Appendix_E-Evaluation_Factors_for_Award_-_DRAFT.pdf
PDF 206 KB Posted
- Attached to
- Request for Proposal Federal contract opportunity
- Solicitation number
- FA810614-R-0004
About this file
Appendix E to the RFP - Evaluation Factors
View the file
Other files for this federal contract opportunity
Show all 50
Request for Proposal has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
ADDENDUM TO FAR 52.212-2
EVALUATION FACTORS FOR AWARD
1.0. Source Selection (SS)
1.1. Basis for Contract Award
This acquisition will utilize Tradeoff Source Selection procedures, with technical proposals, to make an integrated assessment for a best value award decision.
Tradeoffs will be made only between past performance and price among those Offerors who have been determined technically acceptable. Award will be made to the Offeror who is deemed responsible in accordance with the Federal Acquisition Regulation (FAR) Part 9, as supplemented, whose proposal conforms to the solicitation’s requirements (to include all stated terms, conditions, representations, certifications, and all other information required by FAR 52.212-1 and its Addendum of this solicitation) and is judged, based on the evaluation factors, to represent the best value to the Government. This may result in an award to a higher rated, higher priced Offeror, where the decision is consistent with the evaluation factors, and the Source Selection Authority (SSA) reasonably determines that the superior past performance of the higher priced technically acceptable offer outweighs the price difference.
1.1.1. The SSA will base the source selection decision on an integrated assessment of proposals against all source selection criteria in the solicitation (described below).
While the Government Source Selection Evaluation Board (SSEB) and the SSA will strive for maximum objectivity, the Source Selection process, by its nature, is subjective and, therefore, professional judgment is implicit throughout the entire process.
1.1.2. This source selection is conducted in accordance with Federal Acquisition Regulation (FAR) Part 15.3, Contracting by Negotiation, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS), the Air Force Federal Acquisition Regulation Supplement (AFFARS), DoD Source Selection Procedures 04 Mar 2011, and Air Force Mandatory Procedures 5315.3. These regulations are available electronically at the Air Force (AF) FARSite, http://farsite.hill.af.mil
1.2. Number of Contracts to be Awarded:
The Government intends to select one contractor for this acquisition. However, the Government reserves the right not to award a contract at all, depending on the quality of the proposals, prices submitted, and the availability of funds.
1.3. Correction Potential of Proposals:
The Government will consider throughout the evaluation, the “correction potential” of any proposal aspect evaluated as “unacceptable”. The judgment of such “correction potential” is within the sole discretion of the Government. If an aspect of an Offeror's proposal not meeting the Government's requirements is not considered correctable, or if the amount and/or complexity of the corrections needed to meet the Government requirement requires a major proposal revision, the Offeror may be eliminated from the competitive range.
http://farsite.hill.af.mil/vffara.htm
1.4. Rejection of Offers
The Government may reject any evaluated proposal that fails to adequately address a significant portion of the requirement or contract terms and conditions. This may include rejection of a proposal that does not demonstrate an adequate understanding of the contract/program requirements and/or displays a fundamental lack of competence or failure to comprehend the complexity and risk of the program. All aspects/volumes of the proposals may be reviewed to ensure adequate resources to perform the proposed technical approach
1.5. Competitive Range Determination
During the evaluation process multiple competitive range determinations may be made that eliminate Offerors from the competition IAW FAR 15.505. The competitive range determination can be based on Factor 1 Technical, Factor 2 Past Performance, Factor 3 Price, or a combination of the three factors. A competitive range determination may eliminate Offerors based on their initial proposal evaluation results, after discussions (if necessary), prior to issuance of the Final Proposal Revision (FPR) request, or for efficiency. If Offerors are excluded from the competitive range they may request a debriefing IAW FAR 15.505.
1.6. Discussions
The Government intends to award without discussions, but reserves the right to conduct discussions if necessary. Therefore, it is imperative that Offerors submit their best terms initially. However, if during the evaluation period it is determined to be in the best interest of the Government to hold discussions, Offeror responses to Evaluation Notices (ENs) and the FPR will be considered in making the Source Selection decision. If a Request for FPR is issued, Offeror responses to ENs for Volume I (Technical), Volume III (Price), and Volume IV (Contract Documentation) must be incorporated in the FPR in order to be considered in the final evaluation. Failure to include EN responses in the FPR may result in a final “unacceptable” technical rating, or otherwise make your company ineligible for award. Offeror responses to ENs for Volume II (Past Performance) shall not be included in the FPR. Offeror responses to Past Performance ENs during discussions will automatically be considered in the final evaluation.
