Text version

Prime Cover sheet

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFBSheet1 of 19
Washington, D.C.Dated
Estimate Valid to
Final Estimate IGED:\Projects\….\032-33_FinalEst.xls
ItemDescription%MaterialLaborTotalTotal CostOption Bid Summary
No.SUMMARY SHEETCostCostCost
1General Construction Subcontractors
2
3Mechanical Subcontractor
4Electrical Subcontractor
5Fire Alarm Subcontractor
6Option Bid #1
7Subtotal
8Prime Mark Up on Subcontractors
9Total Subcontractors
10
11General Conditions
12
13
14
15Subtotal
16
17
18
19Prime Overhead and Profit
20Subtotal
21Total Including Subcontractors
22Escalation to midpoint of construction
23Subtotal
24Bond
25Subtotal
26
27
28
29
30
31
32

&CSolicitation No. FA7012-10-R-0020 Attachment No. 7

General Conditions

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB2 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionGeneral Conditions - 2008 Means PricesPrices byDaihl
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1superintentdant/cqc, full time52WK
2project manager, 1/4 time52WK
3Security processing1Job
4field office expenses12MO
5office supplies12MO
6telephone bills12MO
7dumpster, 30 cy, 1 dump per week52WK
8daily cleanup (2 hour/day) in occupied areas540MH
9mobilization/demobilization160MH
10plastic sheets, 6 mil, fire retardent1,500SF
11Crane, flatbed mounted, 3-ton capacity6day
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Sheet Total

Sub No 1 Summary

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFBSheet3 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionGeneral Construction SubcontractorsPrices by
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescription%QuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1Interior Architectural Construction
2Interior Architectural Equipment
3Staff Toilet Architectural Construction
4Exterior & Supplemental Architectural Components
5Site Work
6
7
8
9
10
11
12
13
14
15
16
17
18
19Subtotal
20
21
22
23
24
25Subcontractor Overhead
26Subtotal
27Subcontractor Profit
Sheet Total

Sub No 1 Sheet 1

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB4 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionGeneral Construction SubcontractorsPrices by
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.General ConstructionUnit CostCostUnit CostCostCost
1Demo Exist. Guest Rm. Carpet21,188SF
2Demo Exist. Guest Rm. Quarry Tile1116SF
3Demo Exist. Guest Rm. Ceramic Tile Fl.2604SF
4Demo Exist. Guest Rm. Gyp. Bd. Chase1984SF
5
6Demo Exist. Guest Rm. Wet Walls (Gyp.,Studs & CT)16,709SF
7Demo Exist. Guest Rm. Interior Walls (Gyp. & Studs) - no wet walls36,010SF
8Demo Exist. Guest Rm. Exterior Walls (Gyp. & Studs) Int. face only10,912SF
9Demo Exist. Guest Rm. Toilet Doors & Frames62EA
10
11Carpet w/ Pad - Guest Room2,354SY
12Quarry Tile - Guest Room1,116SF
13Ceramic Tile Floor - Guest Room2,604SF
14Ceramic Tile Wall - Guest Room11284SF
15Gyp. Bd. Chase - Guest Room1,984SF
16Wall Paint - Textured Acrylic Coating48,800SF
17Wall Paint Accent - Textured Acrylic Coating8,432SF
18Ceiling Paint6,074SF
19Ceiling Patching for Exist. Wall Demo1,984SF
20
21New Gyp. Bd. & Mtl. Stud Wet Walls - Guest Rm.16,709SF
22New Gyp. Bd. & Mtl. Stud Interior Walls - Guest Rm. (no wet walls)36,010SF
23New Gyp Bd & Mtl Stud Ext Walls w/ Insul - Guest Rm - Int face only10,912SF
24
25SCWD, Frame & Hardware (2'-0" x 6'-8")62EA
26
27
Sheet Total

Sub No 1 Sheet 2

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB5 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionGeneral Construction SubcontractorsPrices by
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.General ConstructionUnit CostCostUnit CostCostCost
1Guest Rooms
2Demo Exist. Vanity155LF
3Demo Exist. Wet Bar & Upper Cabinet310LF
4Demo Exist. Shower Assembly62EA
5
6
7Vanity Base60EA
8Vanity Counter60LF
9Vanity Sink & Cut-Out60EA
10Wet Bar Base Cabinet60EA
11Wet Bar Upper Cabinet60EA
12Wet Bar Counter - Solid Surface155LF
13Mirror124EA
14Toilet Paper Dispenser60EA
15Towel Bar - 24"60EA
16Towel Loop60EA
17Robe Hook60EA
18
19Clg. Access Door - 24" x 24" Stainless (bathroom) - Fire Rated22EA
20Clg. Access Door - 24" x 24" Stainless (bathroom) - Non-Fire Rated41EA
21
22
23
24
25
26
27
Sheet Total

