Appendix_A_-_SOW.pdf

PDF 102 KB Posted

Attached to
B-1B Self-Contained Attitude Indicator (SCAI)
Solicitation number
FA8107-14-R-0001
Issued by

About this file

Statement of Work

View the file

Other files

File Type Posted
FA810714R0001_______0005.RTF RTF text file
FA810714R0001_______0005_Appendix_D_Rev_1__Section_L__ITO.pdf PDF
FA810714R0001_______0004.RTF RTF text file
FA810714R0001_______0004_SCAI_SOW_Rev_1_30Jul2014.pdf PDF
FA810714R0001_______0003.RTF RTF text file
FA810714R0001_______0002.RTF RTF text file
FA810714R0001_______0001.RTF RTF text file
FA810714R0001_Appendix_B__SRD_Redacted.pdf PDF
FA810714R0001_Appendix_F__Pricing_Matrix.xlsx XLSX spreadsheet
FA810714R0001_ATTACHMENT_A__Warranty_Tracking_Information.pdf PDF
FA810714R0001_Appendix_G__CDRLS.pdf PDF
FA810714R0001.RTF RTF text file
FA810714R0001_Appendix_E__Section_M__Evaluation_Factors.pdf PDF
FA810714R0001_Appendix_D__Section_L__ITO.pdf PDF
FA810714R0001_Appendix_A__SOW.pdf PDF
FA810714R0001_Appendix_C__Safety_Specifications.pdf PDF
B1_SCAI_-_Questions_ _Answers_2_-_15_MAY_14.pdf PDF
B1_SCAI_-_Questions_ _Answers_2_-_15_APR_14.pdf PDF
SCAI_Pre-RFP_Q A_-_8_APR_14.pdf PDF
L5306182_(Web _Panel _Instrument_-_Center).pdf PDF
L5306180_(Panel_Assembly_Instrument_-_Center).pdf PDF
L5306181_(Panel _Instrument_-_Center).pdf PDF
LP0320024_(Design_Standard_Cutout).pdf PDF
SCAI_SRD_Draft_-_8_APR_14.pdf PDF
L5159404_(Pitot_and_Static_system_Installation).pdf PDF
SCAI_SOW_Draft-_8_APR_14.pdf PDF
SCAI_DD_254_Draft_-_8_APR_14.pdf PDF
SCAI_Pre-Solicitation_Tele-Conference_-_17_Mar_14_FINAL.pdf PDF
SCAI_Pre-Solicitation_Tele-Conference_-_17_Mar_14_FINAL.ppsx PPSX file
Appendix_A_-_Attachment_1_-_SRD.pdf PDF
FA810714R0001_DRAFT_No._1.pdf PDF
Appendix_E_-_Section_M_-_Evaluation_Factors.pdf PDF
Appendix_F_-_Pricing_Matrix.xlsx XLSX spreadsheet
Appendix_D_-Section_L-_ITO.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A

STATEMENT OF WORK (SOW)

For

B-1B Self-Contained Attitude Indicator (SCAI)

AFLCMC/WWNMA 13-04

DATE: February 4, 2014

Prepared by:

AFLCMC/WWNMA 13-04

3001 Staff Drive, Ste 2AB78A Tinker AFB, OK, 73145-3019

B-1B Self-Contained Attitude Indicator (SCAI) SOW

Table of Contents

1 SCOPE 1

1.1 General 1

1.2 Blank 1

1.3 Associate Contractor Agreements 1

1.4 Government Furnished Property (GFP) 1

1.5 Inspection and Acceptance 2

1.6 Security 2

1.7 Data Rights 2

1.8 Air Worthiness Certification 3

1.9 Safety 3

2 APPLICABLE DOCUMENTS 3

2.1 Referenced Documentation 3

2.2 Attachments to Statement of Work (SOW) 3

3 REQUIREMENTS 4

3.1 Engineering Requirements 4

3.2 Technical Reviews 6

3.3 Item Unique identification (IUID) 7

3.4 Packaging, Handling, Shipping, and Transportation 7

3.5 Warranty 7

3.6 Hazardous Waste Disposal 7

3.7 Mission Essential Services 7

3.8 Change Request 7

3.9 Change Evaluation 8

3.10 Program Management 8

3.11 Program Cost 8

3.12 Quality 8

4 Travel 8

Appendix A: Acronyms 9 ii

1 SCOPE

1.1 General

The Oklahoma City Air Logistics Center, B-1 System Program Office (SPO) requires replacement of the current B-1B standby flight instruments. The current Standby Altimeter, Standby Airspeed/Mach Indicator, and the Standby Attitude Indicator shall be replaced with a Self-Contained Attitude Indicator (SCAI). The SCAI shall be a single Line Replaceable Unit (LRU) that provides the same functionality and meets the same environmental specifications of the current B-1 standby instrumentation identified above. The Group B kit shall be defined as the SCAI single LRU. The Group A kit also referred to as SCAI aircraft installation kit shall be defined as parts or components permanently installed to support, secure, interconnect or accommodate the equipment in a Group B kit.

The following tasks apply to this Statement of Work (SOW): Technology Insertion, Systems Integration and Systems Engineering, Installation, Hardware, Test and Evaluation, and Technical Data Management.

This contract shall include qualification testing, SCAI installation design, design of a SCAI installation kit, aircraft kit proof, and development of technical data supplements and updates.

1.2 This Paragraph is intentionally left blank

1.3 Associate Contractor Agreements

The Contractor shall enter into an Associate Contractor Agreements (ACA) with the Boeing Company for any portion of the contract requiring joint participation in the accomplishment of the Government's requirement. Liability for the improper disclosure of any proprietary data contained in or referenced by any ACA shall rest with the parties to the agreement, and not the Government.

The contractor shall provide a copy of the ACA to the Government Contracting Officer.

At no time will the Government review or make comments on the ACA’s, as this is a contractor to contractor agreement. The Contractor is not relieved of any contract requirements or entitled to any adjustments to the contract terms because of a failure to resolve a disagreement with an associate contractor.

1.4 Government Furnished Property (GFP)

No Government Furnished Property (GFP) shall be furnished by the Government to accomplish the tasks identified in this SOW.

1.5 Inspection and Acceptance

Inspection and acceptance for both Group A and Group B kits shall be at source by DCMA. After DCMA acceptance, kits shall be delivered 6 months ARO to locations directed by the B-1B SPO SCAI Program Manager or by the Contracting Officer. A signed Material Inspection and Receiving Report, DD form 250, will constitute the acceptance document for kit/spare delivery. Supplies that do not conform to the contract requirements will be handled in accordance with FAR 52.246-2.

1.6 Security

The Contractor shall possess a facility clearance at the classification level indicated on the associated DD Form 254, Department of Defense (DoD) Contract Security Classification Specification.

1.7 Data Rights

All data (to include associated drawings, modification procedures, new and altered parts lists), shall be submitted to the government prior to implementation.

The government will own unlimited data rights to all data generated by this requirement. If not, contractor must state that in the proposal. All data shall be delivered with "Unlimited Rights" as defined by FAR Part 27 and Title 10 U.S.C. §2320. The contractor shall retain no intellectual property rights to the documentation delivered to the Government. The Contractor shall waive any/all rights of intellectual property with regard to concepts, principles, and/or theory used in the design(s) submitted to the Government. Data elements delivered to the Government shall include, but are not limited to:

Conceptual design drawings/models Developmental design drawings/models and associated lists Production drawings/models and associated lists Commercial drawings/models and associated lists Special Inspection equipment (SIE) drawings/models and associated lists Special Tooling (ST) drawings/models and associated lists Specifications Software documentation Special Packaging Instruction (SPI) documents, drawings/models and associated lists

Quality assurance provisions

1.8 Air Worthiness Certification

The Contractor shall provide the Airworthiness Plan, Airworthiness Risk Assessment for reportability determination (Configuration Control Board (CCB)), and the Modification Airworthiness Certification Criteria (MACC). The Contractor shall verify the certification criteria using the standards, method(s) of compliance and evidence of compliance as outlined in the MACC. The Contractor shall provide system engineering data and artifacts required for the MACC compliance. The data provided shall be updated and completed to include the results of flight test and any aircraft system impacts. This data shall be included as a Service Engineering Report. (CDRL B009 DI-MISC- 81384/T)

1.9 Safety

The Contractor shall prepare and submit a Safety Assessment Report (SAR) to ensure all system and operational hazards are identified, eliminated, or controlled and verified.

The Contractor shall use the most current version of MIL-STD-882 (Standard Practice for System Safety) to determine hazard probability and severity reporting thresholds.