1.7. Reviews and Visits
The SSEB may conduct site visits during the evaluation phase to gather information for judging the Offeror’s potential for correcting deficiencies, quality of development of manufacturing practices/processes, or other areas useful in evaluating the offer. If conducted, the results will be assessed under the applicable factors/subfactors and will be used to validate and confirm the Offeror’s written proposal.
1.8 Solicitation Requirements (Terms and Conditions)
Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and Performance Work Statement (PWS) requirements, in addition to those identified as factors and subfactors. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable, and the proposal, therefore, ineligible for award. In the case that a discrepancy exists between 52.212-1- Instructions to Offerors (ITO) and 52.212-2-Evaluation Factors for Award, the evaluation criteria in 52.212-2-Evaluation Factors for Award will take precedence.
2.0. Evaluation Factors
2.1. Evaluation Factors and Subfactors
2.1.1. Evaluation factors used to evaluate each proposal:
Award will be made to the offeror proposing the combination of factors deemed most advantageous to the Government based upon an integrated assessment of the evaluation factors described below.
Factor 1: Technical
Subfactor 1: Phase-In/Transition Subfactor 2: Program Management Subfactor 3: Maintenance and Supply Support Subfactor 4: Tow Support
Factor 2: Past Performance Factor 3: Price
2.1.2. Relative Importance of Factors and Subfactors:
For this solicitation, technical acceptability is a prerequisite to the best value analysis and potential trade-off between Past Performance and Price. The Order of Importance is used to explain how the other factors will be traded off on technically acceptable proposals.
For all technically acceptable proposals, Factor 2 (Past Performance) will be evaluated on a basis approximately equal to Factor 3 (Price).
2.1.3. Evaluation Methodology:
The Government will evaluate all factors concurrently for all proposals. Initial ratings for all factors will be established for each offeror in determining the competitive range. The Government technical evaluation team will evaluate the technical proposals on a pass/fail basis, assigning ratings of Acceptable, or Unacceptable. The proposals shall be evaluated against the subfactors listed in paragraph 2.2 below. Past Performance will be evaluated as described in paragraph 2.3 below. Price will be evaluated as described in paragraph 2.4 below. The SSA will then assess the Past Performance ratings and Price for all technically acceptable offers to make an integrated assessment for a best value award decision.
2.2. Factor 1 – Technical
Each subfactor within the technical factor will receive one of the ratings described below based on the criteria listed below. Individual subfactor ratings will be used to determine the overall technical acceptability of each offeror. To be determined technically acceptable at the factor level, the Offeror must be rated acceptable in each subfactor. A final unacceptable subfactor assessment will determine an overall technical unacceptable rating. Only those proposals determined to be technically acceptable, either initially, or as a result of discussions, will be considered for award. The technical evaluation will also consider risk in determining overall acceptability. Risk pertains to the potential for unsuccessful contract performance. Risk will not receive a separate rating, rather, it will be inherent within the subfactor ratings, and the overall Technical rating.
Rating Description Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
2.2.1. Subfactor 1: Phase-In/Transition
The Government will assess the Offeror’s proposed Phase-in/Transition approach.
Offerors are required to present all the information as stated in the Instruction to Offerors (ITO), Addendum to FAR 52.212-1. The subfactor minimum is met when the Offeror’s proposal indicates an adequate understanding of the requirements, and provides convincing rationale of how their approach will meet the requirements for all of the following essential components with little potential for disruption of schedule, increased cost or degradation of performance:
a. An approach to manage and accomplish contract phase-in/transition, which ensures the contractor will successfully meet all requirements of the PWS paragraphs 1.20,1.20.1,1.25,1.39,1.39.1, 3.1.1, and 3.1.1.1 with no disruption of mission support for the USAF Academy fleet.
b. A detailed milestone plan which ensures a seamless phase-in/transition to fully support the requirements of the contract in accordance with PWS paragraphs 1.39 and all subsequent paragraphs.
2.2.2 Subfactor 2: Program Management
The Government will assess the Offeror’s proposed Program Management approach.
Offerors are required to present all the information as stated in the Instruction to Offerors (ITO), Addendum to FAR 52.212-1. The subfactor minimum is met when the Offeror’s proposal indicates an adequate understanding of the requirements, and provides convincing rationale how their approach will meet the requirements for all of the following essential components with little potential for disruption of schedule, increased cost or degradation of performance:
a. A program management plan which ensures the support of the entire scope of the effort is met in accordance with PWS paragraphs 1.20.2, 1.21.2, 1.30, 1.31, 1.31.1 1.31.2, and Attachment E.
b. An approach which indicates an adequate awareness and understanding of applicable standards for sustainment of USAFA fleet which ensures all work described in the PWS can be successfully accomplished in accordance with both U.S. Air Force and FAA standards.
