Questions-Responses_May_2015.doc
DOC document 28 KB Posted
- Attached to
- Repair Roofs Bldg 821 and Bldg 617
- Solicitation number
- FA6633-15-B0006
About this file
Questions-Responses
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions-Responses_May_2015.doc | DOC document | |
| Technical_Specifications-BOTH_PROJECTS.pdf | ||
| Drawings_B617.pdf | ||
| Wage_Determination_MN36.doc | DOC document | |
| Amendment_0003.doc | DOC document | |
| Drawings_B821.pdf | ||
| Amendment_0002.doc | DOC document | |
| Amendment_0001.doc | DOC document | |
| REV_Technical_Drawings_05May15.pdf | ||
| B617_ADDENDUM__1.pdf | ||
| SV_Attendance_Roster_29Apr15.pdf | ||
| Site_Visit_Minutes_23Apr15.pdf | ||
| Bldg_617_-_QJKL_14-0020_-_Drawings.pdf | ||
| SF_24_Bid_Bond_Form.pdf | ||
| Wage_Determination_MN36.doc | DOC document | |
| Bldg_821_-_QJKL_14-0014_-_Drawings.pdf | ||
| Financial_Responsibility_Sheet.doc | DOC document | |
| Technical_Specs_-_Both_Projects.pdf | ||
| FA6633-15-B0006 _IFB.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sol #FA6633-15-B0006
Site Visit Questions & Responses April 2015
FA6633-15-B-0006/QJKL 14-0014 & QJKL 14-0020
Repair Roofs, Building 821 & Building 617
1. QUESTION: BLDG 617: Per plans and specs, 16 gauge is specified for gutter. Is 24 gauge okay? 24 gauge is in industry standard.
RESPONSE: Yes, it should read 24 gauge, the drawings mistakenly indicate 16G. This will be corrected in a forthcoming Amendment.
2. QUESTION: BLDG 617: The plans shows two layers of 2” ISO but that is only R 25. You are requesting an R value of 33. Do you want 3 layers of ISO, or are you icluding the planking and hard board in the R value?
RESPONSE: The R value for the roof should be a total of 33, the drawings mistakenly indicate an R value of 33 for each layer. The layers of insulation should be: two layers of ISO, one layer of planking and one layer of fiber board, totaling 33. This will be corrected in a forthcoming Amendment.
3. QUESTION: BLDG 821: Can 60 mil EPDM be used instead of the vinyl roofing specified in the plans?
RESPONSE: No, bid according to the specifications provided for this building.
MAY 2015 (SEE Amendment 0001)