PWS

View the file

Other files for this federal contract opportunity

Other files attached to Salvage Services, newest first.
File Type Posted
HFGCS_APS_14_Jul_09_FA810608R0001.rtf RTF text file
HFGCS Solicitation Amend 5.pdf PDF
ATTCH 3 - Proposed Antenna Replacement Matrix —
ATTCH 7 - Pricing Matrix - Part 1 —
ATTCH 3 - Proposed Antenna Replacement Matrix.xls XLS spreadsheet
FA810608R0001.RTF RTF text file
RFP Q As 5 MAW —
Questions and Answers 4.pdf PDF
RFP Q As 2 MAW —
HFGCS Amendment 1.pdf PDF
ATTCH 7 - Pricing Matrix - Part 2 —
ATTCH 5 - SCA WD.pdf PDF
Exhibit B - HFGCS B001 CDRL.pdf PDF
APPENDIX C - Safety Specifications.pdf PDF
Exhibit C - HFGCS C003 CDRL.pdf PDF
Exhibit E - HFGCS E001 CDRL.pdf PDF
Performance Work Statement —
Exhibit A - HFGCS A003 CDRL.pdf PDF
Exhibit E - HFGCS E002 CDRL.pdf PDF
Exhibit E - —
Exhibit G - HFGCS G001 CDRL.pdf PDF
Exhibit E - HFGCS E004 CDRL.pdf PDF
ATTCH 2 - Antenna Database.pdf PDF
Exhibit G - —
ATTCH 4 - Planned GBSLP Stations Per Year.pdf PDF
Exhibit A - HFGCS A006 CDRL.pdf PDF
Exhibit A - HFGCS A005 CDRL.pdf PDF
ATTCH 1 - Locations of the HFGCS Stations —
Exhibit C - HFGCS C001 CDRL.PDF PDF
Exhibit D - HFGCS D003 CDRL.pdf PDF
Exhibit C - —
Exhibit F - —
Exhibit C - HFGCS C004 CDRL.pdf PDF
Exhibit F - HFGCS F001 CDRL.pdf PDF
Section L FedBizOpps 14 May 08.pdf PDF
Pre-Proposal Conf - Q A Letter —
HFGCS Pre-Proposal Conference Attendee List.pdf PDF
TO 00-35D-54.pdf PDF
MIL-STD-188-124B.pdf PDF
HFGCSAttchF.pdf PDF
HFGCSAttchE FLtr.pdf PDF
HFGCSE-CDRLs.pdf PDF
ATCHD-PWSStationLocations20Feb08_v1_.pdf PDF
HAPSSectionL25Jan08MAW11.pdf PDF
HAPSSectionM25Feb08.pdf PDF
ATCHC-PWSApplicableDocuments20Feb08_v2_.pdf PDF
HFGCSG-CDRLs.pdf PDF
HFGCSC-CDRLs.pdf PDF
HFGCSPreSolicitationConferenceLtr.pdf PDF
HFGCSAPSDRAFTPWS.pdf PDF
Show all 50

Salvage Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

For

HIGH FREQUENCY GLOBAL COMMUNICATIONS SYSTEM (HFGCS)

ANTENNA PROGRAM SUPPORT (APS)

