (NH&S) Design Analysis Report |
| DI-ENVR-80266 |
| A091 |
| Preservation & Packing Data |
| DI-PACK-80120/T |
| A092 |
| Special Packaging Instructions (SPIs) |
| DI-PACK-80121/T |
| A093 |
| Container Design Retrieval System (CDRS) Search Request |
| DI-PACK-80683 |
| A094 |
| Container Design retrieval System (CDRS) Data Input |
| DI-PACK-80684 |
| A095 |
| Performance Oriented Packaging Test Report |
| DI-PACK-81059 |
| A099 |
| Commercial Asset Visibility Air Force (CAV AF)/ Government Furnished Material Report |
| DI-MGMT-81634 |
| A101 |
| Failure Summary and Analysis Report |
| DI-SESS-80255 |
| A102 |
| Failure Modes, Effects, and Criticality Analysis Report (FMECA) |
| DI-SESS-81495 |
| A103 |
| Item Unique Identification (IUID) Marking Plan |
| DI-MGMT-81803 |
| A104 |
| Item Unique Identification (IUID) Marking Activity, Validation and Verification Report |
| DI-MGMT-81804 |
| A105 |
| Information Systems Accreditation Documentation |
| DI-ADMN-80239 |
| A106 |
| Naval Aviation Program Protection Implementation Plan |
| DI-MGMT-82144/T |
| A107 |
| Training Materials |
| DI-ILSS-80872 |
| A108 |
| Status of Government Furnished Equipment (GFE) Report |
| DI-MGMT-80269 |
| A109 |
| Commercial Off-the-Shelf (COTS) Manuals and Associated Supplemental Data |
| DI-TMSS-80527 |
| A110 |
| Technical Manual contract Requirement (TMCR) |
| TM 86-01 |
| A111 |
| Data Accession List (DAL) |
| DI-MGMT-81453 |
| A112 |
| Report of Receipts, Inventory, Adjustments, and Shipments of Government Property |
| DI-MGMT-80442 |
| A113 |
| Report of Shipping (Item) and Packaging Discrepancy |
| DI-MGMT-80503 |
| A114 |
| Real Property Inventory Detail List |
| DI-MGMT-80213 |
| A115 |
| NAVAIR Cybersecurity Implementation Plan |
| DI-MGMT-82002/T |
| A116 |
| System Assessment Report (SAR) |
| DI-MGMT-80469 |
| A117 |
| Cybersecurity Vulnerability Report |
| DI-MGMT-82191 |
| A118 |
| Software Quality Assurance Report |
| DI-QCIC-81795 |
| A119 |
| Mathematical Model Finite Element Analysis Report |
| DI-GDRQ-81257 |
| A120 |
| Critical Items List |
| DI-RELI-80685 |
| A121 |
| Risk Management Status Report |
| DI-MGMT-81809 |
| A122 |
| Parts, Materials, and Processes Selection List (PMPSL) |
| DI-MISC-81277 |
| A123 |
| Integrated Logistics Support Plan |
| DI-ILSS-80095 |
| A124 |
| Hardness Data Manual (HDM) Update |
| DI-ENVR-82096 |
| A125 |
| Time Compliance Technical Order (TCTO) Reporting |
| DI-MGMT-81325 |
| A126 |
| Small Business Subcontractor Report |
| DI-MGMT-81642 |
| A127 |
| Bill of Materials (BOM) for Logistics and Supply Chain Risk Management |
| DI-PSSS-81656 |
| A128 |
| Site Survey Report (SSR) |
| DI-MISC-82104 |
| A129 |
| Contractor’s Progress, Status and Management Report |
| DI-MGMT-80227 |
| A130 |
| Baseline Description Document |
| DI-SESS-81121 |
| A131 |
| Department of Defense (DoD) Modeling and Simulation (M&S) Verification and Validation (V&V) Plan |
| DI-MSSM-81751 |
| A132 |
| Department of Defense (DoD) Modeling and Simulation (M&S) Verification and Validation (V&V) Report |
| DI-MSSM-81752 |
| A133 |
| Performance Specification Documents |
| DI-SDMP-81465 |
| A134 |
| Repair Procedure |
| DI-MGMT-81910 |
| A135 |
| System Problem Report – SPR |
| DI-MGMT-81232 |
| A136 |
| Equipment Inventory Records (EIRS) |
| DI-ILSS-81251 |
| A137 |
| Trip/Travel Report |
| DI-MISC-81943 |
| A138 |
| Integrated Production Schedule (IPS) Report |
| DI-MGMT-82075 |
| A139 |
| Contract Field Service Report |
| DI-MGMT-81238 |
| A140 |
| Maintenance Service Report |
| DI-MGMT-80995 |
| A141 |
| Operations Security (OPSEC) Plan |
| DI-MGMT-80934 |
| A142 |
| Naval Aviation Supply Chain Risk Management (SCRM) Process |
| DI-MGMT-82147/T |
| A143 |
| Customized Microelectronics Devices Source Protection Plan |
| DI-MGMT-81763 |
| A144 |
| Security Verification Plan and Procedures |
| DI-QCIC-81689 |
| A145 |
| Security Evaluation Document (SED) |
| DI-MISC-81762 |
| A146 |
| Source/Vendor List |
| DI-MGMT-80894 |
| A147 |
| Government Industry Data Exchange Program (GIDEP) Alert/Safe-Alert Report |
| DI-QCIC-80125 |
| A148 |
| Security Vulnerability Analysis |
| DI-MISC-80841 |
| A149 |
| Survivability Analysis Report |
| DI-MISC-80564 |
11. DD Form 1423s (full 1423’s) *1423’s, block A Reference Number: CLIN number to be added at time of award **1423’s block E Reference Number: Contract and Mod/TO number to be added at time of award
CONTRACT DATA REQUIREMENTS LISTLM 18-37
(1 Data Item) Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0
FA8204-19-R-0001
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
A001
INTEGRATED PROGRAM MANAGEMENT REPORT (IPMR)
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-81861/T |
| PWS Para TBD |
| AFNWC/NIAG |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
b. COPIES
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
Reg
Repro
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 4:
0. All formats shall be submitted electronically in accordance with the DoD-approved XML schemas located in the EVM Central Repository (EVM-CR) http://cade.osd.mil/tools/evm-tools.