Sub No 1 Sheet 3

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB6 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionGeneral Construction SubcontractorsPrices by
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.General ConstructionUnit CostCostUnit CostCostCost
1Staff Toilet
2Demo Exist. Ceramic Tile Fl.88SF
3Demo Exist. Ceramic Tile Wall495SF
4Demo Exist. Toilet Partitions4EA
5
6
7Conc. Floor Slab Patching88SF
8Epoxy Floor Coating88SF
9Ceramic Tile Wall495SF
10Toilet Partitions4EA
11Toilet Paper Dispenser2EA
12Mirror2EA
13Paper Towel Dispenser2EA
14Soap Dispenser2EA
15
16
17
18
19
20
21
22
23
24
25
26
27
Sheet Total

Sub No 1 Sheet 4

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB7 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionGeneral Construction SubcontractorsPrices by
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.General ConstructionUnit CostCostUnit CostCostCost
1Sawcutting Exist Masonry48LF
2Demo Exist Face Masonry72SF
3Light Gauge Mtl. Framing @ New Opening4EA
4
5Steel Lintels - 5'4EA
63' x 4' Alum. Fixed Blade Louver48SF
7
8Access Ladder - Aluminum w/ Cage32VLF
9Access Door - 24" x 36"2EA
10
11Guard Railing - mechanical platform20LF
12Steel beam for platform20LF
13Platform grating60SF
14
15Steel framing for relocated AHU (2)80LF
16
17Caulk Removal, Grout Infill9EA
18
19T/O Shaft Enclosures22EA
20
21Threaded rod hangers for relocated AHU60LF
22
23Anchorage assemblies for platform/AHU framing12EA
24
25
26
27
Sheet Total

Sub No 1 Sheet 5

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB8 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionGeneral Construction SubcontractorsPrices by
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.General ConstructionUnit CostCostUnit CostCostCost
1Demo, concrete sidewalk3,800SF
2Demo, gravel bed3,800SF
3Dumpster6EA
4Debris haul/disposal2,400CF
5New cleanouts7EA
6Tie-ins/pipe fittings7EA
7Excavate2,400CF
8Backfill1,200CF
9New slab subbase3,800SF
10New concrete sidewalk7,600SF
11Sodding4,200SF
12Remove/store/transplant shrubs40EA
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Sheet Total

Sub No 3 Summary

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFBSheet9 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionMechanical SubcontractorPrices byAnastasi
Checked byAnastasi
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescription%QuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1Mechanical Sheet 1
2Mechanical Sheet 2
3Mechanical Sheet 3
4Plumbing Sheet 1
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19Subtotal
20
21
22
23
24
25Subcontractor Overhead10%
26Subtotal
27Subcontractor Profit10%
Sheet Total

Sub No 3 Sheet 1

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB10 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionMechanical SubcontractorPrices byDaihl
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1Replace MAU-1, Northeast Attic
2Demolition48MH
3AHU-1, 2,850 CFM, coils, CAV1EA
4Exhaust Fan, Inline centrifugal, 2,050 CFM1EA
5Ductwork, galvanized steel600lbs
6Insulation: 1-1/2", 1-1/2 lb board400SF
7Air devices126EA
8Controls24Pts.
9Testing and Balancing60MH
10
11Replace MAU-2, Southwest Attic
12Demolition48MH
13AHU-2, 2,200 CFM, coils, CAV1EA
14Exhaust Fan, Inline centrifugal, 1,350 CFM1EA
15Ductwork, galvanized steel600lbs
16Insulation: 1-1/2", 1-1/2 lb board400SF
17Air devices78EA
18Controls24Pts.
19Testing and Balancing40MH
20
21Fan Coil Units, 4-Pipe, Pre-Piped w/ valves and accessories (C-125)134EA
22Piping3/4" to 1" Dia, Type L2,787LF
23Control Valves268EA
24
25Ductwork Risers, galvanized steel7,280lbs
26Insulation: 1-1/2", 1-1/2 lb board4,160SF
27
Sheet Total