PREPARATION DATE: 27 FEBRUARY 2008

PURCHASE REQUISITION NUMBER: FD2030 - 07 - 00086

SOLICITATION NUMBER: FA8106 - 08 - R - 0001

PREPARING ORGANIZATION: 547 ACSS TINKER AFB OK 73145-9042

TABLE of CONTENTS

SECTION PARAGRAPH TITLE

TABLE of CONTENTS

1. SECTION I –DESCRIPTION OF SERVICES/GENERAL INFORMATION

1.1 Contractor Service Requirements

1.1.1 Program Support

1.1.2 Program Engineering Support

1.1.3 Maintenance Support

1.1.3.1 Scheduled Maintenance Support……………………………………...6

1.1.3.2 Unscheduled Maintenance Support

1.1.3.3 Short Notice Maintenance Support

1.1.4 Site Survey/Installation / De-Installation

1.1.4.1 Antenna and Antenna Subsystems

1.1.5 Inspections

1.1.5.1 Preventative Maintenance Inspection

1.1.5.2 Phase Inspection………………………………………………………...8

1.1.6 Grounding Bonding Shielding Lightning Protection

1.2. Customer Interface

1.3. Records/Data

1.4. Contractor Points of Contact

1.5. Contract Funds Status Report

1.6. Contractor Identification Badges and Vehicle Passes

1.6.1 Military Installation Identification Badges and Vehicle Passes

1.6.2 National Agency Check Requirements

1.7. Safety Requirements

1.8. Compliance with Laws and Regulations

1.9. Program Management Reviews, Meetings, Reports & Studies

1.10. Quality System and Quality Program Requirements

1.10.1 Quality Program

1.10.2 Deficiency Reports

1.10.3 Customer Complaint Record

1.10.4 Performance Review

1.11 Phase-Out Period Requirements

1.12. Other

1.12.1 Status of Forces Agreement & Technical Experts Status

Accreditation

1.12.2 Shipping and Travel

1.12.3 Equipment, Tools and Test Equipment

2. SECTION II – SERVICE SUMMARY

2.1 Service Summary Requirements

2.2 Performance Objectives and Thresholds

2.3 Surveillance Methods

2.4 Contractor Performance Evaluation

Table 2-1 PWS Objectives, Thresholds, Methods of Surveillance

3. SECTION III - GOVERNMENT PROPERTY AND SERVICES

3.1. Government Furnished Material

3.2. Contractor Furnished Items

3.3. Packaging/Packing/Shipping Instructions

3.4. Travel

3.5. Site Protection and Restoration

3.6. Government Furnished Services

1. SECTION I –DESCRIPTION OF SERVICES/GENERAL INFORMATION

This Performance Work Statement (PWS) defines the requirements for Contractor services for the High Frequency Global Communications System (HFGCS) mission by providing the engineering, labor, parts and material for antenna systems inspections, installation and maintenance, procurement of antennas, antenna parts, grounding, bonding, shielding and lightning protection (GBSLP), as well as electrical power evaluation.

HFGCS is the Department of Defense (DoD) world-wide high power, high frequency global Command and Control (C2) network that provides Beyond Line of Sight (BLOS) interoperable voice and data communications for strategic, tactical and air mobility forces. HFGCS is the primary High Frequency (HF) C2 platform directly-supporting the following Government organizations: President of the United States (POTUS); State Department; DoD Executives; United States Air Force (USAF); US Navy, the National Science Foundation and other various DoD Agencies. The program supports MYSTIC STAR, System of Cooperation Among the American Air Forces, (SICOFAA), and Defense Communications System (DCS) HF Entry missions and the North Atlantic Treaty Organization (NATO). HFGCS occupies the HF spectrum from 3-30 Megahertz (MHz) at a maximum output power of 4 kilowatts (KW).

The HFGCS antenna and sub-systems are comprised of Commercial-Off-the Shelf (COTS) equipment. The antenna subsystem extends from the antenna into the facility to the respective RF matrix input and includes pressurization systems, azimuth control systems, electrical power source and power equipment, and all above-and-below-grade grounding material. These subsystems are comprised of both Air Force, and Navy assets, which include several types of antennas in various stages of disrepair and obsolescence. Current antenna locations and types are listed in Section J of the Solicitation, Attachment D: Locations of the HFGCS Stations and Attachment E:

Antenna Database.

1.1 Contractor Service Requirements

The contractor shall provide the program support, program engineering support, labor, parts and material for antenna systems inspections, scheduled and unscheduled maintenance installation/de-installation and maintenance, GBSLP, and electrical power evaluation. Short notice response time is seven (7) work days for Outside Continental United States (OCONUS) and two (2) work days Continental United States (CONUS), or as directed by the Procurement Contracting Officer (PCO). Routine response time will be accomplished within nine (9) work days after notice to proceed. The contractor shall be required to travel to sites listed in Section J in the Solicitation, Attachment D:

Locations of the HFGCS Stations, during the performance of this PWS. The contractor shall be responsible for securing and safeguarding all contractor provided tools, equipment and materials. The contractor shall be responsible for the removal and disposal of all construction debris or other garbage generated during the completion of any tasks associated with this PWS.

