Changes_to_PWS _25_Aug_2016.pdf

PDF 41 KB Posted

Attached to
Dobbins Base Operating Support (BOS) Services Federal contract opportunity
Solicitation number
FA6703-16-R-0008
Issued by
Department of the Air Force Reserve Command

About this file

Listing of changes to the PWS

View the file

Other files for this federal contract opportunity

Other files attached to Dobbins Base Operating Support (BOS) Services, newest first.
File Type Posted
Notice_Details _FA6703-16-R-0008 _13_Sep_2016.pdf PDF
FA6703-16-R-0008 _Conformed_Copy.pdf PDF
FA6703-16-R-0008-0003.pdf PDF
Attachment_1 _Dobbins_PWS_Revision_2 _9_Sep_2016.pdf PDF
FA6703-16-R-0008-0004.pdf PDF
Changes_to_PWS_Revision_2 _9_Sep_2016.pdf PDF
Dobbins_PWS_Revision_2 _9_Sep_2016.pdf PDF
Changes_to_PWS_Revision_2 _9_Sep_2016.pdf PDF
MFR_-_Draft_Amendment_FA6703-16-R-0008-P0003.pdf PDF
Attachment_4_Pricing_Matrix_Rev_2.xlsx XLSX spreadsheet
F-TE-7-D-1_-_Electrical_Distribution_Plan_Sht4.pdf PDF
Attachment_12 _Vehicle_Master_List _24_Aug_2016_for_PWS.pdf PDF
F-TE-7-E-1_-_Water_Map_Sht4_2011.pdf PDF
F-TE-7-D-1_-_Electrical_Distribution_Plan__Sht3.pdf PDF
F-TE-7-E-2_-_Sewer_Sheet_3.pdf PDF
F-TE-3-C-1_rev4.pdf PDF
F-TE-7-E-3_-_Storm_Drainage_Sheet_1.pdf PDF
F-TE-7-L_-_Outfall_Directions.pdf PDF
F-TE-7-E-1_-_Water_Map_Sht1_2011.pdf PDF
F-TE-7-E-3_-_Storm_Drainage_Sheet_3.pdf PDF
Attachment_4 _Pricing_Matrix _20160824.xlsx XLSX spreadsheet
F-TE-7-E-1_-_Water_Map_Sht3_2011.pdf PDF
F-TE-7-H_-_Gas_Sheet_3.pdf PDF
F-TE-7-H_-_Gas_Sheet_2.pdf PDF
Attachment_1 _Pre-Proposal_Conference_Roster.pdf PDF
F-TE-7-C-5_-_AIRFIELD_DIAGRAM_(MARKINGS).pdf PDF
F-TE-7-G_-__Liquid_Fuel_System.pdf PDF
Attachment_1 _Dobbins_PWS_Revision_1 _25_Aug_2016.pdf PDF
F-TE-7-E-2_-_Sewer_Sheet_2.pdf PDF
FA6703-16-R-0008-0002.pdf PDF
Dobbins_ARB_Forestry_Road_Map.pdf PDF
F-TE-7-E-3_-_Storm_Drainage_Sheet_4.pdf PDF
F-TE-7-D-1_-_Electrical_Distribution_Plan_Sht2.pdf PDF
F-TE-7-E-2_-_Sewer_Sheet_1.pdf PDF
F-TE-7-E-3_-_Storm_Drainage_Sheet_2.pdf PDF
Attachment_13 _Solicitation_FA6703-16-R-0008 _Questions_ _Answers.pdf PDF
F-TE-7-D-1_-_Electrical_Distribution_Plan_Sht1.pdf PDF
F-TE-7-H_-_Gas_Sheet_4.pdf PDF
Dobbins_ARB_Integrated_Pest_Management_Plan_-_2010-update.pdf PDF
FA6703-16-R-0008-0001.pdf PDF
Attachment_2 _Dobbins_GFP_5_April_2016.pdf PDF
Attachment_7 _Dpt_of_Labor_Building _GA160134 _20160520 _GA134.pdf PDF
FA6703-16-R-0008 _Base_Operating_Support_(BOS)_Services_Solicitation.pdf PDF
Attachment_6 _Department_of_Labor_Determination _2015-2133_Rev_2_20160617.pdf PDF
Attachment_8 _Dpt_of_Labor_Heavy _GA160079 _20160311 _GA79.pdf PDF
Attachment_10 _CBA_2014-6619.pdf PDF
Atch_4 _Pricing_Matrix _20160701.xlsx XLSX spreadsheet
Attachment_5 _Statement_of_Equivalent_Rates.pdf PDF
Attachment_11 _Preauthorization_Group _Special_Request_Form_DARB4.pdf PDF
Draft_Performance_Work_Statement _26_May_2016.pdf PDF
Show all 50

Dobbins Base Operating Support (BOS) Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS REVISION 1, 25 AUG 16

List of Changes.

Tab A

A17.2.2.1—Changed Pittsburgh ARS to Dobbins ARB

A17.3 – Changed To Read: A17.3 Residual Inventory. The government will provide to the contractor any existing government-owned residual inventory of materials, parts and supplies which is available as of operational performance period. A joint government and KTR inventory of residual materials, parts and supplies shall be accomplished NLT 5 calendar days prior to start of the operational performance period to identify and make a record of all usable residual inventory. The KTR will store, issue and utilize this residual inventory prior to the purchasing of such and claiming reimbursement from the government.

