Questions_and_Answers-_Round_3.docx

DOCX document 21 KB Posted

Attached to
TINKER AFB Simplified Acquisition of Base Engineering Requirements (SABER) Federal contract opportunity
Solicitation number
FA8101-12-R-0002
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

Round 3 Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to TINKER AFB Simplified Acquisition of Base Engineering Requirements (SABER), newest first.
File Type Posted
Amendment_6.doc DOC document
Questions_and_Answers-Round_2.docx DOCX document
05_110020_A03.dwg DWG drawing
110020_SABER_Seed_SOW_-_Amendment_1.pdf PDF
110020_A03_Amend_1_(1).pdf PDF
Amendment_5.doc DOC document
110020_M01_Amend_1.pdf PDF
SABER_SEED_PROJECT(Bid_Sheet).docx DOCX document
04_110020_A02.dwg DWG drawing
Amendment_4.doc DOC document
3001-POST-A87.DWG DWG drawing
02_110020_A00.dwg DWG drawing
110020_SABER_Seed_DWG.pdf PDF
3001-POST-A87-withUtilities.DWG DWG drawing
05_110020_A03.dwg DWG drawing
03001_0318.tif TIF image
Questions_and_Answers-Round_1.docx DOCX document
06_110020_A04.dwg DWG drawing
ATT_2_Q19_AF66.pdf PDF
PRICING_SCHEDULE.xlsx XLSX spreadsheet
08_110020_M01.dwg DWG drawing
07_110020_M00.dwg DWG drawing
03_110020_A01.dwg DWG drawing
01_110020_G01.dwg DWG drawing
FA8101-12-R-0002-0003_Amendment.doc DOC document
Proposal_Due_Date_Extension_Amendment_II.doc DOC document
Above_Ceiling_Tile_2.JPG JPG image
Sinks _Tiled_Wall.JPG JPG image
Ceiling_Tile_Above_Sinks.JPG JPG image
Above_Ceiling_Tile.JPG JPG image
Utility_Closet.JPG JPG image
Proposal_Due_Date_Extension_Amendment_I.doc DOC document
SABER_Sign_in_Sheet.pdf PDF
Restroom.JPG JPG image
110020_SABER_Seed_DWG.pdf PDF
PP_QUESTIONNAIRE.doc DOC document
SABER_Seed_SOW_1.pdf PDF
CONSENT_LETTER.doc DOC document
SABER_SPEC_TABLE_OF_CONTENTS.pdf PDF
CLIENT_AUTHORIZATION_LTR.doc DOC document
Combined_Spec.pdf PDF
TAFB_SABER_SOW_12_March_2013.pdf PDF
FA8101-12-R-0002.pdf PDF
WD_OK120032_dtd_03_Aug_12.pdf PDF
PARTNERING_Agmt.doc DOC document
PP_COVER_LETTER.doc DOC document
PPIS.doc DOC document
Atch_1_-_Tile_Example_SABER_Seed.jpg JPG image
Draft TAFB SABER SOW 9 May 12.pdf PDF
Draft SOW Letter.pdf PDF
Show all 50

TINKER AFB Simplified Acquisition of Base Engineering Requirements (SABER) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROUND 3 – SABER RFIs

1. Section 1.4.5.7 in the Statement of Work requests that the new finish floor drain to the new floor drain. Question: Is there an existing floor drain?

A1: A floor drain does not currently exist in the janitor’s closet.

2. Section 1.4.7.11 in the Statement of Work requests that the exhaust fans shall have an antiterrorism force protection (ATFP) shut off switch and be tied into the existing emergency shut off system. Question: Where in Building 3001 is the existing shut off system located?

A2: Refer to previous response provided in Round 1 A14 and Round 2 A63.

Previous Responses included here for reference:

Round 2, A63 - “There is an existing master building control center but due to the size and extent of B3001, relays have been located in the overhead fan decks throughout the building in order to provide multiple tie-in points distributed throughout the building. The nearest tie-in location is typically located at the nearest fan deck. For A85, the nearest fan deck is AHU 22 located overhead at approximately Column K80.

Round 1, A14 – “If this question is in relation to 1.4.7.10.2 on the shut off switch, then the restroom Exhaust Fans shall be connected via relay to the AT/FP shutdown circuit located at the nearest Fan Deck Unit.”

3. Section 1.2.9 in the Statement of Work requests that air sampling be taken prior to opening the entire slab. Question: What level and method of air sampling is required?