1.1.1 Program Support

The contractor shall provide the labor and supplies required for program support for this effort. The contractor shall maintain a program management structure to accomplish administrative planning and integration of program requirements to optimize workflow actions by organizing, directing, and controlling overall program requirements. The contractor shall prepare a Monthly Status Report (DI-MGMT-80368A; A001) and Contract Funds Status Report (CFSR) (DI-MGMT-81468; A004), providing it to the PCO and the Quality Assurance Personnel (QAP). The contractor shall provide the following documentation as directed by the PCO: Conference Agenda (DI-ADMN-81249A;

A002), Conference Minutes (DI-ADM-81250A; A003), Trip Reports (DI-MISC-80508B;

A005), Program Progress Reports (DI-MGMT-80555A; A006), Hazardous Material Management Plan (DI-MGMT-81398; B001), Management Plan (DI-MGMT-80004;

E004), Environmental Health and Safety Plan (DI-ENVR-81375; B003), Telecommunications System Installation Plan (TSIP) (DI-GDRQ-80150; D002), Communications-Computer Systems Installation Records (CCSIRS) (DI-DRPR-80151A;

D003).

1.1.2 Program Engineering Support

The contractor shall provide technical and engineering support to include data, tools, facilities, laboratories, and indirect materials to accomplish the review, evaluation, and development of solutions of engineering and technical problems pertaining to the operation, installation, design, maintenance, logistical support, modifications, tear-down analysis and repair of antenna/antenna subsystems. The contractor shall provide a Technical Report (DI-MISC-80508B; CDRL E001) when directed by the PCO. Upon completion of Government review, the contractor shall accomplish the delivery order as directed by the PCO. The contractor shall include status of delivery order in the Monthly Status Report (DI-MGMT-80368A; CDRL A001) until completion of task. The contractor shall assist the Government in implementing and maintaining the approved HFGCS Systems Engineering Plan (SEP).

1.1.3 Maintenance Support

The contractor shall provide all services, parts, labor and materials to perform maintenance tasks as directed by the PCO to support HFGCS mission needs. The contractor shall develop a Maintenance Plan (DI-MISC-80508B; CDRL G002) that incorporates all sites and antenna types to include scheduled, unscheduled and short notice site visits. The maintenance plan, at a minimum, shall include the Preventative Maintenance Inspections (PMIs) required in accordance with (IAW) the Original Equipment Manufactures (OEMs) Standards and Specifications performed at one (1) year intervals and the following resulting reports: Periodic Maintenance Inspection (PMI) Report (DI-MISC-80508B; CDRL E003), GBSLP Installation/Repair Report (DI- MISC-80508B; CDRL E005), Corrective Actions Report (DI-MISC-80508B; CDRL E006) and Corrosion Control Report (DI-MISC-80508B; CDRL G001). Communications – Computer Systems Installation Records (CCSIRs) (DI-DRPR-80151A; D003).

Reference Section J of the Solicitation, Attachment E: Antenna Database, for information on antenna types and Attachment F: Proposed Antenna Replacement Matrix, for the proposed replacement schedule.

1.1.3.1 Scheduled Maintenance Support

The contractor shall provide all services to perform scheduled maintenance tasks IAW OEM standards and specifications as directed by the PCO. Scheduled maintenance consists of annual PMIs which result in the PMI Report (DI-MISC-80508B; CDRL E003);

Corrosion Control Report (DI-MISC-80508B; CDRL G001) and Communications – Computer Systems Installation Records (CCSIRs) (DI-DRPR-80151A; D003).

1.1.3.2 Unscheduled Maintenance Support

The contractor shall provide all services, parts, labor, and materials to perform unscheduled maintenance tasks as directed by the PCO to support the HFGCS mission. Unscheduled maintenance will include corrective actions of deficiencies noted during PMIs as directed by the PCO. Unscheduled maintenance support will be routine response time accomplished within nine (9) work days after notice to proceed. All unscheduled maintenance actions shall be reported in the Communications – Computer Systems Installation Records (CCSIRs) (DI-DRPR-80151A; D003), GBSLP Installation/Repair Report (DI-MISC-80508B; CDRL E005), Corrective Actions Report (DI-MISC-80508B; CDRL E006) and Corrosion Control Report (DI-MISC-80508B;

CDRL G001) as tasked by the PCO.

