Contractor Cost Estimate

View the file

Other files for this federal contract opportunity

Other files attached to Repair Sewer Lines Area 1, newest first.
File Type Posted
Spanish_Specifications_17-1006.pdf PDF
Solicitation_-_FA557519BA002_(1).pdf PDF
06_Cost_Estimate_17-1006_KTR.xls XLS spreadsheet
Submittals_AF66_17-1006.xlsx XLSX spreadsheet
Drawings_17-1006.pdf PDF
English_Specifications_17-1006.pdf PDF
Specs_Page_10_section_33_30_00SP.pdf PDF
FA5575-18-B-0001-10001,_Sewer_Lines.pdf PDF
Specs_Page_10_section_33_30_00EN.pdf PDF
FA5575-18-B-0001,_Sewer_Lines.pdf PDF
QUESTIONS_AND_ANSWERS_FOR_SEWER_LINES_AREA_1_PROJECT.pdf PDF
Specs_17-1012_en.pdf PDF
Drawings_17-1012.pdf PDF
Blank_cost_Estimate_KTR_17-1012.xlsx XLSX spreadsheet
Specs_17-1012_sp.pdf PDF
AF66_17-1012.xlsx XLSX spreadsheet
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BASIC PKG KTR

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR SEWER LINES, AREA 1 (BASIC PACKAGE)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 17-1012
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1Topographic Survey
Replanteamiento topográficoJOB
2Removal of existing installation
Demolición de instalaciones existentesLm
3PVC corrugated pipe DN315 mm
Tubo PVC corrugado DN315 mmLm
4PVC corrugated pipe DN250 mm
Tubo PVC corrugado DN250 mmLm
5PVC corrugated pipe DN200 mm
Tubo PVC corrugado DN200 mmLm
6PVC corrugated pipe DN160 mm
Tubo PVC corrugado DN160 mmLm
7PVC pipe DN110 mm
Tubo PVC DN110 mmLm
8Shoring (Trench Depth > 1.3 m)
Entibación (Profundidad de zanja > 1.3 m)Lm
9New complete sewer manhole
Nueva arqueta de saneamiento completaEa
10Repair existing sewer manhole
Reparar arqueta de saneamiento existenteEa
11Road crossing (drilled) RC-1
Cruce de carretera (con topo) RC-1Lm
12Road crossing (drilled) RC-2
Cruce de carretera (con topo) RC-2Lm
13Road crossing (drilled) RC-3
Cruce de carretera (con topo) RC-3Lm
14Road crossing (drilled) RC-4
Cruce de carretera (con topo) RC-4Lm
15Road crossing (drilled) RC-5
Cruce de carretera (con topo) RC-5Lm
16Road crossing (drilled) RC-6
Cruce de carretera (con topo) RC-6Lm
17Road crossing (drilled) RC-7
Cruce de carretera (con topo) RC-7Lm
18Road crossing (drilled) RC-8
Cruce de carretera (con topo) RC-8Lm
19Road crossing (drilled) RC-9
Cruce de carretera (con topo) RC-9Lm
20Road crossing (drilled) RC-10
Cruce de carretera (con topo) RC-10Lm
21Road crossing (drilled) RC-11
Cruce de carretera (con topo) RC-11Lm
22Road crossing (drilled) RC-12
Cruce de carretera (con topo) RC-12Lm
23Road crossing (drilled) RC-13
Cruce de carretera (con topo) RC-13Lm
24Road crossing (drilled) RC-14
Cruce de carretera (con topo) RC-14Lm
25Road crossing (drilled) RC-15
Cruce de carretera (con topo) RC-15Lm
26Road crossing (drilled) RC-16
Cruce de carretera (con topo) RC-16Lm
27Road crossing (drilled) RC-17
Cruce de carretera (con topo) RC-17Lm
28Road crossing (drilled) RC-18
Cruce de carretera (con topo) RC-18Lm
29Road crossing (drilled) RC-19
Cruce de carretera (con topo) RC-19Lm
30Road crossing (drilled) RC-20
Cruce de carretera (con topo) RC-20Lm
31Road crossing (drilled) RC-21
Cruce de carretera (con topo) RC-21Lm
32Road crossing (drilled) RC-22
Cruce de carretera (con topo) RC-22Lm
33Road crossing (drilled) RC-23
Cruce de carretera (con topo) RC-23Lm
34Road crossing (drilled) RC-24
Cruce de carretera (con topo) RC-24Lm
35Repair areas Affected by the Execution of the Project
Reparar zonas afectadas por la ejecución del proyectoJOB
TOTAL
TOTAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL PROJECT (BASIC PACKAGE) EUR

DATE: FIRM NAME:

TITLE: PREPARED BY:

These costs and overhead and profit will be applied in any possible future modifications

&"Times New Roman,Regular"Page &P of &N

ADD KTR

COST ESTIMATE BREAKDOWN
CONTRACTORADDRESS
MORÓN AIR BASE, SPAIN
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
RPR SEWER LINES, AREA 1 (ADDITIVE ITEM)
PURCHASE REQUEST NUMBERPROJECT NUMBERWORK LOCATION
QUUG 17-1012MORÓN AIR BASE, SPAIN
UNITMATERIAL COSTLABOR COSTSOTHER
LINITEMOFDIRECTLINE
NO.MEAS.QUANTI.UNITTOTALMH/MDAV.RATTOTALCOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
ADDITIVE ITEM
PARTIDA ADICIONAL
1Demolish underground concrete block
Demoler bloque de hormigón enterradoEa30
2PVC corrugated pipe DN250 mm
Tubo PVC corrugado DN250 mmLm150
3New complete sewer manhole
Nueva arqueta de saneamiento completaEa8
4Road crossing (drilled) RC-1
Cruce de carretera (con topo) RC-1Ea10
TOTAL ADDITIVE ITEM
TOTAL PARTIDA ADICIONAL

TOTAL MATERIAL COSTS

TOTAL LABOR COSTS

TOTAL OTHER DIRECT COSTS

TOTAL DIRECT COSTS

OVERHEAD %

SUBTOTAL

PROFIT %

TOTAL PROJECT (ADDIT ITEM) EUROS

DATE: FIRM NAME:

TITLE: PREPARED BY:

TITLE: CHIEF OF ENGINEERING & CONSTRUCTION

These costs and overhead and profit will be applied in any possible future modifications