A3: The Contractor shall follow OSHA 29 CFR 1910.

4. Question, SF 1442: Do we complete section 52.219-1 Small Business Program Representations # 1- # 8ii (page 55-57) – it appears to a duplication of 52.219-1 on page 52.

A4: Yes, Please complete one copy in its entirety.

5. The dimensions for demolition on sheet A02 do not seem to match up with the scale or in relation to each other. For example:

a. The dimension labeled “5’-10” measures to be equal to the “5’-0” dimension

b. The dimension labeled “22’-2”” measures approximately 20’-7” with the current scale

c. Dimensions “10’-11½”” and “10’-1½ “” measure as equals

A5: The dimensions called out are meant to reflect the most accurate dimensions based on the minimum design information provided. It is the Contractor’s responsibility to verify the as-built conditions as identified in 1.2.2 of the Seed SOW.

6. For the new floor plan, without dimensions we have no way to verify the scale. Please advise.

A6: The final dimensions of the new floor plan are part of the minimum design requirement. The Contractor shall incorporate the design and code requirements in the existing footprint of the restroom.

7. In the SW corner of the women’s restroom, there is an unlabeled fixture to be removed. Please advise what this is.

A7: This is a locker and will be removed by others.

8. On the south wall of the women’s restroom, are these two fixtures trash receptacles?

A8: The “fixtures” on the south wall of the women’s restroom (across from the sinks) are existing paper towel dispensers and a trash receptacle.

9. On the north wall of the men’s restroom, there is a small square Fixture. Please advise what this is.

A9: The “fixtures” on the north wall of the men’s restroom (across from the sinks) are paper towel and soap dispensers.

10. The tile that is called for in the plans is a Crossville 12”x12” cross tread finish. I have come to find out that this tile is only available in a 8”x8”.

A10: Use 12” x 12” Cross-Slate finish

11. Can you please let us know that water heater suppose to be Gas Or Electric and what is the size for it.

A11: Refer to previous Q&A, Round 2 A78. Also, refer to SOW 1.4.10.4 and 1.4.11.11 for clarification.

Previous response stated, “The Contractor shall be responsible for identifying the necessary logistical, architectural, structural, mechanical and electrical work elements required to perform this project. Also the contractor is expected to perform a site visit to verify existing conditions including verification of dimensions of the required work.”

12. Is there a requirement for a temporary restroom while the work is being done?

A12: A temporary restroom is not required.

13. Will night work be required for the demolition? Is night work an option if the contractor wants to work nights? What would the hours be?

A13: Refer to previous Q&A, Round 2 #30.

Previous response stated, “Standard work hours are identified with the exception being outages.”

14. Are we reusing existing electrical circuits? Will we be required to run new wire back to an existing panel? If so where is this panel located?

A14: Refer to previous Q&As, Round 1 A3 and Round 2 A31. Contractor shall replace existing electrical circuits to the panel.

Previous responses stated, “Panel is at C87, circuits 2, 4, 6, 19, 21.”

15. Is the fire alarm system Class A? If so who will be responsible for programming the panel for the new devices?

A15: Refer to previous Q&As, Round 1 A13 and Round 2 A32 & A33 Previous responses stated, “Match the existing F/A System Class “A” Wiring” and “Refer to SEED SOW Para. 1.4.13”

16. Are we to install the conduit and pull the wire for the FA devices and will the base be responsible for the device terminations?

A16: Refer to previous Q&A, Round 2 A33.

Previous response stated, “Refer to SEED SOW Para. 1.4.13.”

17. Drawings call for new sprinkler pipe and heads. How much pipe is to be replaced? At what point does the new pipe begin? Is the existing system a wet or dry system?

A17: Refer to previous Q&A, Round 2 A34.

Previous response stated, “Existing system is wet pipe as is typically required by UFC 3-600-01. In addition, the Contractor shall be responsible for identifying the necessary logistical, architectural, structural, mechanical and electrical work elements required to perform this project. Also the contractor is expected to perform a site visit to verify existing conditions including verification of dimensions of the required work. It is recommended that the contractor consult with the qualified personnel they will be using in order to meet the requirements of UFC 3-600-01 for a detailed analysis of the required modification to the existing system. In this particular case, the drawing note instructs contractor to adjust sprinkler head location. This typically indicates a NICET Level III technician will be providing a sprinkler layout drawing for the new restroom layout including any new sprinkler head locations and any other required calculation or verification including exactly what the required modifications of the existing system will entail.”