1.1.3.3 Short Notice Maintenance Support

The contractor shall provide all services, parts, labor and materials to perform short notice site visits to perform inspections and maintenance tasks directed by the PCO to support the HFGCS mission. Short notice response time is seven (7) work days for OCONUS and two (2) work days CONUS, or as directed by the PCO. All short notice site visit actions shall be documented in the Corrective Actions Report (DI-MISC- 80508B; CDRL E006), GBSLP Installation/Repair Report (DI-MISC-80508B; CDRL E005), Corrective Actions Report (DI-MISC-80508B; CDRL E006), Corrosion Control Report (DI-MISC-80508B, CDRL G001) and Communications – Computer Systems Installation Records (CCSIRs) (DI-DRPR-80151A; D003).

1.1.4 Site Survey/Installation/De-Installation

The contractor shall conduct a pre-installation site survey. Subsequent to the completed site survey, the contractor shall prepare and implement installation plans for all new antennas or de-installation/repair of existing antennas as directed by the PCO.

The services shall include the disposal of construction debris. The contractor shall meet the requirements of Military Standard 188-124B (MIL-STD-188-124B), Military Handbook 419A (MIL-HDBK-149A) Vol. 1&2, TO 31R2-2GRC244-1 and the applicable OEM Standards and Specifications. The contractor shall deliver to the PCO a Telecommunications System Installation Plan (TSIP) (DI-GDRQ-80150; D002), Communications-Computer Systems Installation Records (CCSIRS) (DI-DRPR-80151A;

D003), Site Facilities Design Data (SFDD) (DI-MISC-80508B; D001) and Installation and Acceptance Test Plan (IATP) (DI-QCIC-80154A; CDRL F001) for review, comments and approval. This test plan must be accepted and approved prior to any testing. The contractor shall prepare and submit an Installation Test Report, (ITR) (DI- QCIC-80512; CDRL F002) indicating the performance characteristics of the installed HF Antenna Systems, meeting or exceeding the OEM specifications, MIL-STD-188-124B, MIL-HDBK-419A Vol. 1&2 and Voltage Standing Wave Ratio (VSWR) sweeps accomplished in accordance with (IAW) TO 312R2-2GRC244-1. Failure to meet any of the performance characteristics as indicated in the aforementioned reference material shall not be considered a satisfactory installation until all discrepancies are resolved.

Furthermore, the contractor shall prepare and deliver ITR (DI-QCIC-80512; CDRL F002) to the PCO or their designated representative upon completion of each site test.

During and after installations/de-installations the contractor shall digitally document the work performed. Reference the proposed replacement schedule in Table 1-1 below and Section J of the Solicitation, Attachment F: Proposed Antenna Replacement Matrix, for information on antenna types.

Table 1-1 Proposed Replacement Schedule

Fiscal Year

(FY)

Country Code Station # of Levels # of Antennas

Antenna Replacement

Plan

09 MCC West Coast 10 20 5

10 JTY

JDG

Yokota Diego Garcia

11 ADW

HAW

Andrews Ascension

12 GUA

JNR

Guam Puerto Rico

13 HIK

AED

Hickam Elmendorf

14 ICZ

PLA

Sigonella Lajes

15 CRO

OFF

Croughton Offutt

1.1.4.1 Antenna and Antenna Subsystems

The contractor shall purchase antennas and antenna subsystems as requested and directed by the PCO.

1.1.5 Inspections

The contractor shall accomplish PMIs, Phase Inspections and GBSLP Inspections as directed by the PCO to support the HFGCS mission.

1.1.5.1 Preventative Maintenance Inspection (PMI)

The contractor shall provide the necessary services to perform PMIs as tasked. The contractor shall deliver a systematic plan of approach for each site where PMI’s are requested. After completion of the PMI’s the contractor will submit a Technical Report (DI-MISC-80508B; CDRL E001), PMI Report (DI-MISC-80508B; CDRL E003), GBSLP Installation/Repair Report (DI-MISC-80508B; CDRL E005), Corrosion Control Report (DI-MISC-80508B; CDRL G001) and Communications – Computer Systems Installation Records (CCSIRs) (DI-DRPR-80151A; D003) for review, comment and approval that details work accomplished. Reference Section J of the Solicitation, Attachment E:

Antenna Database, for information on antenna types and Attachment F: Proposed Antenna Replacement Matrix for the proposed replacement schedule.