(CDRL A008 DI-SAFT-80102B/T)

2 APPLICABLE DOCUMENTS

2.1 Referenced Documentation

The following documents are referenced for the performance of this effort. All referenced documents can be found at publically available websites.

• FAR 52.246-4, 52.246-5, 52-246-6, Inspection of Services Clauses

• MIL-STD-882, Standard Practice for System Safety

• DFARS clause 252.211-7003

• Mil STD 1787C, Aircraft Display Symbology

• Mil STD 210A, Atmosphere Models

• Mil STD 1472, Design Criteria Human Engineering

• ARINC 408, Casing and Mounting

• Mil-C-5541, Coating

• Mil-DTL-38999, Connectors

• MIL-STD-810B, Environmental Test Methods

• MIL-STD-461E, Electromagnetic Compatibility

• MIL-STD-464C, Electromagnetic Environmental Effects

• MIL-HDBK-516B Expanded, Airworthiness Certification Criteria

2.2 Attachments to SOW

• LP032-0024-0001, Design Standard Cutout

• System Requirements Document (SRD)

3 REQUIREMENTS

3.1 Engineering Requirements

3.1.1 The Contractor shall provide to the Government a SCAI that is a single LRU that is to be installed into the instrument panel. All parts and hardware necessary to provide for physical and functional incorporation of this LRU into the B-1B Aircraft shall also be provided. The LRU shall be capable of replacing the following standby instruments on the B-1B Aircraft into a single standby indicator:

• Standby Altimeter, NSN 6610-00-468-1958

• Standby Airspeed/Mach Indicator, NSN 6610-01-119-2298

• Standby Attitude Indicator, NSN 6610-01-182-9481

3.1.2 The SCAI design shall meet all requirements listed in the attached B-1 SCAI SRD.

3.1.3 The proposed LRU shall have a unit technology readiness level defined as a system that has completed development and has been “flight qualified” through test and demo in a flight environment similar to that of a B-1B.

3.1.4 The contractor shall design and develop a SCAI Group A kit that will interface into the existing B-1 Standby Instrumentation architecture. The proposed design shall incorporate a single LRU that can be installed in one of the three legacy instrument locations and does not require any alteration of the B-1 instrument panel structure (e.g. enlargement of existing instrument panel openings). The design shall provide for covering of the two holes left in the aircraft instrument panel by the vacated legacy instruments. The architecture shall not contain any known Diminishing Manufacturing Sources (DMS).

Mounting or adapter plates may be used for the installation; however they shall not project further than one-half inch from the instrument panel surface and cannot occlude the visibility or reach of any legacy instruments, indicators, or controls.

3.1.5 Engineering Installation data:

The contractor shall develop and deliver a Top Kit drawing that lists all components, component fabrication drawings, installation drawings, installation specifications, installation processes and installation instructions necessary to install and operationally checkout the SCAI. All sub-kit and associate lower tier data (component drawings, specifications, etc.) shall be delivered with the Top Kit drawing. (CDRL B001 DI-SESS-8000D/T)

3.1.6 Test data:

The contractor shall develop and deliver an Installation and Checkout Procedure, Flight Test Plan, Flight Test Procedure, and Flight Test Report. (CDRL A002 DI-

NDTI-80809B/T) (CDRL A00D DI-NDTI-80566A/T), (CDRL B004 DI-NDTI-

80603A/T)

3.1.7 Environmental Qualification Data:

The contractor shall develop and deliver a Qualification Report that identifies where, when, and how all SCAI dynamic and environmental qualification requirements identified in the SRD are met. (CDRL J038 DI-QCIC-81890/T)

3.1.8 Temporary Modification Package

The contractor shall develop and deliver a Temporary Modification package and support a temporary installation using both the Group B and the Group A kits for the purposes of flight test. Any design changes that result from the temporary kits testing shall be documented. The drawings, technical data, and kit build instructions shall reflect design changes required as a result of the temporary kits testing. (CDRL J019 DI-NDTI-81562/T)

3.1.9 Validation and Verification of Manuals

The contractor shall conduct and support a validation and verification of all flight and technical manuals updated during this effort.

3.1.10 Installation Kit Design

The contractor shall provide a proof of concept design that demonstrates that the Group A and Group B kits installation can be accomplished within 24 man-hours.

