AF66_17-1012.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Repair Sewer Lines Area 1 Federal contract opportunity
Solicitation number
FA5575-18-B-0001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

AF66 17-1012

View the file

Other files for this federal contract opportunity

Other files attached to Repair Sewer Lines Area 1, newest first.
File Type Posted
Solicitation_-_FA557519BA002_(1).pdf PDF
06_Cost_Estimate_17-1006_KTR.xls XLS spreadsheet
Submittals_AF66_17-1006.xlsx XLSX spreadsheet
Drawings_17-1006.pdf PDF
English_Specifications_17-1006.pdf PDF
Spanish_Specifications_17-1006.pdf PDF
FA5575-18-B-0001-10001,_Sewer_Lines.pdf PDF
Contractor_Cost_Estimate_V2.xlsx XLSX spreadsheet
Specs_Page_10_section_33_30_00EN.pdf PDF
Specs_Page_10_section_33_30_00SP.pdf PDF
FA5575-18-B-0001,_Sewer_Lines.pdf PDF
QUESTIONS_AND_ANSWERS_FOR_SEWER_LINES_AREA_1_PROJECT.pdf PDF
Drawings_17-1012.pdf PDF
Blank_cost_Estimate_KTR_17-1012.xlsx XLSX spreadsheet
Specs_17-1012_sp.pdf PDF
Specs_17-1012_en.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
QUUG 17-1012PROJECT TITLE

RPR SEWER LINES AREA 1

SOLICITATION / CONTRACT NO.

(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATE

fergusog: Enter the due date from the Contractor (MM/DD/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (MM/DD/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

SUBMITTAL NUMBERS

fergusog: Enter the Submittal Number

DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

REMARKS

fergusog: Enter any comments pertaining to the submittal

APPROVED

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DISAPPROVED

fergusog: Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECTION 01 11 00
1Construction Schedule1NTP+5
2Work Plan1NTP+5
3Work Phasing Plan1NTP+10
SECTION 01 11 01
4Progress Schedule1NTP+5
5Mobility Plan1NTP+5
6Quality Control Plan1NTP+10
7Waste & construction debris management1Final Inspection
8As-Built drawings1FI+15
9Spatial Data1FI+15
10Key Personnel1NTP+15
11Safety Program1Before any work execution
12Warranty letter1Acceptance+15
SECTION 33 30 00
13PVC pipe and fittings1
14Round manhole (less than 1.2 m depth)1
15Round manhole (more than 1.2 m depth)1
16Round manhole frame and cover1
17Sewer pipe protection film and sealant1
18Plan and topographic profile for new pipe installation1

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
QUUG 17-1012TÍTULO DE PROYECTO:
REPARAR TUBERÍAS DE SANEAMIENTO, ÁREA 1SOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGA

fergusog: Enter the due date from the Contractor (MM/DD/YY)

FECHA RECEPCIÓN EN CONTRATACIÓN

fergusog: Enter the date received from the Contractor. (MM/DD/YY) FECHA EN INGENIERíA CIVIL fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)

FECHA LÍMITE DE DEVOLUCIÓN

fergusog: Enter the date the submittal is due back from CE

(MM/DD/YY)

NÚMERO DE MUESTRA

fergusog: Enter the Submittal Number

FECHA NOTIFICACIÓN A CONTRATISTA SEGUNDA PRESENTACIÓN DEL CONTRATISTA

fergusog: Enter Resubmittal Number

APROBACIÓN FINAL

fergusog: Enter the submittal final approval date

(MM/DD/YY)

OBSERVACIONES

fergusog: Enter any comments pertaining to the submittal

APROBADO

fergusog: Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

fergusog: Enter Resubmittal Number

DESAPROBADO

fergusog: Enter date the Contractor was notified of submittal disapproval fergusog: Enter the submittal final approval date fergusog: Enter any comments pertaining to the submittal

SECCIÓN 01 11 00
1Programa de obra1NTP+5
2Plan de obra1NTP+5
3Plan de fases del trabajo1NTP+10
SECCIÓN 01 11 01
4Programa de ejecución1NTP+5
5Plan de movilización1NTP+5
6Plan de control de calidad1NTP+10
7Gestión de residuos y escombros1Inspección final
8Planos As-Builts1IF+15
9Datos espaciales1IF+15
10Personal clave1NTP+15
11Plan de seguridad1Antes de cualquier trabajo
12Carta de garantía1Aceptación + 15
SECCIÓN 33 30 00
13Tubería y accesorios1
14Arquetas de registro circulares menores de 1.2 m de profundidad1
15Pozos de registro circulares mayores de 1.2 m de profundidad1
16Marcos y tapas de pozos de registro circulares1
17Lámina de protección y sellante para tubería de saneamiento1
18Planta y perfil topográfico para instalación de nueva tubería1

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N