1.1.5.2 Phase Inspection

The contractor shall provide the services necessary to plan and implement phase inspections every two (2) years or as requested by the PCO. The contractor shall meet the requirements listed in Section J of the Solicitation, Attachment C: Applicable Documents and Attachment G: Proposed Phase Inspection Requirements. Upon completion of the effort the Contractor shall submit a Phase Inspection Report (DI- QCIC-80512; CDRL E002), Corrosion Control Report (DI-MISC-80508B, CDRL G001) and Communications – Computer Systems Installation Records (CCSIRs) (DI-DRPR- 80151A; D003) which details work accomplished.

1.1.6 Grounding, Bonding, Shielding & Lightning Protection (GBSLP) The contractor shall provide the services and supplies to inspect, plan for and implement GBSLP at facilities associated with the HFGCS system as requested by the PCO. The contractor shall meet the requirements listed in Section J of the Solicitation, Attachment C: Applicable Documents and applicable OEM Standards and Specifications. The contractor shall deliver to the PCO an Installation and Acceptance Plan for review, comment and approval. Upon completion of the effort the contractor shall submit a Grounding, Bonding, Shielding and Lightning Protection (GBSLP) Installation/Repair Report (DI-MISC-80508B; CDRL E005), Grounding, Bonding, Shielding and Lightning Protection (GBSLP) Inspection Report (DI-MISC-80508B;

CDRL E008), Telecommunications System Installation Plan (TSIP) (DI-GDRQ-80150;

D002), Communications-Computer Systems Installation Records (CCSIRS) (DI-DRPR- 80151A; D003), Installation and Acceptance Test Plan (IATP) (DI-QCIC-80154A; CDRL F001), Site Facilities Design Data (SFDD) (DI-MISC-80508B; D001) and Installation Test Report, (ITR) (DI-QCIC-80512; CDRL F002) that details work accomplished.

1.2. Customer Interface

The contractor shall ensure all contractor personnel interfacing with Government personnel shall conduct themselves in a professional manner and have the ability to communicate clearly speak, read and write fluent English.

1.3. Records/Data

The contractor shall provide the PCO or designated representative copies of all OEM, manuals and technical data associated with the material and parts delivered under this contract.

1.4 Contractor Points of Contact (POC)

The contractor shall provide in writing to the PCO, within ten (10) work days after contract award, the contractor’s contact information and alternate names with both duty hour (0600-1800) and non-duty hour telephone numbers and be available to be contacted by telephone during duty and non-duty hours to discuss and resolve issues pertaining to the services provided.

1.5 Contract Funds Status Report (CFSR)

The contractor shall develop and maintain processes to identify, review, analyze, and forecast all budgetary and financial impacts to program. The contractor shall document contract funds requirements, funding changes, budget estimates, and funds in excess of contract needs. The contractor shall develop and deliver a Contract Funds Status Report (CFSR) (DI-MGMT-81468; CDRL A004) for review, comment and approval.

1.6 Contractor Identification Badges and Vehicle Passes

The contractor shall ensure all contractor employees obtain identification badges and vehicle passes. The contractor shall ensure each employee displays badges on the outer clothing on the front of the body between the neck and waist so that the badges are visible at all times. The contractor shall comply with the following paragraphs.

1.6.1 Military Installation Identification Badges and Vehicle Passes The contractor shall comply with local procedures provided at post award conference for obtaining military installation identification badges and vehicle passes. Contractor personnel shall comply with directives pertaining to operation of privately owned vehicles on military installations.

1.6.2 National Agency Check (NAC) Requirements

The contractor shall provide information to obtain favorable National Agency Check (NAC) investigations for its employees.

1.7 Safety Requirements

In the event of an accident, the contractor shall take action to establish control of the accident scene, prevent further damage to persons or property, preserve evidence until released by the accident investigative authority, cooperate and assist Government personnel in the investigation of the accident, and submit an Accident/Incident Report (DI-SAFT-8156; B002). The Government will not provide for removal of contractor personnel in the event of emergency.

1.8 Compliance with Laws and Regulations

The contractor shall be knowledgeable of and comply with all applicable Federal, State, Local and foreign (see Section J of Solicitation, Attachment C: Applicable Documents) laws, regulations, and requirements. In the event laws and regulations change during the term of this contract, the contractor shall be required to comply with such laws when enacted.