| 2. | All IPMR files must be electronically forwarded to the EVM-CR at the DCARC Web site at https://service.cade.osd.mil/DCARCPortal. |
| 3. | Only Formats 1, 4, 5, 6, and 7 are required. (Format 7 required only if program is greater than $20M) |
| 4. | Formats 1 4, & 6 shall be submitted using the DoD-approved cost XML guideline and schema. |
| 5. | Formats 5 shall be submitted in contractor format. |
| 6. | Format 7 shall be submitted using the DoD-approved time-phased cost SML guideline and schema only when program is great than $20M. |
| 7. | IPMRs, when required from subcontractors, will be provided electronically using the DoD-approved SML formats. |
| 8. | Format 1 Instructions: Work Breakdown Structure (WBS) elements shall be reported in accordance with the PMO approved contractually required WBS. This is also known as the “Reporting Level.” |
· The Government reserves the right, with prior notice, to request, if available, temporary visibility into WBS elements one level below the contractual WBS>
· Only ACWP, BAC, EAC, BCWWS, BCWP, SV, CV and VAC are required to be filled out for reporting purposes to the Government.
| 9. | Format 2 Instructions: Not Required. |
| 10. | Format 3 Instructions: Not Required. |
| 11. | Format 4 Instructions: |
EVM-CR
ORG1 (Lt of delivery only)
ORG2 (Lt of delivery only)
ORG32 (Lt of delivery only)
ORG33 (Lt of delivery only)
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
See digital signature
DD Form 1423-1, FEB 2001 Page___1__of__2_ Page
CONTRACT DATA REQUIREMENTS LISTLM 18-37
Form Approved
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| A |
| TDP X TM OTHER _____ ____ |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0
16. REMARKS (Continued): CDRL A001 Continued.
· Significant changes that require explanations in Format 5 are those that change the absolute value of the projected total staff-months at completion of any organizational or functional category by more than =/-5%.
· Staffing forecast should be by month for the next six months and quarterly thereafter.
12. Format 5 Instructions:
· Format 5 shall address major accomplishments and tasks worked during the month along with major barriers to accomplishing the planned work.
· The variance analysis thresholds are:
· 10% and $25K for current period variances.
· 5% and $100K for cumulative cost variances.
· 5% for at complete variances.
· Narrative explanations required and variance thresholds will be reviewed periodically and may be adjusted by contract modification with no change to contract price.
· Variance analysis narratives shall be reported at the reporting level as determined by the WBS level on Format 1. The narratives also shall:
· Quantify and explain the root cause of the variance and account for at least the majority of the variance amount exceeding the threshold.
· Specific corrective actions, forecasted closure date, and impact to the Estimate at Completion (EAC) shall be included in each variance narrative.
· If there are no changes to the reportable element problem analysis, the expected impacts, or corrective action status, then specify, “no changes since the last reported analysis” and reference the IPMR date when the narrative was reported.
| 13. | Format 6 Instructions: Monthly |
| 14. | Format 7 Instructions: Work Breakdown Structure (WBS) elements shall be reported in accordance with the PMO approved contractually required WBS (BCWS, BCWP, ACWP, SV, CV, BAC, EAC, & VAC). |
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Initial Submittal:
Contractor shall submit initial Integrated Program Management Report (IPMR) (Formats 1, 4, 5, 6, & 7) NLT 12th day after the end of the second full accounting period following authorization to proceed (ATP).