2.2.3. Subfactor 3: Maintenance and Supply Support
The Government will assess the Offeror’s proposed Maintenance and Supply Support approach. Offerors are required to present all the information as stated in the Instruction to Offerors (ITO), Addendum to FAR 52.212-1. The subfactor minimum is met when the Offeror’s proposal indicates an understanding of the requirements, and provides rationale as to how your approach will meet the requirements for all of the following essential components with little potential for disruption of schedule, increased cost or degradation of performance:
a. The approach shall ensure the requirements of PWS paragraph1.6.8 are met.
b. An effective approach to procure, issue, replenish, maintain, and manage all material, parts and components for CLS of the Academy fleet which ensures the Mission Capable rates required by the PWS paragraph 1.2 and PWS Table 1-2 are met.
c. Approach to manage Contractor Operated and Maintained Base Supply (COMBS) to include parts obsolescence and Diminishing Manufacturing Sources and Material Shortage as well as an approach to procure, issue, replenish, maintain, and manage all material, parts and components of Government Furnished Property/Equipment which ensures the PWS paragraphs 1.18, 1.18.1.1, 1.18.2,
1.18.2.1 and 3.1 are met.
d. An approach to maintain the entire USAF Academy fleet in accordance with FAA and Air Force Regulations which ensures PWS paragraphs 1.3, 1.28, and 1.40 are met.
2.2.4. Subfactor 4: Tow Support Services
The proposal shall describe in detail a sound and effective, feasible plan to provide proven tow aircraft and pilots to meet the PWS requirements and meet tow rates requirements for main operating base and deployed locations. Offerors are required to present all the information as stated in the Instruction to Offerors (ITO), Addendum to FAR 52.212-1. The subfactor minimum is met when the Offeror’s proposal indicates an understanding of the requirements, and provide rationale as to how your approach will meet the requirements for all of the following essential components with little potential for disruption of schedule, increased cost or degradation of performance:
a. The approach shall list the type and performance capabilities of Tow aircraft being used for this requirement. Proposed aircraft must be capable of meeting the requirements as outlined in PWS 1.27.2 and 1.27.2.1.
b. The approach must ensure Tow pilots meet all the qualifications and certifications in accordance with14 CFR Part 61, Section 61.69 and PWS paragraphs1.27.1.1 and 1.27.1.2.
2.3. Factor 2 – Past Performance:
The Past Performance evaluation assesses the degree of confidence the Government has in an offeror’s ability to supply products and services that meet users’ needs, including cost and schedule, based on a demonstrated record of performance.
2.3.1. Ratings:
The Past Performance factor will receive one of the following performance confidence assessments described in the Department of Defense (DoD) Source Selection Procedures, paragraph 3.1.3.3, Table 5 – Performance Confidence Assessments:
Note: With regards to the best value award decision, all offerors rated as “Satisfactory Confidence” will be considered equal for the Past Performance Factor.
TABLE 5- PERFORMANCE CONFIDENCE ASSESSMENTS
Rating Description
SATISFACTORY
CONFIDENCE
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
LIMITED CONFIDENCE
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
NO CONFIDENCE
Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
UNKNOWN
CONFIDENCE
(Neutral)
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
2.3.2. Evaluation Process:
The Past Performance evaluation considers the offeror’s demonstrated record of performance in providing products and services that meet the contract requirements as outlined in the proposed solicitation. Performance confidence is assessed at the overall Past Performance factor level after evaluating aspects of the offeror’s recent past performance, focusing on performance that is relevant to the Technical subfactors and Price assessment. More relevant performance may have a greater impact on the Performance Confidence Assessment than less relevant effort. More recent performance may have a greater impact on the Performance Confidence Assessment than less recent performance. The Government may consider past performance in the aggregate in addition to on an individual contract basis. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance proposal volume and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems, Defense Contract Management Agency (DCMA) and commercial sources. The Government reserves the right to use all information available to fully assess the offeror’s past performance.
2.3.2.1. Recency Assessment:
An assessment of the past performance information will be made to determine if it is recent. To be recent, the effort must have been performed during the past three years from the date of issuance of this solicitation. If any part of the performance falls within the above timeframe, the contract in its entirety may be evaluated for past performance.
Past performance information that fails this condition will not be evaluated.
