Questions_and_Answers_-_Pre-Bid_(REVISED).docx
DOCX document 15 KB Posted
- Attached to
- Construct Concrete Slab and Erect LAMS Shelter Federal contract opportunity
- Solicitation number
- FA5575-15-B-0001
About this file
Revised Questions and Answers
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_6_-_Past_Performance_Reference_List.doc | DOC document | |
| Amendment_001.doc | DOC document | |
| Amendment_1_Drawing_-_Slab_Dimension.pdf | ||
| Questions_and_Answers_-_Pre-Bid.docx | DOCX document | |
| Amendment_1_Drawing_-_Anchor_Footing_Options.pdf | ||
| Attachment_5_-_Cost_Breakdown.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Spanish_Specifications.pdf | ||
| Attachment_4_-_Submittal_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_3_-_Project_Drawings.pdf | ||
| FA5575-15-B-0001 _Solicitation.pdf | ||
| Attachment_1_-_English_Specifications.pdf | ||
| FA5575-15-B-0001 _Synopsis.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA5575-15-B-0001, QUESTIONS AND ANSWERS
1. -In the Cost_Breakdown's Line#11 calls to construct high concrete wall ring. This high concrete all ring is missing in the drawing SB-101. We understand that details for this concrete wall ring have to be provided. FROM SEMI – 18 MARCH 2015
CE RESPONSE (18 MARCH 2015): The answer to the contractor question is detailed in the second one with the reference "5 Concrete Anchor at Ring Wall".
The ring wall, is to be constructed inside the edge to edge dimensions referred in the first attachments.
*DRAWINGS TO BE INCLUDED IN AMENDMENT 0001.
2. -See Expansion Joint Detail, Drawing SB101. Regarding to the dowel and expansión cap: the grade for the dowels and the distance between them are not specified. We need to know that information.
CE RESPONSE (31 MARCH 2015): The dowel steel has to be S-275-JR in accordance with the Spanish UNE-EN-10025.
The maximum dowel spacing is 12 inches.
Dowels shall not be placed closer than 0.6 times the dowel length to the planned joint line. If the last regularly spaced dowel is closer than that dimension, it shall be moved away from the joint to a location 0.6 times the dowel length, but not closer than 150 mm to its nearest neighbor.
3. Is the Quality Manager figure mandatory, if so, is he/she required to be on the site at all times or just in when needed or required?
CE RESPONSE (31 MARCH 2015): A designated Quality Control Manager figure is not mandatory for this low-complexity construction project. QC duties can be performed by the Superintendent (which must be present at all times), or any other personnel.