A-TE-3, A03—Changed QA Manager to QC Manager

A-TE-3, A08—“retention of key personnel” has been removed from the para.

Tab B

B2.4-Added: (See B-TE-1, SDSB19 and SDSB20)

B2.4.1-Changed SDSB10 to SDSB09

B3.3-Change SDSB08 to SDSB16

B4.11-Deleted SDSB08

B-TE-2—Added M-50 mask workload.

Tab C

C-TE-2b Vehicle Management Workload—Workload changed as stated in Q&As.

C-TE-2d(2) Vehicle Master List (VML)-Deleted Table and added as an attachment to the PWS.

Tab D

D1.3 - Added: Hours of operation for Small Terminal Operations will be Monday thru Friday 0730L - 1600L.

Support for the UTA shuttle will be required will be required Friday and Sunday (Main/Alt UTA Weekends Only) from 1600L - 2300L.

D4.9.1-Changed to RESERVED.

D4.9.2-Changed To: D4.9.2 The Ktr shall be responsible for receiving all freight coming into base through the Receiving Section of TMO. The Ktr shall unload various types of property utilizing material handling equipment when necessary.

Received material shall be located in appropriate transitory holding area for physical inspection. Packages that have been inspected will be clearly marked with a stamp, sticker or other appropriate method determined by the Ktr. (See D-TE-1, SDSD08)

D4.9.3-Deleted “and/or x-rayed” from first sentence.

D4.9.4-Added “IAW AFI 24-203” to the first sentence.

D-TE-2- Added “Monthly” to D-TE2 in front of Average.

Tab E

Added the below to TE-4

LMR Radios Motorola 4 Charger, Radio Batteries 1 LMR Base Station Motorola 3

Tab F

F4.3.1.2 Customer Service (Work Control): Removed “supervisor” from the third sentence from the end of the paragraph and replaced with “Manager”.

F5.1.2 BUILDERTM Data: Added “deliver to the COR” to the first sentence of the paragraph.

F5.17.1.3 Air Distribution Systems: Amended the paragraph to read. “The KTR shall visually inspect and clean air intake/distribution/exhaust grilles, registers, and diffusers for security, unrestricted air flow and cleanliness. All work will be ordered under the Labor for Service Call CLIN of the contract.”

F5.19.1.1.1 Added the following to the end of the paragraph. “Cleaning of light fixtures will be ordered by the BCE under the Labor for Service Call CLIN of the contract.”

F5.19.1.2.1 Added the following to the end of the paragraph. “Cleaning of light fixtures will be ordered by the BCE under the Labor for Service Call CLIN of the contract.”

F5.19.1.2.1.1 Removed the phrase “by the BCE.” and added the following to the end of the paragraph. “…ordered by the BCE under the Labor for Service Call CLIN of the contract.”

F5.20.1.1 Add new paragraph. “For this specific requirement, testing that may require a load bank will not be accomplished, unless the BCE determines specific generator load testing is required. Any generator testing which will require a load bank shall be ordered by the BCE under the Labor for Service Call CLIN of the contract.”

F5.23 Ground and Lightning Arrestor Testing: Removed “…for Lightning Protection for Air Force Facilities (AMMO 47)…”, and added “…online course Ammo-47-DL Air Force Electrical Explosive Safety”…

F6.1.2.5 Vegetation Control Perimeter and Security Fences: Paragraph has been amended to read “The KTR shall trim back vegetation including brush, trees and vines from both sides and top of perimeter and all other security fences for a distance of 6' on the inside of fence and the distance outside the perimeter fence will be to the property line, but not to exceed 6'. Frequency and standard for perimeter and security fence vegetation control are the same as for grass cutting on improved grounds. Tree trimming/pruning/removal shall be done IAW paragraphs F6.16.1 and F6.1.6.1.3, ordered by the BCE, and accomplished under the Labor for Service Call CLIN of the contract.”

F-TE-2a insert into following item 1.3 at the end of the sentence – “Semi-improved grounds, perimeter and security fences and edges of wooded areas, 1740 acres. (F6.1.2.6) Frequency is weekly.”

F-TE-2g: HVAC Filter Location and Quantities. Amended:

F-TE-6 Added the following MAS sheets:

MAS #18d: CENTRAL AC/AIR HANDLING SYSTEM – Chiller, Centrifugal, Water Cooled, Up to 100 tons – PM System D3035 140 1950 - over 100 tons – PM System D3035 140 2950 MAS #18e: CENTRAL AC/AIR HANDLING SYSTEM – Chiller, Screw, Water Cooled, Up to 100 tons – PM System D3035 160 1950 - over 100 tons – PM System D3035 140 2950

Tab G

G2.1 - Changed all references to Fuels Foreman to Fuels Manager.

G4. - Change one day notice to 72 hours.

G9. – Changed To Read: G9 Compliance, Environmental and Plans. The Ktr shall serve as the Subject Matter Expert for fuel related matters. The Ktr shall review, update, and provide fuels input to base plans, and submit input to the AO for approval. The Ktr shall report fuel mishaps, appoint an Environmental Coordinator, and establish an internal self-inspection program IAW Tab-A.

File details come from the government source that posted it. Updated .