1.9 Program Management Reviews (PMR), Meetings, Reports and Studies The contractor shall attend annual Program Management Review (PMR), bi-weekly telephone conferences and Technical Interchange Meetings (TIMs). The contractor shall participate in TIMs, working groups, and integrated product teams (IPTs) with both Government and contractor organizations. The contractor shall prepare briefings and special technical reports or position papers; develop and provide presentation materials.

The contractor shall prepare monthly status reports; trip reports, meeting agendas, and meeting minutes as required in scope of this effort. Monthly Status Report (DI-MGMT- 80368; CDRL A001), Conference Agenda (DI-ADMN- 81249A; CDRL A002), Conference Minutes (DI-ADMN-81250A; CDRL A003), Trip Report (DI-MISC-80508B;

A005).

1.10 Quality System and Quality Program Requirements

The contractor shall implement a quality system and quality program that is International Standard ISO 9001-2000 compliant. The contractor shall prepare and submit Quality Systems Plan (DI-QCIC-81379; CDRL C001) and as required submit a Quality Assessment Report (DI-QCIC-81187; CDRL C002).

1.10.1 Quality Program

The contractor shall ensure the quality program is designed to detect and correct conditions adverse to quality. The contractor shall investigate all Deficiency Reports (DRs) submitted against defective items manufactured, repaired, or overhauled by the Contractor. The contractor shall ensure each deficiency report is processed IAW TO 00-35D-54, USAF Deficiency Reporting and Investigating System. When the contractor receives a Deficiency Report (DR) or Quality Deficiency Report (QDR), the contractor shall ensure deficiency reports include: analysis of data to determine extent and cause of deficiencies; analysis of trends in processes or performance of work to prevent recurrence; and introduction of required improvement, corrections, and monitoring of the effectiveness of corrective action taken. Contractor shall ensure that the data is portable into the Deficiency Reporting and Information System (DREAMS) IAW TO 00- 35D-54.

1.10.2 Deficiency Reports

If the contractor receives defective items, the contractor shall develop and deliver a DR or QDR IAW TO 00-35D-54. The contractor shall report IAW TO 00-35D-54 materials found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the contractor shall determine and record probable cause. The contractor shall submit Quality Deficiency Report (DI- QCIC-80736; CDRL C003) or Deficiency Report (DI-ALSS-81535; CDRL C004).

Contractor shall ensure that the data is portable into the Deficiency Reporting and Information System (DREAMS) IAW TO 00-35D-54.

1.10.3 Customer Complaint Record

When the contractor on-site representative receives Customer Complaint Report from the QAP, the contractor shall initial next to the defective performance observation indicating acknowledgment of deficiency. The contractor shall complete the Customer Complaint Record and return within five (5) work days to the QAP.

1.10.4 Performance Review

The contractor shall support Government quality assurance surveillance to periodically evaluate the contractor’s performance IAW the Government’s Performance Plan.

1.11 Phase-Out Period Requirements

The contractor shall prepare a Phase-Out Plan IAW (CDRL E007). The contractor shall be fully responsible for all work performed under this PWS during the phase-out period.

The contractor shall ensure the phase-out requirements are accomplished within sixty

(60) calendar days prior to contract end date.

a. Cooperate fully to permit an orderly changeover of workload.

b. Allow recruitment notices to be placed in the work areas.

c. Allow all follow-on Contractor and Government personnel access on a non-interference basis, to observe equipment operation, workflow to include work in progress, reporting, priorities, forms, documents, scheduling, storage, safety, security, and quality control procedures.

d. Complete the phase-out joint inventory.

1.12 Other

1.12.1 Status of Forces Agreement and Technical Expert Status Accreditation The contractor shall comply with the Status of Forces Agreements (SOFA) and Technical Expert Status Accreditation (TESA) of the host nations in which work is being accomplished.

1.12.2. Shipping and Travel

The contractor shall be responsible for delivery of parts, tools and equipment to any of the HFGCS sites listed at Section J of the Solicitation, Attachment D: Locations of the HFGCS Stations, as specified on individual orders issued by the PCO. The contractor shall comply with Freight on Board (FOB) Origin or Destination requirements as specified on all individual orders issued by the PCO. The contractor shall comply with packing, packaging and shipping requirements as specified on all individual orders issued by the PCO. The contractor shall utilize commercial standards to the maximum extent possible in lieu of military shipping procedures. However, when military travel/shipping is required, the Contractor shall be responsible for payment for all travel and shipping preformed by MILAIR. The contractor shall establish an account with HQ AMC/FMFAB for payments of contractor personnel travel and shipments accomplished via military air (MILAIR) (See Paragraph 3.4).

