Specs_Page_10_section_33_30_00EN.pdf

PDF 72 KB Posted

Attached to
Repair Sewer Lines Area 1 Federal contract opportunity
Solicitation number
FA5575-18-B-0001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Specifications in English

View the file

Other files for this federal contract opportunity

Other files attached to Repair Sewer Lines Area 1, newest first.
File Type Posted
Solicitation_-_FA557519BA002_(1).pdf PDF
Spanish_Specifications_17-1006.pdf PDF
06_Cost_Estimate_17-1006_KTR.xls XLS spreadsheet
Submittals_AF66_17-1006.xlsx XLSX spreadsheet
Drawings_17-1006.pdf PDF
English_Specifications_17-1006.pdf PDF
FA5575-18-B-0001-10001,_Sewer_Lines.pdf PDF
Contractor_Cost_Estimate_V2.xlsx XLSX spreadsheet
Specs_Page_10_section_33_30_00SP.pdf PDF
FA5575-18-B-0001,_Sewer_Lines.pdf PDF
QUESTIONS_AND_ANSWERS_FOR_SEWER_LINES_AREA_1_PROJECT.pdf PDF
Specs_17-1012_en.pdf PDF
Drawings_17-1012.pdf PDF
Blank_cost_Estimate_KTR_17-1012.xlsx XLSX spreadsheet
Specs_17-1012_sp.pdf PDF
AF66_17-1012.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT QUUG 17-1012

33 30 00 - 10 determined by the Engineer wherever excavation is made through pavement, sidewalk or driveways. In sidewalk areas the temporary bituminous resurfacing shall be at least 25 mm thick; in all other areas it shall be at least 50 mm thick. At major intersections and other critical locations, a greater thickness may be ordered. Temporary resurfacing shall be placed as soon as the condition of the backfill is suitable to receive it and shall remain in place until the condition of the backfill is suitable for permanent resurfacing.

3.3.2 Permanent Resurfacing: Unless otherwise specified on the plans or in the Special Provisions, all surface improvements damaged or removed as a result of the contractor'’ operations shall be reconstructed by the contractor to the same dimensions, except for pavement thickness, and with the same type materials used in the original work. Trench resurfacing shall be 25 mm greater in thickness than existing pavement.

3.4 OBSTRUCTIONS DURING WORK EXECUTION:

3.4.1 In case of finding underground obstructions during the sewer pipe excavation, said obstructions shall be demolished and the excavation restored. In order to account for this potential fact an additive item computation has been considered in the project to include the following specific items:

a. Demolish underground concrete block (3 meters deep, 2x2x2 meters) and restore terrain: account for 30 units.

b. Supply/install PVC corrugated pipe DN250 mm: account for 150 linear meters.

c. Supply/install new complete sewer manhole: account for 8 units

d. Road crossing (15 meters long): account for 10 units.

*** END OF SECTION ***