2.3.2.2. Relevancy Assessment:
The Government will conduct an in-depth evaluation of all recent performance information obtained to determine how closely the products provided/services performed under those contracts relate to the Technical subfactors and Price assessment. Consideration will be given to things such as similar service, similar complexity of the effort, breadth and depth of skills, similar contract scope and type, contract magnitude and schedule. A relevancy determination of the Offeror’s (including joint venture partner(s) and major and critical subcontractor(s)), as defined in paragraph
4.3.3 of Addendum to FAR 52.212-1) past performance will be made based upon the aforementioned considerations. In determining relevancy for individual contracts, consideration will be given to the effort, or portion of the effort, being proposed by the Offeror, teaming partner, or subcontractor whose contract is being reviewed and evaluated. The Government will consider the portion of the effort accomplished on previous/current contracts compared to the portion to be performed on the proposed effort. For example: Past Performance for a subcontractor for Program Management will only be considered if that same subcontractor is to perform Program Management on the proposed effort.
The past performance information forms contained in ITO Attachments of FAR 52.212-1 Addendum and information obtained from other sources will be used to establish the degree of relevancy of past performance. The Government will use the following degrees of relevancy described in the DoD Source Selection Procedures, paragraph 3.1.3.1, Table 4, when assessing recent and relevant contracts:
Degree Description
RELEVANT
(R)
Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
SOMEWHAT RELEVANT
(SR)
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
NOT RELEVANT
(NR)
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
The Academy operates out of two Main Operating Bases (MOB), U.S. Air Force Academy and Peterson AFB. CLS support includes aircraft and mission systems maintenance, capability to provide depot-level repair, Contractor Operated and Maintained Base Supply (COMBS) operation, spare parts acquisition, component overhaul/repair (including engines), recurring engineering and technical services, and support equipment maintenance. Scope, magnitude and complexity will be assessed based on the prime or subcontractor/teaming partners proposed role or effort as it relates to the past performance effort. The Government may or may not utilize all or some of the following to determine the elements examined within scope, magnitude, complexity, and price.
Scope: Relevancy in regard to scope may be assessed based on, but not limited to the similarities between a given Past Performance effort and the Academy Contractor Logistics Support (CLS) requirement. Consideration may be given to the following elements when determining relevancy with regard to scope:
1. Scheduled and unscheduled upkeep maintenance to include depot support for for seven different commercial derivative aircraft.
2. Supply chain management at two sites, USAFA and Peterson AFB, (Contractor Operated and Maintained Supply, (COMBS))
3. Tow services for glider fleets.
4. Over and Above (deployment support, aircraft repairs etc).Aircraft modifications
Magnitude: Relevancy in regard to magnitude may be assessed based on, but not limited to, the similarities between a given Past Performance effort and the Academy CLS requirement. Consideration may be given to the following elements when determining relevancy with regard to magnitude:
1. Dollar value of parts managed
2. Personnel skill type/level
3. Engine type,
4. Type of mission systems maintained
5. Contract type/value. Generally, efforts of less than $100,000 will not be considered relevant unless such efforts, when combined, comprise a significant amount of work. (Example: multiple overhaul contracts under $100,000 on a large Indefinite Delivery Indefinite Quantity (IDIQ) contract).
Complexity: Relevancy in regard to complexity may be assessed based on, but not limited to, the similarities between a given Past Performance effort, technical subfactors, and the Academy CLS requirement. Consideration may be given to the following elements when determining relevancy with regard to complexity:
1. Labor category utilized
2. Aircraft type
3. Level of maintenance (i.e. depot, intermediate and organizational)
4. Types of mission systems maintained
5. Level of technical/engineer support
6. Level of supply chain management/support (i.e.value and quantities of parts managed)
Price Assessment Past Performance Relevancy: Relevancy in regard to price will be assessed primarily based on similarity between contract type (i.e. Firm-Fixed-Price (FFP), Cost, Time and Materials (T&M)) of previous effort as compared to the Academy CLS requirement.
2.3.2.3. Performance Quality Assessment:
The Government will consider the performance quality of recent, relevant efforts. The quality assessment consists of an in-depth evaluation of the past performance questionnaire responses, PPIRS information, Contractor Performance Assessment Reports (CPARS), interviews with Government customers and fee determining officials and, if applicable, commercial clients. It may include interviews with DCMA officials or other sources known to the Government. The quality assessment may result in positive or adverse findings. Adverse is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comment received from sources without a formal rating system. For adverse information identified, the evaluation will consider the number and severity of the problem(s), mitigating circumstances, and the effectiveness of corrective actions that have resulted in sustained improvements when determining the quality assessment. Taking mitigating corrective actions may or may not result in a higher quality rating. Process changes will only be considered when objectively measurable improvements in performance have been demonstrated. The Government will use the following quality levels when assessing recent and relevant efforts:
Quality Assessment Description
SATISFACTORY (S)
(GREEN)
During the contract period, contractor performance is meeting (or met) all contract requirements. For any problems encountered, contractor took effective corrective action.