HQ AMC/FMFAB

Attn: Jordan Richter

402 Scott Dr., Unit 1K1 Scott AFB IL 62225-5311

Commercial: (618) 229-2314

When military transportation is used for shipping, the contractor shall provide to the PCO in writing the transportation control number (TCN), destination and date of shipment to include estimated arrival date.

1.12.3 Equipment, Tools and Test Equipment

The contractor shall provide all tools, equipment and test equipment.

2. SECTION II – SERVICE SUMMARY.

The contractor shall ensure the following service summary requirements are accomplished:

2.1 Service Summary (SS) Requirements

The contractor shall ensure the performance objectives and performance thresholds are met or exceeded.

2.2 Performance Objectives and Thresholds

The contractor shall achieve or surpass performance thresholds identified in Table 2-1 of this PWS. The performance thresholds are designed to:

a. Align contractor performance with objectives.

b. Focus on critical success factors in meeting performance objectives.

c. Reflect performance goals.

d. Promote continuous improvement in performance.

2.3 Surveillance Methods

The contractor shall support the Government surveillance methods as identified below.

a. Periodic inspection of recurring service outputs.

b. Inspection of the output.

c. Periodic inspection of the process or output.

d. Customer complaints.

2.4 Contractor Performance Evaluation

The Government will evaluate contractor performance of services and materials provided to determine whether or not it meets the performance measures outlined in this PWS.

TABLE 2-1

Performance Objective

PWS

Paragraph

Performance Threshold

Method of Surveillance

1. Monthly Status Report A001

1.1.1, 1.1.2, 1.10

No more than two monthly reports submitted late per annual performance period.

100% Inspection of the reports

2. Conference Agenda A002

1.1.1, 1.10 Due 5 work days prior to conference with only minor editorial defects 95% accurate on first review. Contractor shall correct defects within 5 work days after notification of defects

100% Inspection of the agendas

3. Conference Minutes A003

1.1.1, 1.10 Action Items due 5-work days after conference 95% accurate.

Contractor shall correct defects within 5 work days after notification of defects

100 % Inspection of the minutes

4. Contract Funds Status Report (CFSR) A004

1.1.1, 1.5 No more than two monthly reports submitted late per annual performance period.

All reports shall be 95% accurate on first review.

Contractor shall correct defects within 5 work days after notification of defects

100% Inspection of the CFSRs

5. Contractor Travel 1.12.2, 3.4 NLT 9-work days of planned trip. Short notice/no notice travel will be approved by the 547 ACSS as required.

100% inspection of the process or output and customer complaint

6. Site Survey/Installation/De- Installation D001, D002, D003, F001, F002

1.1.4 All safety related work shall be

(100%) correct with all non-safety work shall be accomplished to 95% correctness. Per MIL -STD-88-

124B, MIL-HDBK-419A, OEM

Standards and Specification.

The contractor shall repair all discrepancies with in 5- work days for of noted discrepancies.

Periodic Inspection of installed equipment referencing MIL -STD-

88-124B, MIL-HDBK-

419A, OEM

Specifications and Standards

7. Phase Inspection, D003, E002, G001

1.1.5.2 No more than two Assessment /

Reports /Study Services submitted late.

100% Inspection of the Reports/Study Services

8. Periodic Maintenance Inspections (PMI’s), E001, D003, E003, E005, G001

1.1.5.1

All safety related work identified as deficient during the inspection shall be repaired to 100% correctness. All other repairs identified as deficient during the PMI will be accomplished to 95% correctness. Per MIL -STD-88-

124B, MIL-HDBK-419A, OEM

Standards and Specification.

The contractor shall repair all discrepancies with in 5- work days for of noted discrepancies.

100% Inspection of PMI’s by referencing

MIL -STD-88-124B,

MIL-HDBK-419A,

OEM Specifications and Standards

9. Test Plans and Test Reports F001, F002

1.1.6 All Plans reports shall be 95%

accurate on first review.