Sub No 3 Sheet 2

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB11 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionMechanical SubcontractorSubsPrices byDaihl
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1Piping4" Black Steel, insulated FG, glass cloth65LF
2Piping3" Black Steel, insulated FG, glass cloth260LF
3Piping2-1/2" Black Steel, insulated FG, glass cloth360LF
4Piping2" Black Steel, insulated FG, glass cloth195LF
5Piping1" to 1-1/2" Dia, Type L, insulated FG325LF
6Piping3/4" Dia, Type L, insulated FG1,850LF
74" Valves and Accessories (Class 125)6EA
83" Valves and Accessories (Class 125)10EA
92-1/2" Valves and Accessories (Class 125)10EA
101-1/4" to 1-1/2" Valves and Accessories (Class 125)20EA
113/4" Valves and Accessories (Class 125)125EA
12
13Piping1-1/4", Condensate drain680LF
14
15Piping2-1/2" Dia, Sched 80, Insulated FG, Glass Cloth, HTHW60LF
16Piping2" Dia, Sched 80, Insulated FG, Glass Cloth, HTHW30LF
17Piping1-1/2" Dia, Sched 80, Insulated FG, Glass Cloth, HTHW25LF
182-1/2" Valve, Gate (Class 300)2EA
192" Valves and Accessories (Class 300)6EA
201-1/2" Valves and Accessories (Class 300)6EA
21
22
23
24
25
26
27
Sheet Total

Sub No 3 Sheet 3

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB12 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionMechanical SubcontractorSubsPrices byDaihl
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1Unit Heater, 60-MBH, Horizontal, heating only4EA
2Controls, UHs9Pts
3
4Heat Exchanger, HTHW-to-HWR, Class 600, Dbl.-Wall1EA
5Expansion Tank1EA
6Air Separator, 2"1EA
7Testing and Balancing30MH
8Controls10Pts
9Pump, End suction, centrifugal, 7.5 hp1EA
10Pump, End suction, centrifugal, 5 hp2EA
11Equipment Insulation1Job
12
13Reinsulate Piping Mains In Attic, 3", FG Insulated300LF
14Reinsulate Piping Mains In Attic, 2-1/2", FG Insulated550LF
15Reinsulate Piping Mains In Attic, 2", FG Insulated1,000LF
16Reinsulate Piping Mains In Attic, 1-1/2", FG Insulated150LF
17Reinsulate Piping Mains In Attic, 1-1/4", FG Insulated200LF
18
19
20
21
22
23
24
25
26
27
Sheet Total

Sub No 3 Sheet 4

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB13 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionMechanical SubcontractorPrices byDaihl
PlumbingChecked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1Demolition, Mechanical room, Plumbing equipment40MH
2Demolition, Water closet assemblies155EA
3
4Water Closet, Floor Mounted, two piece, power assist, incl. pipe,etc61EA
5Lavatory w/ Trim, Vanity Top, includes pipe and valves122EA
6Fiberglass, one piece, Three Walls, 36" Square, inc. pipe and valves61EA
7
8
9Domestic Water Heater, Gas-Fired, condensing type, PVC Intake/Exh1EA
10Storage Tank, 80 gallon1EA
11Expansion Tank, 5 gallon1EA
12Domestic Water Hot Water Generator, 50 GPM Recovery1EA
13Circulating Pump, bronze, fractional horsepower2EA
14
15Piping3" Galvanized Steel, insulated FG, glass cloth50LF
16Piping2" Galvanized, insulated FG, glass cloth125LF
17Piping1" to 1-1/2" Dia, Type L, glass cloth, insulated FG98LF
18Piping3/4" Dia, Type L, glass cloth, insulated FG130LF
193" Valves and Accessories (Class 125)2EA
202" Valves and Accessories (Class 125)12EA
211-1/4" to 1-1/2" Valves and Accessories (Class 125)10EA
223/4" Valves and Accessories (Class 125)10EA
23
24Fire Protection Modifications - Mechanical Room
25Demolition750SF
26Sprinkler Piping Modifications1,200SF
27Drain and Refill40MH
Sheet Total