(CDRL B00K, DI-TMSS-80065/T)

3.1.11 Time Compliant Technical Order (TCTO) and Technical Order (TO) Source Data

The contractor shall provide source data sufficient to allow the government to generate a Routine TCTO for permanent installation of the SCAI. The contractor shall provide all source data required to update all B-1B flight and technical manuals affected by this modification. (CDRL B002, TM-86-01N/T)

3.1.12 Production

During the Production period of the contract, the contractor shall provide kit delivery and support as follows:

3.1.12.1 The contractor shall deliver production Group A and B kits and Group B kit spares needed for the B-1B fleet.

3.1.12.2 The contractor shall provide repair support for Group B equipment during the installation period.

3.1.12.3 The contractor shall provide technical support via telephone during the first two years of the installation period.

3.1.13 Training

The Contractor shall provide Knowledge Training (Type 1) that is adequate to give maintenance personnel a basic understanding of the theory of operation of SCAI. This Knowledge Training shall be adequate to provide for the development of sound SCAI troubleshooting skills by maintenance personnel.

This Knowledge Training shall be adequate to provide for the preparation of maintenance personnel for On the Job Training (OJT) for SCAI.

3.2 Technical Reviews

The contractor shall provide an EMD schedule that meets the following meetings/reviews:

• Post Award Conference, within 30 days ARO

• System Requirements Review (SRR), within 60 days ARO

• Preliminary Design Review (PDR), within120 days ARO

• Critical Design Review (CDR), within 60 days after PDR

• Flight Test Readiness Review (FTRR), within 60 days after approved CDR

• Functional Configuration Audit/Physical Configuration Audit (FCA/PCA), within 60 days after successful completion of FTRR

• 2 Technical Interchange Meetings (TIMs) as required

• Technical Order Guidance Conference

• Drawing Guidance Conference

The Contractor shall specify agenda items and provide briefing material with specific dates and locations. The contractor shall schedule an in-process review and a pre-publication review which will present all data identified and updated by this modification.

The contractor shall provide meeting Agenda/Minutes for each review. (CDRL A009, DI-

ADMIN-81249A/T), (CDRL A006, DI-ADMIN-81250A/T), (CDRL A007, DI-ADMN-

81373/T)

3.3 Item Unique identification (IUID)

The contractor shall comply with all requirements for Item IUID marking for all delivered items for which the Government unit acquisition cost is $5,000.00 or more. All efforts required by this SOW and contract, including the preparation of Engineering Change Proposals (ECP) or notification of marking deficiencies, serial number data reporting at end of contract and the actual marking of hardware, shall be included in the base contract price. The contractor shall submit an IUID Marking Activity and Verification Report documenting items which meet or exceed the acquisition cost minimum of

$5,000.00 (CDRL B00X, DI-MGMT-81804A/T).

3.4 Packaging, Handling, Shipping, and Transportation

The contractor shall be responsible for kits packaging, handling, shipping and transportation using industry standards. To facilitate installation, the kits shall be packaged with the appropriate parts, hardware, and a packing list of comprised material in each kit. The contractor shall be responsible for shipping kits to locations directed by the B-1B SPO SCAI Program Manager or by the Contracting Officer.

3.5 Warranty

If applicable, the contractor shall provide the terms and conditions of any warranty including but not limited to covering workmanship, parts, and labor. This information shall be submitted with the contractor’s proposal.

3.6 Hazardous Waste Disposal

During any contractor associated installation activities the contractor shall be responsible for hazardous waste disposal generated as a result of the contractor’s action and will be required to follow local state/base laws and regulations.

3.7 Mission Essential Services

Not Applicable.

3.8 Change Request

The contractor shall submit to the Government a Request for Change (RFC) for engineering changes and supporting documentation by which the change is described and suggested. RFC shall describe the changes and associated Contractor documents and data (if applicable) that are affected by the proposed engineering change. The RFC shall also describe a full impact analysis of the effect of the change on the logistics, interface, design, cost and schedule requirements. (CDRL C004, DI-CMAN-80639C/T)

3.9 Change Evaluation

Contractor-approved changes that adversely impact any of the conditions listed in paragraph 3.1 may require re-evaluation by the Government. Re-evaluation may include operational testing re-assessment or re-assessment of the logistics impact of the proposed change. The Procuring Contracting Officer (PCO) must approve changes and the design shall be verified to ascertain that the functional attributes and requirements specified in the baselined product definition information and is adequate for its intended purposes. The Government is not obligated to accept any changes that no longer meet the Government’s requirements as established by the change.

