B617_ADDENDUM__1.pdf
PDF 37 KB Posted
- Attached to
- Repair Roofs Bldg 821 and Bldg 617
- Solicitation number
- FA6633-15-B0006
About this file
Addendum 01 - 05May15
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions-Responses_May_2015.doc | DOC document | |
| Technical_Specifications-BOTH_PROJECTS.pdf | ||
| Drawings_B617.pdf | ||
| Wage_Determination_MN36.doc | DOC document | |
| Amendment_0003.doc | DOC document | |
| Drawings_B821.pdf | ||
| Amendment_0002.doc | DOC document | |
| Amendment_0001.doc | DOC document | |
| REV_Technical_Drawings_05May15.pdf | ||
| SV_Attendance_Roster_29Apr15.pdf | ||
| Questions-Responses_May_2015.doc | DOC document | |
| Site_Visit_Minutes_23Apr15.pdf | ||
| Bldg_617_-_QJKL_14-0020_-_Drawings.pdf | ||
| SF_24_Bid_Bond_Form.pdf | ||
| Wage_Determination_MN36.doc | DOC document | |
| Bldg_821_-_QJKL_14-0014_-_Drawings.pdf | ||
| Financial_Responsibility_Sheet.doc | DOC document | |
| Technical_Specs_-_Both_Projects.pdf | ||
| FA6633-15-B0006 _IFB.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA6633-15-B0006
Amendment 0001 05 May 2015
ADDENDUM #1
FA6633-15-B0006, Repair Roofs Bldg 617
Project QJKL 14-0020
Reference Drawing T-01
Add the following notes:
CORRECTIONS: (5 MAY, 2015)
ALL GALVANIZED STEEL SHOULD BE 24 GA.
THE TOTAL R-VALUE FOR ALL
LAYERS OF INSULATION SHOULD EQUAL 33.
Revised 5 May, 2015 By Kyle Turner, Engineering Technician for the 934th Civil Engineering
Reference Drawing A-01
Change the following note:
6/A-01|A-01 FURNISH AND INSTALL NEW PREFIN. METAL D.S. SET IN 14 GA STL
LINER. CONT. SEAL & RODSTOCK AT PERIMETER
To:
6/A-01|A-01 FURNISH AND INSTALL NEW PREFIN. METAL D.S. SET IN 24 GA STL
LINER. CONT. SEAL & RODSTOCK AT PERIMETER
Reference Drawings A-02
Add the following note:
1, 2, 3, 4/A-02|A-01 THE TOTAL R-VALUE FOR ALL LAYERS SHOULD EQUAL 33.
1 & 2/A-02|A-01 FURNISH AND INSTALL NEW 12 GA. GLV. STL. GUTTERS @ N. & S.
WALLS; DRAIN TO PILASTERS; RETURN EDGE FOR SEAL @ PVC FLASHING (TYP.)
To:
1 & 2/A-02|A-01 FURNISH AND INSTALL NEW 24 GA. GLV. STL. GUTTERS @ N. & S.
WALLS; DRAIN TO PILASTERS; RETURN EDGE FOR SEAL @ PVC FLASHING (TYP.)
3 & 4/A-02|A-01 CONT. GALV. KEEPER 20 GA. MIN. VERIFY
To:
3 & 4/A-02|A-01 CONT. GALV. KEEPER 24 GA. MIN. VERIFY
1, 2, 3, & 4/A-02|A-01 FURNISH AND INSTALL NEW 2” POLYISOCYANURATE INSUL
FA6633-15-B0006
Amendment 0001 05 May 2015
R-VALUE 33
U-VALUE 0.03
1, 2, 3, & 4/A-02|A-01 FURNISH AND INSTALL NEW 2” POLYISOCYANURATE INSUL
Reference Drawing A-03
1/A-03|A-03 CONT. KEEPER 20 GA. MIN VERIFY & COORD.
1/A-03|A-03 CONT. KEEPER 24 GA. MIN VERIFY & COORD.
1/A-03|A-03 FURNISH AND INSTALL NEW 2” POLYISOCYANURATE INSUL
R-VALUE 33
U-VALUE 0.03
1/A-03|A-03 FURNISH AND INSTALL NEW 2” POLYISOCYANURATE INSUL
1/A-03|A-03 THE TOTAL R-VALUE FOR ALL LAYERS SHOULD EQUAL 33.
Reference Drawing A-04
5/A-04|A-01 FURNISH AND INSTALL NEW 2” POLYISOCYANURATE INSUL
R-VALUE 33
U-VALUE 0.03
5/A-04|A-01 FURNISH AND INSTALL NEW 2” POLYISOCYANURATE INSUL
5/A-04|A-01 THE TOTAL R-VALUE FOR ALL LAYERS SHOULD EQUAL 33.
File details come from the government source that posted it. Updated .