Contractor shall correct defects within 5 work days after notification of defects

100% Inspection of Plan/Reports

10. Grounding, Bonding., Shielding and Lightning Protection (GBSLP), D001, D002, D003, E005, E008, F001, F002

1.1.1, 1.1.5.1

All safety related work shall be (100%) accuracy with all non-safety work accomplished to 95% accuracy. Per MIL-STD-188-

124B MIL-HDBK-419A, OEM

Standards and Specification.

The contractor shall repair all discrepancies with in 5- work days of noted discrepancies.

Periodic inspection of Repaired Equipment/Facility by referencing MIL -

STD-88-124B, MIL-

HDBK-419A, OEM

Specifications and Standards

3. SECTION III - GOVERNMENT PROPERTY AND SERVICES.

The contractor shall conform to the provisions of AFI 31-101 for safeguarding the Government-furnished buildings and all classifications of Government property contained therein. All records, files, documents, and work papers provided by the Government or generated by the contractor in support of the contract are Government property and shall be maintained and protected IAW this PWS. The contractor shall prepare and present a Property Control System (written procedures) to the Government Property Administrator (PA) within thirty (30) calendar days after contract award or at the pre-performance conference, whichever is sooner. The contractor’s procedures shall be prepared IAW the requirements pursuant to the clause of this contract and shall be organized with Functions and Functional Segments IAW Attachment A of Department of Defense (DoD) 4161.2-M. One paper copy and one electronic copy (Microsoft Office 2000 compatible) shall be provided to the Government PA for review and approval. The contractor shall submit changes to the approved Property Control System to the PA for review and approval prior to implementation of such changes.

3.1. Government Furnished Material

The contractor shall specifically identify in their delivery order proposal the type, amount, and time frames required for any government resources, excluding those listed below. An initial familiarization/orientation provided at each site when visited.

3.2. Contractor Furnished Items

The contractor shall identify Contractor Furnish Items in each delivery order response to include all rented Equipment (such as heavy equipment such as trenchers, dump trucks, cranes, etc).

3.3. Packaging/Packing/Shipping Instructions

The contractor shall identify packaging, packing, and shipping in each delivery order response. When government transportation is used delivery will be FOB Origination.

3.4. Travel

As part of the cost proposal for a delivery order, the contractor shall provide any anticipated travel costs, if known, to include: origination; destination; number of trips;

number of persons; and a breakdown of lodging, meals, transportation and related costs. Note that some sites require the use of AMC flights (See Paragraph 1.12.2).

Actual expenses are limited by the Government Travel Regulations and must be pre-approved by the 547 ACSS. Approval shall be in the form of a signed Travel Request with an assigned number. For the purpose of this PWS an “assigned number” is defined as a Travel Request Number (TRN).

3.5. Site Protection and Restoration

Restoration of all contractor-caused damage to existing landscape, environment, utility, facilities and equipment during installation shall be the responsibility of the contractor. If the contractor’s failure to use reasonable care causes damage to any of this property, the contractor shall replace or repair the damage at no cost to the Government.

Contractor damage restoration shall be IAW local directives and specifications. The contractor shall keep the installation area, including storage areas used by the contractor, free from accumulation of waste material and rubbish. Upon completion of the installation, the contractor shall leave the work area and premises in a clean and orderly condition that is satisfactory to the Government QAP. The contractor shall assist the QAP and local base personnel in accomplishing inspections. If the contractor fails or refuses to replace or repair the damage promptly, the Government may have the necessary work performed and charge the cost to the contractor.

3.6 Government Furnished Services

The Government will furnish the following services necessary to perform the tasks in this PWS when the contractor is at an antenna site location (see Section J of the Solicitation, Attachment D: Locations of the HFGCS Stations):

a. Utilities. The Government will furnish utility services. These utilities include natural gas, electricity, water, and sewer for the sole purpose of accomplishing this contract. If the contractor requires additional utility services, it shall be the contractor’s responsibility to provide. Contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs.

b. Telephone. The Government will provide telephone service consisting of Class C and Class A service (to include Defense Switching Network (DSN) service). The contractor shall ensure that the Government provided telephone usage is limited to official Government business related to the performance of this contract. The contractor shall furnish their own telephone service provided by local commercial carrier for their use in matters other than official Government business pertaining to this contract.

c. Custodial Services. The Government will provide custodial services limited to the extent provided in the Base Custodial Contract(s) for the Government facilities provided.