Sub No 4 Summary

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFBSheet14 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionElectrical SubcontractorPrices by
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescription%QuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1Electrical Sheet 1
2Electrical Sheet 2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19Subtotal
20
21
22
23
24
25Subcontractor Overhead10%
26Subtotal
27Subcontractor Profit10%
Sheet Total

Sub No 4 Sheet 1

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB15 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionElectrical SubcontractorPrices byBolt
Checked byBolt
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1Demolition160HR
2Tag, Protect and Retain Wiring/Cabling160HR
3Ceiling Mounted Lighting Fixtures (bathroom downlights)64EA
4Wall Mounted Lighting Fixtures (bathroom sinks)62EA
5Ceiling Mounted Lighting Fixtures (wet bar downlight)60EA
6Industrial Deep-V Lighting Fixtures5EA
7First Floor Bathroom Strip Lighting Fixtures2EA
8Outdoor Stair Lighting Fixtures15EA
9Outdoor Exit Lights9EA
10Outdoor Walkway Lights96EA
112x2 Recessed Parabolics46EA
12Jelly Jar Lighting Fixtures14EA
13Light Switches330EA
14Battery Inverter System1EA
15Receptacles, 20A, Duplex, Recess Mounted496EA
16Receptacles, GFI, 20A Duplex, Recess Mounted248EA
17Time Clock2EA
18Emergency Relays3EA
19Motor Connection, Single Phase150EA
20Motor Connection, Three Phase7EA
21Combination Motor Starter & 60A Safety Switch1EA
22Combination Motor Starter & 30A Safety Switch3EA
23Wire Trough2EA
243-Pole Motor Rated Switch2EA
25Thermal Motor Switch8EA
26150A c/b for Switchboard1EA
27Lighting Contactor, 6 Pole Electrically Operated, Electrically Held1EA
28Lighting Contactor, 10 Pole Electrically Operated, Electrically Held1EA
29Telecom Cover Plate with Ports/Jacks124EA
Sheet Total

Sub No 4 Sheet 2

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB16 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionElectrical SubcontractorPrices byBolt
Checked byBolt
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1#12 THHN conductors5,000LF
2#10 THHN conductors350LF
3#8 THHN conductors800LF
4#3 THHN conductors175LF
53/4" EMT2,000LF
63/4" Rigid500LF
71-1/2" EMT50LF
8
9225A, 208V Panelboard1EA
10
113 #12 Metal Clad (MC) Cable5,000LF
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Sheet Total

Sub No 5 Summary

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFBSheet17 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionFire Alarm SubcontractorPrices by
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescription%QuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1Fire Alarm Sheet 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19Subtotal
20
21
22
23
24
25Subcontractor Overhead10%
26Subtotal
27Subcontractor Profit10%
Sheet Total

Sub No 5 Sheet 1

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB18 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionFire Alarm SubcontractorPrices by
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1Demolition8HR
2
3Duct Mounted Smoke Detector4EA
4Addressable Relay6EA
5
6Programming and testing12HR
7
8FPLP Metal Clad Cable2,500LF
93/4" EMT500LF
10#16 TSSHPR1,100LF
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Sheet Total

Option Bid

ProjectRepair HVAC and Infrastructure Mathies Manor, B3621Project No.BXUR 08-0002
Bolling AFB19 of 19
Washington, D.C.Dated
Estimate Valid to
Trade/DivisionDesign/Built - Office spaces SW Wing first floorPrices by
Checked by
D:\Projects\….\032-33_FinalEst.xlsFinal Estimate IGE
ItemDescriptionQuantityUnitMaterialLaborTotal
No.Unit CostCostUnit CostCostCost
1Demolition - Walls & openings200SF
2
3New door, door frame, and hardware complete8EA
4New Gyp. Bd. & Mtl. Stud Wet Walls - bath room576SF
5New Gyp. Bd. & Mtl. Stud Interior Walls - office Rm. (no wet walls)656SF
6
7Wall Paint - Textured Acrylic Coating780SF
8Wall Paint Accent - Textured Acrylic Coating1,500SF
9
10Tiles, bath room fixtures, floor finishes, drop ceiling (under base bid)
11Sprinkler Piping Modifications Lounge Area1,200SF
12
13Lighting rearrange in Lounge area8HR
14
152x2 Recessed Parabolics16EA
16
17Design/Built fee1Job
18
19Subtotal
20
21
22
23
24
25Subcontractor Overhead
26Subtotal
27Subcontractor Profit
Sheet Total