Index.pdf
PDF 16 KB Posted
- Attached to
- Repair HTHW Phase 1 Federal contract opportunity
- Solicitation number
- FA7000-13-R-0017
About this file
Specifications Index
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA7000-13-R-0017_Amendment_0002.pdf | ||
| Repair_HTHW_Phase_1_Final_Questions_with_Answers.pdf | ||
| FA7000-13-R-0017_Amendment_0001.pdf | ||
| Addendum_No__1.pdf | ||
| Davis_Bacon_WD_16_August_2013.pdf | ||
| Site_Visit_Slides_Repair_HTHW_Phase_1.pdf | ||
| Site_Visit_Attendance_Sheet_Repair_HTHW_Phase_1.pdf | ||
| General_Requirements.pdf | ||
| 31_20_00_-_Earth_Moving.pdf | ||
| 03_30_00_-_Cast-In-Place_Concrete.pdf | ||
| 020800.pdf | ||
| Specification_Cover.pdf | ||
| FA7000-13-R-0017 _Repair_HTHW_Phase_1.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| Davis_Bacon_WD_26_July_2013.pdf | ||
| Mechanical.pdf | ||
| Exterior_Improvements.pdf | ||
| 33_63_15_-_Hydronic_Distribution.pdf | ||
| 08_31_13_-_Horizontal_Access_Doors.pdf |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Air Force Academy Repair HTHW Phase 1/4
INDEX i (12145-3)
TABLE OF CONTENTS
Division 1 - General Requirements Section No. Section Title 00 10 00 Information For The Contractor 01 00 00 General Requirements 01 20 00 Project Meetings 01 33 00 Submittal Procedures 01 34 50 Core Environmental Requirements 01 35 00 Overarching Environmental Specifications 01 40 00 Quality Requirements 01 42 00 References 01 60 00 Product Requirements 01 73 10 Cutting and Patching 01 73 20 Selective Demolition 01 77 00 Closeout Procedures 01 78 39 Project Record Documents
Division 2 – Existing Conditions Section No. Section Title 02 08 00 Asbestos Abatement
Division 3 – Concrete Section No. Section Title 03 30 00 Cast-In-Place Concrete
Division 8 – Openings Section No. Section Title 08 31 13 Horizontal Access Doors
Division 23 – Heating Ventilating and Air Conditioning Section No. Section Title 23 00 00 Mechanical General Provisions 23 05 00 Basic Mechanical Materials and Methods 23 05 25 Industrial Valves 23 05 29 Hangers and Supports 23 05 50 Welding Pressure Pipe 23 07 00 Mechanical Insulation 23 21 15 High Temperature Hot Water Piping
Division 31 - Earthwork Section No. Section Title 31 20 00 Earth Moving
Division 32 – Exterior Improvements Section No. Section Title 32 12 16 Asphalt Paving 32 93 00 Site Restoration and Revegetation
Division 33 – Utilities Section No. Section Title 33 63 15 Hydronic Distribution (Prefabricated Conduit Piping System)