Subsequent Submittals:
Contractor shall submit subsequent IPMR, containing the required Formats, NLT 20th business day of each month thereafter. Format 7 is due annually, NLT 20 days after the end of the fiscal year. Final submissions are due when the last significant milestone/deliverable as defined by the contract has been achieved and remaining risk areas have been mitigated. Government will be allowed 10 days, after receipt from contractor, to review comments. Contractor shall submit revised IPMR incorporating Government comments, if applicable, on the following month’s IPMR.
BLOCK 14: Contractor shall submit letter of delivery of IPMR to TopVue https://icbm.topvue.com/topvue-icbm/
DD Form 1423-1, FEB 2001 Page___2__of___2__Page
CONTRACT DATA REQUIREMENTS LISTLM 18-37
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| CONFERENCE AGENDA |
| Meeting Agenda |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ADMN-81249 |
| PWS Para TBD |
| AFNWC/NIAG |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
b. COPIES
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
A
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Conference Agenda (Meeting Agenda), if applicable, NLT 5 days prior to scheduled meetings or meetings deemed necessary by the Government. Government will be allowed 2 days, after receipt from contractor, to review for approval/disapproval/ comments. Contractor shall submit revised Meeting Agenda incorporating Government comments, if applicable, NLT 2 days after receipt from Government.
BLOCK 14: Contractor shall submit Meeting Agenda to TopVue https://icbm.topvue.com/topvue-icbm/
ORG2 (Lt of delivery only)
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
CONTRACT DATA REQUIREMENTS LISTLM 18-37
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-81605 |
| PWS Para TBD |
| AFNWC/NIAG |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
b. COPIES
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
N/A
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Briefing Materials NLT 5 days prior to each scheduled meeting and/or any other meeting deemed necessary by the Government and as requested by the Government. Government will be allowed 2 days, after receipt from contractor, to review for comments. Contractor shall present corrected Briefing Materials incorporating Government comments, if applicable, NLT 2 days after receipt from Government.
BLOCK 14:
Contractor shall submit Briefing Materials to TopVue https://icbm.topvue.com/topvue-icbm/
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
CONTRACT DATA REQUIREMENTS LISTLM 18-37
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
A004
REPORT, RECORD OF MEETING/MINUTES
Meeting Minutes
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-ADMN-81505 |
| PWS Para TBD |
| AFNWC/NIAG |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
b. COPIES
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
A
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Report, Record of Meeting Minutes (Meeting Minutes) NLT 15 days after meeting or event has been held. Government will be allowed 5 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Minutes incorporating Government comments, if applicable, NLT 5 days after receipt from Government.
BLOCK 14: Contractor shall submit Meeting Minutes to TopVue https://icbm.topvue.com/topvue-icbm/
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
CONTRACT DATA REQUIREMENTS LISTLM 18-37
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A005 |
| STATEMENT OF WORK (SOW) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-81606 |
| PWS Para TBD |
| AFNWC/NIAG |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
b. COPIES
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
A
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Statement of Work (SOW) NLT the 30 days after contract award. Government will be allowed 15 days after receipt from contractor to review for approval/disapproval/comments. Contractor shall resubmit corrected SOW incorporating Government comments, if applicable, NLT 15 days after receipt from Government.
BLOCK 14: Contractor shall submit SOW to TopVue https://icbm.topvue.com/topvue-icbm/
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD Form 1423-1, FEB 2001 Page___1__of___1__Pages
CONTRACT DATA REQUIREMENTS LISTLM 18-37
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
A006
CONTRACT WORK BREAKDOWN STRUCTURE
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-81334 |
| PWS Para TBD |
| AFNWC/NIAG |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
b. COPIES
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
A
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Contract Work Breakdown Structure (CWBS) NLT 30 days after award of contract. Contractor shall submit updated CWBS annually per option period. Government will be allowed 30 days, after receipt from the contractor, to review for comments. Contractor shall submit revised CWBS incorporating Government comments, if applicable, NLT 15 days after receipt from Government.
BLOCK 14: Contractor shall submit CWBS to TopVue, https://icbm.topvue.com/topvue-icbm/.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
CONTRACT DATA REQUIREMENTS LISTLM 18-37
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
GROUND SUBSYSTEM SUPPORT CONTRACT (GSSC) 2.0
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A007 |
| PROGRAM MANAGEMENT PLAN |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED TOTAL PRICE
| DI-MGMT-81797 |
| PWS Para TBD |
| AFNWC/NIAG |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
LT
b. COPIES
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
Draft Final
A
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 4:
1. Delete paragraph 2.c. in its entirety.
BLOCK 9:
Distribution Statement D: (see paras 5.3 & 5.4 of instructions for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Contractor shall submit Program Management Plan NLT 30 days after award of contract. Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit updated Program Management Plan incorporating Government comments, if applicable, NLT 30 days after receipt from Government.
BLOCK 14: Contractor shall submit Program Management Plan to TopVue, https://icbm.topvue.com/topvue-icbm/
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
CONTRACT DATA REQUIREMENTS LISTLM 18-37
Form Approved
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
This is the start of the file's text. The full file is on GovTribe.