MARGINAL (M)
(YELLOW)
During the contract period, contractor performance is not meeting (or did not meet) some contract requirements. For problems encountered, corrective action appeared only marginally effective, not effective, or not fully implemented.
Customer involvement was required.
UNSATISFACTORY (U)
(RED)
During the contract period, contractor performance is failing (or fail) to meet most contract requirements. Serious problems encountered. Corrective actions were either ineffective or non-existent. Extensive Customer oversight and involvement was required.
NOT APPLICABLE (N)
(WHITE)
Unable to provide a rating. Contract did not include performance for this aspect. Do not know.
UNKNOWN (UK)
Unknown Performance rating due to lack of sufficient information to assign a rating.
2.3.3. Assigning Ratings:
As a result of the relevancy and quality assessments of the recent contracts evaluated, offerors will receive an integrated performance confidence assessment rating based on the definitions provided in paragraph 2.3.1 above. The rating is not based on a qualitative analysis. Although the past performance evaluation focuses on performance that is relevant to the Technical subfactors and Price assessment, the resulting performance confidence assessment rating is made at the factor level and represents an overall evaluation of contractor performance. Offerors without a record of relevant past performance or for whom information on past performance is not available will not be evaluated favorably or unfavorably on past performance and, as a result, will receive an "Unknown Confidence" rating for the Past Performance factor.
More relevant performance will have a greater impact on the Performance Confidence Assessment than less relevant effort. A strong record of relevant past performance may be considered more advantageous to the Government than an "Unknown Confidence" rating. Likewise, a more relevant past performance record may receive a higher confidence rating and be considered more favorably than a less relevant record of favorable performance.
2.4. Factor 3 – Price
The Offeror’s pricing proposals will be reviewed for compliance with the pricing instructions in Addendum 52.212-1. Price proposals will be evaluated for (1) completeness, (2) reasonableness, (3) price realism, (4) unbalanced pricing, and (5) Total Evaluated Price. Offerors whose price is determined to incomplete, unreasonable, or unrealistic will not be considered for award. Additionally, an offeror’s price may be rejected, if it contains unbalanced pricing to the extent it poses an unacceptable risk to the Government.
The Government shall evaluate the Total Evaluated Price (TEP) of all offerors, including option prices. The offeror’s price proposal will be evaluated based upon the TEP, calculated as stated in paragraph 2.4.6, as follows. The TEP will be calculated as the sum of the Offeror’s proposed price calculations as computed in accordance with the detailed methodology in this section. The TEP will be used for evaluation purposes only. NOTE: Evaluation of options or extensions does not obligate the Government to exercise such options or extensions.
The Government shall evaluate the TEP of all technically acceptable Offerors. This TEP price rollup is based on the specific CLIN calculation methodology provided below.
These calculations will include all evaluation periods: the Phase-In Period, the Basic Period, all Option Periods, and the 180-day Extension Period. The Extension Period is in accordance with Clause 52.217-8, Option to Extend Services. The Offeror’s price proposal will be based on the prices proposed in Appendix F, Pricing Matrix.
2.4.1 Completeness
Proposals will be reviewed for completeness and compliance with Addendum to FAR 52.212-1, para 5.2. All required pricing must be provided in the pricing proposal Price Matrix in Appendix F. Complete pricing is one aspect of reasonable pricing.
Incomplete proposals will be considered not awardable.
2.4.2 Price Reasonableness
The proposed prices will be evaluated for reasonableness. Analysis of price proposals will be performed using one or more of the techniques defined in FAR 15.404 in order to determine price reasonableness.
Reasonableness must represent a price to the Government a prudent person would pay in the conduct of competitive business. Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 15.404.
2.4.3 Price Realism
Proposed pricing will be evaluated for price realism. This pertains to CLIN pricing as well as TEP. Proposed pricing will be evaluated to ensure adequate understanding of the requirement and to ensure proposed pricing does not pose a risk to performance.
Realistic pricing demonstrates an adequate understanding of the requirement with proposed pricing realistic for the work required. To be realistic, proposed pricing shall be consistent with the proposed approach, demonstrating adequate understanding of the requirement and program complexity. All documentation submitted to support price realism shall be considered in making a determination of price realism.
