06_Cost_Estimate_17-1006_KTR.xls
XLS spreadsheet 66 KB Posted
- Attached to
- Repair Sewer Lines Area 1 Federal contract opportunity
- Solicitation number
- FA5575-18-B-0001
About this file
Attachment: Cost estimate KTR.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Submittals_AF66_17-1006.xlsx | XLSX spreadsheet | |
| Solicitation_-_FA557519BA002_(1).pdf | ||
| Spanish_Specifications_17-1006.pdf | ||
| Drawings_17-1006.pdf | ||
| English_Specifications_17-1006.pdf | ||
| FA5575-18-B-0001-10001,_Sewer_Lines.pdf | ||
| Contractor_Cost_Estimate_V2.xlsx | XLSX spreadsheet | |
| Specs_Page_10_section_33_30_00SP.pdf | ||
| Specs_Page_10_section_33_30_00EN.pdf | ||
| FA5575-18-B-0001,_Sewer_Lines.pdf | ||
| QUESTIONS_AND_ANSWERS_FOR_SEWER_LINES_AREA_1_PROJECT.pdf | ||
| Drawings_17-1012.pdf | ||
| Specs_17-1012_en.pdf | ||
| Blank_cost_Estimate_KTR_17-1012.xlsx | XLSX spreadsheet | |
| Specs_17-1012_sp.pdf | ||
| AF66_17-1012.xlsx | XLSX spreadsheet |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KTR
| * | ||||||||||
| CONTRACTOR | ADDRESS | |||||||||
| MORÓN AIR BASE, SPAIN | ||||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| RPR POTABLE WATER LINES, MFH | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| QUUG 17-1006 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LIN | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| ZONE A | ||||||||||
| ZONA A | ||||||||||
| 1 | Demolish existing underground pipe and accessories | |||||||||
| Demolición de tubería enterrada existente y accesorios | Lm | |||||||||
| 2 | Gate Valve 3" and accessories | |||||||||
| Válvulas de compuerta 3" y accesorios | Ea | |||||||||
| 3 | Gate Valve 10" and accessories | |||||||||
| Válvulas de compuerta 10" y accesorios | Ea | |||||||||
| 4 | Polyethylene Pipe PE100 DN90 and connection accessories | |||||||||
| Tubería polietileno PE100 DN90 y accesorios de conexión | Lm | |||||||||
| 5 | Polyethylene Pipe PE100 DN250 and connection accessories | |||||||||
| Tubería polietileno PE100 DN250 y accesorios de conexión | Lm | |||||||||
| 6 | Copper pipe EN1057 1 1/4" ø | |||||||||
| Tubo de cobre EN1057: ø 1 1/4" | Lm | |||||||||
| 7 | Copper pipe EN1057 2" ø | |||||||||
| Tubo de cobre EN1057: ø 2" | Lm | |||||||||
| 8 | Water meter and accessories 25 mm | |||||||||
| Contador de agua y accesorios 25 mm | Ea | |||||||||
| 9 | Ball valve and accessories 1 1/4" | |||||||||
| Válvula de bola y accesorios 1 1/4" | Ea | |||||||||
| 10 | Repair elements affected by the execution of the project | |||||||||
| Reparar elementos afectados por la ejecución del proyecto | JOB | |||||||||
| 11 | GPS Survey | |||||||||
| Survey GPS | JOB | |||||||||
| 12 | Water Leak Survey | |||||||||
| Survey fugas de agua | JOB | |||||||||
| 13 | Miscelaneous | |||||||||
| Varios | JOB | |||||||||
| TOTAL ZONE A | ||||||||||
| TOTAL ZONA A | ||||||||||
| ZONE B | ||||||||||
| ZONA B | ||||||||||
| 14 | Demolish existing underground pipe and accessories | |||||||||
| Demolición de tubería enterrada existente y accesorios | Lm | |||||||||
| 15 | Demolish existing barrel type hydrant and accessories | |||||||||
| Demolición de hidrante vertical existente y accesorios | Ea | |||||||||
| 16 | Demolish existing air relief valve, T, Pipe and accessories | |||||||||
| Demolición ventosa, T, tubería y accesorios | Ea | |||||||||
| 17 | Valve and accessories for barrel type hydrant (GFM) | |||||||||
| Válvula y accesorios para hidrante vertical (GFM) | Ea | |||||||||
| 18 | Barrel type hydrant, T, pipe and accessories | |||||||||
| Hidrante vertical, T, tubería y accesorios | Ea | |||||||||
| 19 | Air Relief Valve DN100 PN16, T, pipe and accessories | |||||||||
