RFI FA8107-14-R-0001
Questions & Answers
15 MAY 2014
1. Question: Please verify the following:
In 3.6.1 Unit Interface the document has the following requirement:
3.6.1. Unit Interface
The system installation must mate with the following connectors:
. PITOT connector (7/16-20UNF-3B) . STATIC connector (7/16-20UNF-3B) . ES27484T12F35S Electrical Plug (Deviations from the connector specified shall be entertained.)
It shows that the Pitot and Static have the same size connector. Generally, these are of a different size such that they cannot be mis-connected. Are these the correct connector requirements?
Government Response:
The correct pitot/static connections are as follows:
Pitot - 9/16-18UNJF-3B Static - 7/16-20UNJF-3B
The SRD will be changed to reflect this.
2. Question: Will provisions for material and tools, associated with over and above repairs, be added to CLIN 0006 or included on a separate CLIN?
Government Response:
Provisions for materials and tools will be added to CLIN 0006. Exact details are TBD.
3. Question: What is the meaning of “The contractor shall waive any/all data rights of intellectual property with regard to concepts, principles, and/or theory used in the design(s) submitted to the Government? (Reference SOW 1.7 Data Rights)
Government Response:
Government is updating SOW to remove this language from para. 1.7. See final SOW with official RFP for more information. SOW will be updated to reflect specific FAR & DFAR requirements.
4. Question: What is the security level; as a draft DD Form 254 was not provided? (Reference SOW 1.6 Security)
Government Response:
The Government has determined that no DD Form 254 will be required.
5. Question: What is the meaning of “The contractor shall waive any/all data rights of intellectual property with regard to concepts, principles, and/or theory used in the design(s) submitted to the Government? (Reference SOW 1.7 Data Rights)
RFI FA8107-14-R-0001
Questions & Answers
15 MAY 2014
Government Response:
Statement in 1.7 has been removed from the SOW. The SOW is being updated to reflect a more accurate interpretation of FAR data requirements. RFP clauses will reflect government requirements of data rights.
6. Question: What is the certification process for the firmware?
Government Response:
Industry certification of firmware will be acceptable. Proposal should reflect compliance with para 3.1.3 of SCAI SOW.
7. Question: Will there be a need for SSEC as part of the SCAI requirement? Does the aircraft need to be RVSM compliant?
Government Response:
There will be no RVSM requirement. There is no known SSEC requirement; however, a functional system must be provided.
SSEC = Static Source Error Correction RVSM = Reduced Vertical Separation Minimum