Unrealistic prices may be grounds for eliminating a proposal from the competition based on an apparent lack of adequate understanding of the requirement or a failure to comprehend the complexity and risks of the program. Offerors are cautioned to not use underbidding as a pricing strategy with the intention of recovering under-bid costs after contract award via Requests for Equitable Adjustments (REAs) or other devices.
2.4.4 Balanced pricing
Offerors’ proposals will be reviewed for unbalanced pricing. The Government will evaluate any supporting information provided by the Offeror explaining variances that appear unbalanced. Evaluated offers that are determined to be unbalanced may be deemed ineligible for award by the Contracting Officer if a determination is made that lack of balance poses an unacceptable risk to the Government.
Unbalanced pricing pertains to CLIN pricing variance and/or unexplained variance between periods of performance. Unbalanced pricing exists when, despite an acceptable total price, the price of one or more line items is significantly over or understated as demonstrated by application of price analysis techniques, such that:
a. There is reasonable doubt the offer would result in the lowest overall cost to the Government, even though it is the lowest priced Offeror; or
b. The offer is so grossly unbalanced; its acceptance would be tantamount to allowing an advanced payment.
2.4.5 Data Other than Certified Cost or Pricing Data
If requested by the CO, data other than certified cost or pricing data shall be evaluated to support a determination of price reasonable pricing, balanced pricing, and price realism. This information will only be requested if all other sources have been insufficient to support a determination of reasonable and/or balanced and/or realistic pricing.
2.4.6 Total Evaluated Price (TEP):
Evaluation of proposed pricing will be based on review of pricing provided in the Pricing Matrix, Appendix F. The TEP will be calculated as the sum of the Offeror’s proposed unit prices multiplied by the estimated quantities provided in paragraph 2.4.7 below.
Each CLIN calculation will be computed in accordance with the detailed methodology in this section. The TEP will be used for evaluation purposes only. NOTE: Evaluation of options or extensions does not obligate the Government to exercise such options or extensions. The six month extension period is not to be considered part of Option Year periods—the Extension Period will be a separate option exercise if it is utilized.
Similarly, quantities provided in the Estimated Quantities Table (para 2.4.7) are for evaluation purposes only and do not represent future purchase quantities or obligate the Government whatsoever.
2.4.6.1 For purposes of TEP calculation, the Estimated Quantities Table (para 2.4.7) provides information to be utilized as a basis for proposing prices by contract periods, such as Phase-In, the Basic Period, Option Periods, and Extension. If an Extension Period of a few months is also required, that pricing shall be based on the last Option Period unit prices. Extended Pricies per CLIN will be based on unit prices multiplied by the government-provided estimated quantities: number of occurrences, estimated dollars or estimated hours.
2.4.6.2 Information provided below demonstrates the general CLIN structure of the requirements and explains details regarding instruction of submitting proposed pricing.
To develop the TEP for the contract, CLINs 0001 through X014 will be proposed for evaluation and subsequent award purposes as follows:
CLIN CLIN Description TEP Calculation Methodology
0001 Phase-In Proposed unit prices will be multiplied by 3 months for Phase-In.
X002 Aircraft Support Services
Proposed unit prices for each aircraft type will be multiplied by the quantity designated for evaluation purposes as well as frequency per year. This is 4 months per year for the Basic Period. Option years will be multiplied by 12 for each full Option year and by 6 for the Extension Period, representing 6 months. The resulting extended pricing per year or evaluation period will be added together to yield the total evaluated price for this CLIN. Each SubCLIN will be calculated separately and added together for the overall CLIN extended price.
X003 Towing Services
Proposed unit prices will be multiplied by the quantity designated for evaluation. This is 4 months of the Basic Period. Option years will be multiplied by 12 for each full Option year and by 6 for the Extension Period, representing 6 months. The resulting extended pricing per year or evaluation period will be added together to yield the total evaluated price for this CLIN.
X004 COMBS
Proposed unit prices will be multiplied by the quantity designated for evaluation. This is 4 months of the Basic Period. Option years will be multiplied by 12 for each full Option year and by 6 for the Extension Period, representing 6 months. The resulting extended pricing per year or evaluation period will be added together to yield the total evaluated price for this CLIN.
X005 Data NSP
X006 Flying Hours Proposed unit prices multiplied by the quantity designated for evaluation. The resulting extended pricing per year or evaluation period will be added together to yield the total evaluated price for this CLIN.
X007 RESERVED
X008 Base Support Services
Proposed unit prices will be multiplied by the quantity designated for evaluation. This is 4 months of the Basic Period. Option years will be multiplied by 12 for each full Option year and by 6 for the Extension Period, representing 6 months. The resulting extended pricing per year or evaluation period will be added together to yield the total evaluated price for this CLIN.
