QUESTIONS_AND_ANSWERS_FOR_SEWER_LINES_AREA_1_PROJECT.pdf
PDF 37 KB Posted
- Attached to
- Repair Sewer Lines Area 1 Federal contract opportunity
- Solicitation number
- FA5575-18-B-0001
About this file
Questions & Answers for Repair Sewer Lines, Area 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_-_FA557519BA002_(1).pdf | ||
| Drawings_17-1006.pdf | ||
| English_Specifications_17-1006.pdf | ||
| 06_Cost_Estimate_17-1006_KTR.xls | XLS spreadsheet | |
| Submittals_AF66_17-1006.xlsx | XLSX spreadsheet | |
| Spanish_Specifications_17-1006.pdf | ||
| FA5575-18-B-0001-10001,_Sewer_Lines.pdf | ||
| Contractor_Cost_Estimate_V2.xlsx | XLSX spreadsheet | |
| Specs_Page_10_section_33_30_00EN.pdf | ||
| Specs_Page_10_section_33_30_00SP.pdf | ||
| FA5575-18-B-0001,_Sewer_Lines.pdf | ||
| Blank_cost_Estimate_KTR_17-1012.xlsx | XLSX spreadsheet | |
| Specs_17-1012_sp.pdf | ||
| AF66_17-1012.xlsx | XLSX spreadsheet | |
| Drawings_17-1012.pdf | ||
| Specs_17-1012_en.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS FOR SEWER LINES
AREA 1 PROJECT
FA5575-18-B-0001 – Repair Sewer Lines, Area 1
1) Would like to get additional information about the repair activities involve in the existing sewer manhole?
Answer: There is more than 1 existing sewer manhole to be repaired (see "New to Existing Connection Point" on drawing no. R-725-05).
The repair works to be performed at the existing sewer manholes consist in:
A. Covering the opening of the existing sewer pipes that will not be part of the final sewer system.
B. Connecting the new sewer pipes, including the manhole opening for the new sewer pipes and the sealing/filling of the manhole opening voids between the manhole opening and the new sewer pipes
C. Adapting the finished base surface of the existing sewer manholes, i.e., modifying that surface to provide the open sloped channels and benching based on the location of the new sewer pipes and the flow direction of the wastewater from the inlets to the outlet. The channels shall channelize the wastewater from the inlets to the outlet and the benching is the infield area between the channels and the manhole walls. The benching shall be raised, sloped and shaped.
2) Confirm if for the video inspection (CCTV Closed Circuit Television) a third party certification from an accredited company is required?
Answer: No, a third party certification from an accredited company for the CCTV video inspection of the sewer system is not required. As long as you provide the information requested in the specifications.