Questions and Answers.pdf
PDF 175 KB Posted
- Attached to
- Sustain Airfield Marking and Rubber Removal
- Solicitation number
- FA665620B0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA665620B00010002 SF 30.pdf | ||
| Agenda for Site Visit.docx | DOCX document | |
| Bid Opening Base Access Requirements.docx | DOCX document | |
| Site Visit Sign-In Sheet.pdf | ||
| Bid Opening Employee Data Sheet.xlsx | XLSX spreadsheet | |
| Questions and Answers II.docx | DOCX document | |
| Questions and Answers II.docx | DOCX document | |
| Questions and Answers.docx | DOCX document | |
| Solicitation Amendment FA665620B00010001 SF 30.pdf | ||
| Attachment 1 Wage Determination.pdf | ||
| Attachment 3 910th Drawings Sustain Airfield Markings and Rubber Removal.pdf | ||
| Attachment 5 Question Submission Form.doc | DOC document | |
| Attachment 4 Responsibility Questionnaire Rubber Removal.docx | DOCX document | |
| Solicitation FA665620B0001.pdf | ||
| Attachment 2 910th Bid Specification Manual Sustain Airfield Markings and Rubber Removal.pdf | ||
| Attachment 6 - page 3 Employee Data Sheet.xlsx | XLSX spreadsheet | |
| Attachment 6 - page 1 and 2 Base Access requirements - site visit.docx | DOCX document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
26 Jun 2020
From: 910th Base Civil Engineering Youngstown Air Reserve Station
3976 King Graves Road, Bldg 510 Vienna, Ohio 44473
RE: RFI-1 Project # ZQEL 20-0001 Sustain Airfield Markings & Rubber Removal
SAF- Zach Bloss / Dawn – Dave Butler
Dawn Incorporated Page Section Para Question
01 00 00 3.2a The para references bidding the 1000 LF of additional rubber removal in
LF. The solicitation only has one line item. Will a separate line item be added for the additional rubber removal?
Answer: Please omit the 1000 L.F. of additional rubber removal from the bid. The areas given at each end of the LZ cover the rubber removal needed. See amendment 2.
01 00 00 3.2a What width should be used when calculating the lineal foot of rubber removal?
Answer: N/A due to being omitted.
32 17 23 2.1.1.
Indicates the paint is to be removed. Please verify the intent is to paint over existing markings and not remove them prior to painting.
Answer: Please RED line out where stated paint is to be removed. All painted surfaces are is good condition to accept repainting.
Plans Is the intent to repaint the white background on the “Warning Restricted
Area” boxes?
Answer: The “Warning Restricted Area Boxes will require new white background paint with red lettering.
DEPARTMENT OF THE AIR FORCE
AIR FORCE RESERVE COMMAND
DEPARTMENT OF THE AIR FORCE
AIR FORCE RESERVE COMMAND
Will the contractor be responsible for coordinating with the FAA for any NOTAM required to be issued or will this be handled by base personnel?
Answer: All coordination with the FAA will be handled by CE. NOTAMS are not applicable, LZ closure will be reported on ATIS (Automatic Terminal Information Service.
If existing markings are not removed, how will any areas, of existing markings, that are flaking be handled prior to applying new stripping.
Answer: All areas appear to be in good condition for repainting. If there should be an area showing some flaking, it will need to be removed prior to painting.
Will the contractor be required to provide closed runway X’s at each end of the assault strip and barricades at taxiway entrances and on the parking ramp during phases?
Answer: Closure X’s on the LZ are not required and any barricades/traffic cones needed for the taxiways will be handled by CE.
SAF INC
At the site visit it was mentioned that the existing Stripping did not need removed before repainting. Please confirm if this is true.
Answer: Correct, there is no paint removal to be performed.
3.2a In section 3.2a of the specs it notes “For spot removal of rubber outside of AREA’s A & B, there is approximately 1,000 lineal feet to be removed.
Please bid this item in linear Feet, so if there is additional linear footage to have removed this will be the unit price used.” Does that mean 1,000 lineal feet x 60’ wide? Or is that supposed to mean 1,000 sq ft?
Answer: Disregard the additional 1000 L.F. All areas to have rubber removal are covered within the areas given at each end of the LZ.
3.2a Pending the response for the question above, the bid sheet only lists 1 bid item and does not account for any additional pricing of the potential extra 1,000 feet. How should we price that item?
Answer: N/A due to the omission.
When does the government anticipate having this work performed?
Answer: Funds are not currently available for the award of this project. Notice to Proceed will be issued as soon as Funds are available.
Does the contractor need to provide any barricades for either the rubber removal, or stripping of any areas?
Answer: No barricades are required, CE will take care of barricades if needed when Stripping on the apron taxiway area. (paint drying time is so short, never have used them before)
Should there be any further questions, please feel free to contact the 910th Contracting Office at your convenience at 330.609.1523 or email: ashley.senich@us.af.mil or
330.609.1212 or email: joseph.perry.14@us.af.mil
Respectfully, Donald J. Cutrer
DONALD J. CUTRER, GS-12, USAF
AFRC 910 MSG/CE
910th Civil Engineering DSN: 346-1062 Comm: (330)609-1062 Email: donald.cutrer.1@us.af.mil
910_MSG/CE/PROJECTS-ZQEL/2020-0001/PROGRAMMING/RFI-1 SAF/DAWN