Index.pdf

PDF 16 KB Posted

Attached to
Repair HTHW Phase 1 Federal contract opportunity
Solicitation number
FA7000-13-R-0017
Issued by
Department of the Air Force Headquarters Air Force Academy

About this file

Specifications Index

View the file

Other files for this federal contract opportunity

Other files attached to Repair HTHW Phase 1, newest first.
File Type Posted
FA7000-13-R-0017_Amendment_0002.pdf PDF
Repair_HTHW_Phase_1_Final_Questions_with_Answers.pdf PDF
FA7000-13-R-0017_Amendment_0001.pdf PDF
Addendum_No__1.pdf PDF
Davis_Bacon_WD_16_August_2013.pdf PDF
Site_Visit_Slides_Repair_HTHW_Phase_1.pdf PDF
Site_Visit_Attendance_Sheet_Repair_HTHW_Phase_1.pdf PDF
General_Requirements.pdf PDF
31_20_00_-_Earth_Moving.pdf PDF
03_30_00_-_Cast-In-Place_Concrete.pdf PDF
020800.pdf PDF
Specification_Cover.pdf PDF
FA7000-13-R-0017 _Repair_HTHW_Phase_1.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Davis_Bacon_WD_26_July_2013.pdf PDF
Mechanical.pdf PDF
Exterior_Improvements.pdf PDF
33_63_15_-_Hydronic_Distribution.pdf PDF
08_31_13_-_Horizontal_Access_Doors.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Air Force Academy Repair HTHW Phase 1/4

INDEX i (12145-3)

TABLE OF CONTENTS

Division 1 - General Requirements Section No. Section Title 00 10 00 Information For The Contractor 01 00 00 General Requirements 01 20 00 Project Meetings 01 33 00 Submittal Procedures 01 34 50 Core Environmental Requirements 01 35 00 Overarching Environmental Specifications 01 40 00 Quality Requirements 01 42 00 References 01 60 00 Product Requirements 01 73 10 Cutting and Patching 01 73 20 Selective Demolition 01 77 00 Closeout Procedures 01 78 39 Project Record Documents

Division 2 – Existing Conditions Section No. Section Title 02 08 00 Asbestos Abatement

Division 3 – Concrete Section No. Section Title 03 30 00 Cast-In-Place Concrete

Division 8 – Openings Section No. Section Title 08 31 13 Horizontal Access Doors

Division 23 – Heating Ventilating and Air Conditioning Section No. Section Title 23 00 00 Mechanical General Provisions 23 05 00 Basic Mechanical Materials and Methods 23 05 25 Industrial Valves 23 05 29 Hangers and Supports 23 05 50 Welding Pressure Pipe 23 07 00 Mechanical Insulation 23 21 15 High Temperature Hot Water Piping

Division 31 - Earthwork Section No. Section Title 31 20 00 Earth Moving

Division 32 – Exterior Improvements Section No. Section Title 32 12 16 Asphalt Paving 32 93 00 Site Restoration and Revegetation

Division 33 – Utilities Section No. Section Title 33 63 15 Hydronic Distribution (Prefabricated Conduit Piping System)

File details come from the government source that posted it. Updated .