X009 Engine Overhaul
Proposed unit prices multiplied by the number of engines estimated for Overhaul per period. The resulting extended pricing per year or evaluation period will be added together to yield the total evaluated price for this CLIN
X010 Propeller Overhaul
Proposed unit prices multiplied by the number of propellers estimated for Overhaul per period. The resulting extended pricing per year or evaluation period will be added together to yield the total evaluated price for this CLIN
X011 Engineering Support
Proposed unit prices will be multiplied by the quantity designated for evaluation. This is 4 months of the Basic Period. Option years will be multiplied by 12 for each full Option year and by 6 for the Extension Period, representing 6 months. The resulting extended pricing per year or evaluation period will be added together to yield the total evaluated price for this CLIN.
X012 Deployment Support Proposed unit prices multiplied by the quantity designated for evaluation. The resulting extended pricing per year or evaluation period will be added together to yield the total evaluated price for this CLIN.
X013 Strip and Paint Proposed unit prices multiplied by the number of aircraft estimated for Strip and Paint per period. The resulting extended pricing per year or evaluation period will be added together to yield the total evaluated price for this CLIN
X014 RESERVED
X015 RESERVED
X016 O&A Firm Fixed Priced –To be Negotiated
X017 O&A Labor
O&A Labor Rates per performance period shall be proposed as Fixed Rates for use throughout each period of performance. These Fixed Rates should be fully loaded rates, and will be multiplied by estimated hours per evaluation period provided by the Government. The resulting extended pricing per year or evaluation period will be added together to yield the total evaluated price for this CLIN.
X018 O&A Material
A fully burdened (loaded) Material Handling Rate shall be proposed as a Fixed Rate per evaluation period.
These rates shall be sufficient to include all possible cost increases in out-years, as well as any and all future out-years changes in supply support, including subcontractors or vendors or supply chain management changes. These proposed Fixed Rates will be multiplied by the estimated material costs per year, resulting in annual extended pricing. These annual extended prices will be added together to yield total price CLIN.
X019
Travel & Per Diem
Not Evaluated
X020 Transportation Not Evaluated
X021 Parts & Materials (Not included in Flying Hour CLIN) Not Evaluated
As indicated above, all extended pricing per CLIN will be added together yielding the
TEP.
2.4.7. Estimated Quantities Table
The following quantities are FOR EVALUATION PURPOSES ONLY. The figures are not to be used for computation of workload.
Phase-In
3-Months
Basic Period
4-Months
Option Year I
Year II
Year III
Year IV
Incentive
Opt
6-Month Extension
Phase-In
3 N/A N/A N/A N/A N/A N/A N/A N/A
Aircraft Support Services
UV-18B 0 4 12 12 12 12 12
T-41D 0 4 12 12 12 12 12
TG-16A 0 4 12 12 12 12 12
TG-15A 0 4 12 12 12 12 12
TG-15B 0 4 12 12 12 12 12
TG-15B 0 4 12 12 12 12 12
T-51A 0 4 12 12 12 12 12
Towing Services
0 4 12 12 12 12 12
COMBS
0 4 12 12 12 12 12
Flying Hours
UV-18B 0 2,200 2,200 2,200 2,200 2,200 2,200 2,200 2,200
T-41D 0 1,200
1,200
TG-16A 0 5,430
5,430
TG-15A 0 641
TG-15B 0 463
T-51A 0 1,150 1,150 1,150 1,150 1.150 1,150 1,150 1,150
T-53A 0 10,296 10,296 10,296 10,296 10,296 10,296 10,296 10,296
Base Support
Engine Overhaul
T-41D
UV-18B
1 5 1 1 1 1 1 5
T-51A
1 1 1 3
1 1 1 1
T-53A
0 1 1 5 9 6 4 1 1
Propeller Overhaul
0 1 1 1 2 1 1 1 1
T-51A
0 1 1 2 1 1 1 1 1
UV-18B
0 1 3 1 1 1 3 2 1
T-53A
0 1 1 9 15 1 1 1 1
Strip & Paint
0 1 1 1 1 1 1 1 1
UV-18B
0 1 1 1 1 1 1 1 1
T-51A
0 1 1 1 1 1 1 1 1
T-53A
0 1 1 1 1 1 1 1 1
Deployments
UV-18B
T-41D 0
TG-16A 0
TG-15A 0
TG-15B 0
T-51A 0
O&A
Maintenance- Straight Time Rate
200 500 500 500 500 500 500 300
Maintenance- Overtime Hourly Rate
Engineering- Straight Time Rate
Engineering-Overtime Hourly Rate
0 50 100 100 100 100 100 100 50
* Material Handling Rate (Ceiling, Fixed
Rate)
0 $150 $400
$400
$400 $150
* Dollar amounts in thousands of dollars
2.4.8 Rounding - Compliance with instructions regarding rounding will be verified during evaluation. Documentation to support rounding will be provided in Section 1, as well as actual rounding in Section 4, Pricing Matrix located in Appendix F. The Pricing Matrix format provides for decimal places that must be IAW the required decimal format.