| Ventosa DN100 PN16, T, tubería y accesorios | Ea | |||||||||
| 20 | Backflow preventer RPPD 1 1/4" and accessories | |||||||||
| Desconector RPPD 1 1/4" y accesorios | Ea | |||||||||
| 21 | Gate Valve 1 1/4" and accessories | |||||||||
| Válvulas de compuerta 1 1/4" y accesorios | Ea | |||||||||
| 21 | Gate Valve 3" and accessories | |||||||||
| Válvulas de compuerta 3" y accesorios | Ea | |||||||||
| 22 | Gate Valve 6" and accessories | |||||||||
| Válvulas de compuerta 6" y accesorios | Ea | |||||||||
| 23 | Gate Valve 8" and accessories | |||||||||
| Válvulas de compuerta 8" y accesorios | Ea | |||||||||
| 24 | Polyethylene Pipe PE100 DN40 and connection accessories | |||||||||
| Tubería polietileno PE100 DN40 y accesorios de conexión | Lm | |||||||||
| 25 | Polyethylene Pipe PE100 DN90 and connection accessories | |||||||||
| Tubería polietileno PE100 DN90 accesorios de conexión | Lm | |||||||||
| 26 | Polyethylene Pipe PE100 DN160 and connection accessories | |||||||||
| Tubería polietileno PE100 DN160 y accesorios de conexión | Lm | |||||||||
| 27 | Polyethylene Pipe PE100 DN200 and connection accessories | |||||||||
| Tubería polietileno PE100 DN200 y accesorios de conexión | Lm | |||||||||
| 28 | Galvanized steel pipe 1 1/4" ø | |||||||||
| Tubo acero galvanizado EN1057: ø 1 1/4" | Lm | |||||||||
| 29 | Copper pipe EN1057 1 1/4" ø | |||||||||
| Tubo de cobre EN1057: ø 1 1/4" | Lm | |||||||||
| 30 | Copper pipe EN1057 2" ø | |||||||||
| Tubo de cobre EN1057: ø 2" | Lm | |||||||||
| 31 | Water meter and accessories 25 mm | |||||||||
| Contador de agua y accesorios 25 mm | Ea | |||||||||
| 32 | Ball valve and accessories 1 1/4" | |||||||||
| Válvula de bola y accesorios 1 1/4" | Ea | |||||||||
| 33 | Road crossing (drilled) RC-1 | |||||||||
| Cruce de carretera (con topo) RC-1 | Lm | |||||||||
| 34 | Road crossing (drilled) RC-2 | |||||||||
| Cruce de carretera (con topo) RC-2 | Lm | |||||||||
| 35 | Road crossing (drilled) RC-3 | |||||||||
| Cruce de carretera (con topo) RC-3 | Lm | |||||||||
| 36 | Road crossing (drilled) RC-4 | |||||||||
| Cruce de carretera (con topo) RC-4 | Lm | |||||||||
| 37 | Road crossing (drilled) RC-5 | |||||||||
| Cruce de carretera (con topo) RC-5 | Lm | |||||||||
| 38 | Road crossing (drilled) RC-6 | |||||||||
| Cruce de carretera (con topo) RC-6 | Lm | |||||||||
| 39 | Road crossing (drilled) RC-7 | |||||||||
| Cruce de carretera (con topo) RC-7 | Lm | |||||||||
| 40 | Road crossing (drilled) RC-8 | |||||||||
| Cruce de carretera (con topo) RC-8 | Lm | |||||||||
| 41 | Repair elements affected by the execution of the project | |||||||||
| Reparar elementos afectados por la ejecución del proyecto | JOB | |||||||||
| 42 | Paint and marking | |||||||||
| Pintura y señalización | JOB | |||||||||
| 43 | Bollards installation | |||||||||
| Instalación de bolardos | Ea | |||||||||
| 44 | GPS Survey | |||||||||
| Survey GPS | JOB | |||||||||
| 45 | Water Leak Survey | |||||||||
| Survey fugas de agua | JOB | |||||||||
| 46 | Miscelaneous | |||||||||
| Varios | JOB | |||||||||
| TOTAL ZONE B | ||||||||||
| TOTAL ZONA B | ||||||||||
| TOTAL ZONE A | ||||||||||
| TOTAL ZONA A | ||||||||||
| TOTAL ZONE B | ||||||||||
| TOTAL ZONA B | ||||||||||
| TOTAL | ||||||||||
| TOTAL | ||||||||||
| TOTAL MATERIAL COSTS | ||||||||||
| TOTAL LABOR COSTS | ||||||||||
| TOTAL OTHER DIRECT COSTS | ||||||||||
| TOTAL DIRECT COSTS | ||||||||||
| OVERHEAD | % | |||||||||
| SUBTOTAL | ||||||||||
| PROFIT | % | |||||||||
| TOTAL PROJECT EUROS | ||||||||||
| DATE: | FIRM NAME: | |||||||||
| TITLE: | BY: | |||||||||
| These costs and overhead and profit percentages will be applied in any possible future modifications |