3.10 Program Management

The contractor shall provide monthly program status reports electronically. The reports shall include progress of each assigned task, discussion of key accomplishments, issues impacting delivery, areas for improvement, and anticipated schedule impacts.

(CDRL A00A, DI-MGMT-80368A/T)

3.11 Program Cost

The contractor shall report program cost during Engineering and Manufacturing Development (EMD) phase. The contractor shall use the Wide Area Work Flow (WAWF), a web-based application that utilizes email notifications and secure, digital signature to generate, capture, and process receipt and payment related information.

(CDRL A00A, DI-MGMT-80368A/T)

3.12 Quality

The contractor shall develop and maintain an effective quality assurance program to ensure a quality product is delivered IAW this SOW. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s Quality Program Plan (QPP) shall ensure that all requirements of the contract are being complied with. (CDRL J040, DI-QCIC-81722)

4 TRAVEL

Contractor will be authorized travel expenses consistent with the substantive provisions of the Joint Travel Regulation (JTR), FAR part 31 and Not-to-Exceed (NTE) the amounts specified in this contract. All necessary travel meeting the above criteria shall be submitted to PCO for approval no later than 5 business days prior to travelling.

Appendix A

Acronyms

ACA Associate Contractor Agreements CCB Configuration Control Board CDR Critical Design Review COC Certificate of Compliance COR Contract Officer Representative DMS Diminishing Manufacturing Sources DoD Department of Defense ECP Engineering Change Proposals EMD Engineering and Manufacturing Development FAR Federal Acquisition Regulation FCA Functional Configuration Audit FTRR Flight Test Readiness Review GFP Government Furnished Property IAW In Accordance With IUID Item Unique identification JTR Joint Travel Regulation LRU Line Replaceable Unit MACC Modification Airworthiness Certification Criteria NTE Not-to-Exceed OJT On the Job Training PCA Preliminary Configuration Audit PCO Procuring Contracting Officer PDR Preliminary Design Review QPP Quality Program Plan RFC Request for Change SAR Safety Assessment Report

SCAI

SOW

Self-Contained Attitude Indicator Statement of Work

SPO System Program Office SRD System Requirements Document SRR System Requirements Review TCTO Time Compliant Technical Orders TIM Technical Interface Meeting TRL Technology Readiness Level WAWF Wide Area Work Flow

1 SCOPE
2 APPLICABLE DOCUMENTS
3 REQUIREMENTS
3.1.1 The Contractor shall provide to the Government a SCAI that is a single LRU that is to be installed into the instrument panel. All parts and hardware necessary to provide for physical and functional incorporation of this LRU into the B-1B Aircra...
3.1.2 The SCAI design shall meet all requirements listed in the attached B-1 SCAI SRD.
3.1.3 The proposed LRU shall have a unit technology readiness level defined as a system that has completed development and has been “flight qualified” through test and demo in a flight environment similar to that of a B-1B.
3.1.4 The contractor shall design and develop a SCAI Group A kit that will interface into the existing B-1 Standby Instrumentation architecture. The proposed design shall incorporate a single LRU that can be installed in one of the three legacy instr...
Mounting or adapter plates may be used for the installation; however they shall not project further than one-half inch from the instrument panel surface and cannot occlude the visibility or reach of any legacy instruments, indicators, or controls.
3.1.5 Engineering Installation data:
3.1.6 Test data:
3.1.7 Environmental Qualification Data:
3.1.8 Temporary Modification Package
The contractor shall develop and deliver a Temporary Modification package and support a temporary installation using both the Group B and the Group A kits for the purposes of flight test. Any design changes that result from the temporary kits testing...
3.1.9 Validation and Verification of Manuals
The contractor shall conduct and support a validation and verification of all flight and technical manuals updated during this effort.
3.1.10 Installation Kit Design
The contractor shall provide a proof of concept design that demonstrates that the Group A and Group B kits installation can be accomplished within 24 man-hours. (CDRL B00K, DI-TMSS-80065/T)
3.1.11 Time Compliant Technical Order (TCTO) and Technical Order (TO) Source Data
The contractor shall provide source data sufficient to allow the government to generate a Routine TCTO for permanent installation of the SCAI. The contractor shall provide all source data required to update all B-1B flight and technical manuals affec...
3.1.12 Production
3.1.13 Training

4 TRAVEL

File details come from the government source that posted it. Updated .