AF66_17-1012.xlsx
XLSX spreadsheet 31 KB Posted
- Attached to
- Repair Sewer Lines Area 1 Federal contract opportunity
- Solicitation number
- FA5575-18-B-0001
About this file
AF66 17-1012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_-_FA557519BA002_(1).pdf | ||
| 06_Cost_Estimate_17-1006_KTR.xls | XLS spreadsheet | |
| Submittals_AF66_17-1006.xlsx | XLSX spreadsheet | |
| Drawings_17-1006.pdf | ||
| English_Specifications_17-1006.pdf | ||
| Spanish_Specifications_17-1006.pdf | ||
| FA5575-18-B-0001-10001,_Sewer_Lines.pdf | ||
| Contractor_Cost_Estimate_V2.xlsx | XLSX spreadsheet | |
| Specs_Page_10_section_33_30_00EN.pdf | ||
| Specs_Page_10_section_33_30_00SP.pdf | ||
| FA5575-18-B-0001,_Sewer_Lines.pdf | ||
| QUESTIONS_AND_ANSWERS_FOR_SEWER_LINES_AREA_1_PROJECT.pdf | ||
| Drawings_17-1012.pdf | ||
| Blank_cost_Estimate_KTR_17-1012.xlsx | XLSX spreadsheet | |
| Specs_17-1012_sp.pdf | ||
| Specs_17-1012_en.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | ||
| QUUG 17-1012 | PROJECT TITLE |
RPR SEWER LINES AREA 1
SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECTION 01 11 00 | ||||
| 1 | Construction Schedule | 1 | NTP+5 | |
| 2 | Work Plan | 1 | NTP+5 | |
| 3 | Work Phasing Plan | 1 | NTP+10 | |
| SECTION 01 11 01 | ||||
| 4 | Progress Schedule | 1 | NTP+5 | |
| 5 | Mobility Plan | 1 | NTP+5 | |
| 6 | Quality Control Plan | 1 | NTP+10 | |
| 7 | Waste & construction debris management | 1 | Final Inspection | |
| 8 | As-Built drawings | 1 | FI+15 | |
| 9 | Spatial Data | 1 | FI+15 | |
| 10 | Key Personnel | 1 | NTP+15 | |
| 11 | Safety Program | 1 | Before any work execution | |
| 12 | Warranty letter | 1 | Acceptance+15 | |
| SECTION 33 30 00 | ||||
| 13 | PVC pipe and fittings | 1 | ||
| 14 | Round manhole (less than 1.2 m depth) | 1 | ||
| 15 | Round manhole (more than 1.2 m depth) | 1 | ||
| 16 | Round manhole frame and cover | 1 | ||
| 17 | Sewer pipe protection film and sealant | 1 | ||
| 18 | Plan and topographic profile for new pipe installation | 1 |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| QUUG 17-1012 | TÍTULO DE PROYECTO: | |||
| REPARAR TUBERÍAS DE SANEAMIENTO, ÁREA 1 | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
FECHA RECEPCIÓN EN CONTRATACIÓN
fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
FECHA LÍMITE DE DEVOLUCIÓN
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
NÚMERO DE MUESTRA
fergusog: Enter the Submittal Number
FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA
fergusog: Enter Resubmittal Number
APROBACIÓN FINAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
OBSERVACIONES
fergusog: Enter any comments pertaining to the submittal
APROBADO
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DESAPROBADO
fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal
| SECCIÓN 01 11 00 | ||||
| 1 | Programa de obra | 1 | NTP+5 | |
| 2 | Plan de obra | 1 | NTP+5 | |
| 3 | Plan de fases del trabajo | 1 | NTP+10 | |
| SECCIÓN 01 11 01 | ||||
| 4 | Programa de ejecución | 1 | NTP+5 | |
| 5 | Plan de movilización | 1 | NTP+5 | |
| 6 | Plan de control de calidad | 1 | NTP+10 | |
| 7 | Gestión de residuos y escombros | 1 | Inspección final | |
| 8 | Planos As-Builts | 1 | IF+15 | |
| 9 | Datos espaciales | 1 | IF+15 | |
| 10 | Personal clave | 1 | NTP+15 | |
| 11 | Plan de seguridad | 1 | Antes de cualquier trabajo | |
| 12 | Carta de garantía | 1 | Aceptación + 15 | |
| SECCIÓN 33 30 00 | ||||
| 13 | Tubería y accesorios | 1 | ||
| 14 | Arquetas de registro circulares menores de 1.2 m de profundidad | 1 | ||
| 15 | Pozos de registro circulares mayores de 1.2 m de profundidad | 1 | ||
| 16 | Marcos y tapas de pozos de registro circulares | 1 | ||
| 17 | Lámina de protección y sellante para tubería de saneamiento | 1 | ||
| 18 | Planta y perfil topográfico para instalación de nueva tubería | 1 |