If any pricing proposal deviates from this format, the Government will apply the specified format to determine the extended pricing and TEP.
2.4.9 Service Contract Labor Standards (SCLS)
The Government will review Section 3 of the Price Volume to verify each Offeror’s compliance with Appendix G, Section L, requirement to demonstrate compliance with the SCLS. Compliance with the SCLS is the responsibility of the Offeror and subsequent contract awardee. Offerors’ demonstration of their understanding of SCLS as applicable for SCLA-covered positions will be reviewed. It should be noted that actual compliance of Offerors’ wage rate payments to employees with the SCLS and regional Area Wage Determination (AWD) as appropriate is not within the responsibility or purview of evaluators and shall not be reviewed. The Department of Labor (DoL) is assigned SCLS compliance responsibilities and shall be the Government Point of Contact (POC) in regard to any compliance questions or concerns.
2.4.10 O&A Fixed Rates for Labor and Material
The Government will review pricing proposed as Fixed Rates (hourly labor rates for O&A and Material Handling Rates) as required in Section 3 of the Price Volume.
2.4.11 Subcontractor Pricing - The Government will review Section 2 regarding information pertaining to subcontractor pricing. Reasonable pricing determination as it relates to subcontractors will be reviewed. Evaluation of subcontractor/vendor teaming arrangements will be reviewed, as well as the methodology of determining subcontractor pricing fair & reasonable.
2.4.12 Government Furnished versus Contractor Furnished Assumptions - The Government will review information provided in Section 3 of the Price Volume to verify each Offeror’s assumptions based on information provided in the solicitation pertaining to items furnished by the Government. The Government will review information provided in Section 3 of the Price Volume to verify each Offeror’s understanding of items (including property, equipment, material, and facilities) provided by the Government.
2.4.13. Proposed Price Reduction per Corporate/Management Decision The Government shall review Section 1 of the Price Volume for all Offerors’ explanation of any reduction in proposed pricing as a corporate or management decision. This includes review of the areas of price reduced, such as profit, volume or location discounts, indirect rate reductions and so forth. Also, the Offerors’ explanation of how such reduction will not affect contractor responsibility or put the Government at increased performance risk.
2.4.14. Estimating Methodology and Systems Review - The Government will review information provided in Section 1 of the Price Volume regarding estimating, accounting, and purchasing systems. As provided in Section 1 of the Price Volume, estimating, accounting, and purchasing systems will be reviewed. The status of the offerors’ systems will be reviewed by the Government. DCMA approval will be noted. Any deviation from Offerors’ standard practices will also be evaluated. The Government will review your basis of estimate on which proposed pricing was based.
2.4.15 Price Assumptions Used in Development of Proposed Pricing - The Government will review information provided in Section 3 of the Price Volume regarding price assumptions utilized in the development of proposed pricing. Such information will be used to understand the Offerors’ proposed pricing basis of estimate. Additionally, these assumptions help provide support for the Government’s determination of reasonable and balanced pricing.
2.4.16 Government Field Support Agencies
The Government will review Section 3 of the Price Volume to check compliance with the requirement to identify the cognizant Defense Contract Audit Agency (DCAA) and DCMA office.
2.4.17 Other Documentation Review - In reviewing proposed prices, all additional information from the Price Volume will also be considered. Offerors may provide any additional data other than certified cost or pricing data as believed necessary to support, justify or clarify their proposed pricing. All information provided in response to the solicitation will be reviewed and will contribute to the determination of reasonable, balanced and realistic pricing.
| 1.0. Source Selection (SS) |
| 1.1. Basis for Contract Award |
| 1.2. Number of Contracts to be Awarded: |
| 1.3. Correction Potential of Proposals: |
| 2.0. Evaluation Factors |
| 2.1. Evaluation Factors and Subfactors |
| 2.1.1. Evaluation factors used to evaluate each proposal: |
| 2.2. Factor 1 – Technical |
| 2.4. Factor 3 – Price |
File details come from the government source that posted it. Updated .