Drawing_Clarification_Document_1_June_2015.docx

DOCX document 15 KB Posted

Attached to
Renovation and Repair Building 238
Solicitation number
FA8201-15-R-RENO
Issued by

About this file

Drawing Clarification Document 1 June 2015

View the file

Other files

File Type Posted
FA8201-15-B-0001-0005.pdf PDF
Bid_Opening_Information.docx DOCX document
Q_and_A__2.docx DOCX document
Amendment_4.pdf PDF
08_33_13_Rolling_Counter_Doors_-_Hill_AFB.pdf PDF
Amendment_3.pdf PDF
KRSM238_142063_IFC_20150323_Combined_34x22(5-18-15).pdf PDF
QA_Responses_RENO.docx DOCX document
238_Pictures__4.zip ZIP file
238_Pictures__3.zip ZIP file
238_Pictures__2.zip ZIP file
238_Pictures__1.zip ZIP file
Building_238_Amendment_2.pdf PDF
238_Site_Visit_List.docx DOCX document
Building_238_Amendment_1.pdf PDF
FA8201-15-B-0001_Solicitation.zip ZIP file
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The reason for the IFB proposal due date extension is several typos in the drawings were discovered. They are as follows:

1. Drawing AE501 indicates that wall type 1 & 2 are calling for 16 ga structural studs. It should indicate that the gauge of the studs for these wall types 1 and 2 need not be 16 gauge. The studs may be 18 gauge. The characteristics of Fixed Facility SCIF Construction were inadvertently utilized. Notes from the client design meeting at the site reflect that these walls need only have two layers of 5/8” gypsum board with staggered joints, studs with insulation, then another layer of 5/8” gypsum board. This is typical for Wall Types 1 and 2.

2. Wall type 1 is a dividing walls on the 1st floor the full length of the project with expanded wire mesh. Wall Type 1 need not have the expanded metal at any location, including CONFERENCE ROOM 111. The characteristics of Fixed Facility SCIF Construction were inadvertently utilized.

3. On sheet S-502 on many details the ledger at the edge of the floor is a 3 x 3 ledger. It should read as using L3x3x1/4 on the upper level (no concrete) and use an L5x3x1/4 (LLV) on the floor level (with concrete).

Due to the time constraints, updated drawings with the above information will not be sent out but will be incorporated into the final contract before award.