QUESTIONS_AND_ANSWERS_FOR_SEWER_LINES_AREA_1_PROJECT.pdf

PDF 37 KB Posted

Attached to
Repair Sewer Lines Area 1 Federal contract opportunity
Solicitation number
FA5575-18-B-0001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Questions & Answers for Repair Sewer Lines, Area 1

View the file

Other files for this federal contract opportunity

Other files attached to Repair Sewer Lines Area 1, newest first.
File Type Posted
Solicitation_-_FA557519BA002_(1).pdf PDF
Drawings_17-1006.pdf PDF
English_Specifications_17-1006.pdf PDF
06_Cost_Estimate_17-1006_KTR.xls XLS spreadsheet
Submittals_AF66_17-1006.xlsx XLSX spreadsheet
Spanish_Specifications_17-1006.pdf PDF
FA5575-18-B-0001-10001,_Sewer_Lines.pdf PDF
Contractor_Cost_Estimate_V2.xlsx XLSX spreadsheet
Specs_Page_10_section_33_30_00EN.pdf PDF
Specs_Page_10_section_33_30_00SP.pdf PDF
FA5575-18-B-0001,_Sewer_Lines.pdf PDF
Blank_cost_Estimate_KTR_17-1012.xlsx XLSX spreadsheet
Specs_17-1012_sp.pdf PDF
AF66_17-1012.xlsx XLSX spreadsheet
Drawings_17-1012.pdf PDF
Specs_17-1012_en.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS FOR SEWER LINES

AREA 1 PROJECT

FA5575-18-B-0001 – Repair Sewer Lines, Area 1

1) Would like to get additional information about the repair activities involve in the existing sewer manhole?

Answer: There is more than 1 existing sewer manhole to be repaired (see "New to Existing Connection Point" on drawing no. R-725-05).

The repair works to be performed at the existing sewer manholes consist in:

A. Covering the opening of the existing sewer pipes that will not be part of the final sewer system.

B. Connecting the new sewer pipes, including the manhole opening for the new sewer pipes and the sealing/filling of the manhole opening voids between the manhole opening and the new sewer pipes

C. Adapting the finished base surface of the existing sewer manholes, i.e., modifying that surface to provide the open sloped channels and benching based on the location of the new sewer pipes and the flow direction of the wastewater from the inlets to the outlet. The channels shall channelize the wastewater from the inlets to the outlet and the benching is the infield area between the channels and the manhole walls. The benching shall be raised, sloped and shaped.

2) Confirm if for the video inspection (CCTV Closed Circuit Television) a third party certification from an accredited company is required?

Answer: No, a third party certification from an accredited company for the CCTV video inspection of the sewer system is not required. As long as you provide the information requested in the specifications.