Questions_and_Answers_-_Pre-Bid_(REVISED).docx

DOCX document 15 KB Posted

Attached to
Construct Concrete Slab and Erect LAMS Shelter Federal contract opportunity
Solicitation number
FA5575-15-B-0001
Issued by
Department of the Air Force United States Air Forces in Europe - Air Forces Africa

About this file

Revised Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Construct Concrete Slab and Erect LAMS Shelter, newest first.
File Type Posted
Attachment_6_-_Past_Performance_Reference_List.doc DOC document
Amendment_001.doc DOC document
Amendment_1_Drawing_-_Slab_Dimension.pdf PDF
Questions_and_Answers_-_Pre-Bid.docx DOCX document
Amendment_1_Drawing_-_Anchor_Footing_Options.pdf PDF
Attachment_5_-_Cost_Breakdown.xlsx XLSX spreadsheet
Attachment_2_-_Spanish_Specifications.pdf PDF
Attachment_4_-_Submittal_Schedule.xlsx XLSX spreadsheet
Attachment_3_-_Project_Drawings.pdf PDF
FA5575-15-B-0001 _Solicitation.pdf PDF
Attachment_1_-_English_Specifications.pdf PDF
FA5575-15-B-0001 _Synopsis.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA5575-15-B-0001, QUESTIONS AND ANSWERS

1. -In the Cost_Breakdown's Line#11 calls to construct high concrete wall ring. This high concrete all ring is missing in the drawing SB-101. We understand that details for this concrete wall ring have to be provided. FROM SEMI – 18 MARCH 2015

CE RESPONSE (18 MARCH 2015): The answer to the contractor question is detailed in the second one with the reference "5 Concrete Anchor at Ring Wall".

The ring wall, is to be constructed inside the edge to edge dimensions referred in the first attachments.

*DRAWINGS TO BE INCLUDED IN AMENDMENT 0001.

2. -See Expansion Joint Detail, Drawing SB101. Regarding to the dowel and expansión cap: the grade for the dowels and the distance between them are not specified. We need to know that information.

CE RESPONSE (31 MARCH 2015): The dowel steel has to be S-275-JR in accordance with the Spanish UNE-EN-10025.

The maximum dowel spacing is 12 inches.

Dowels shall not be placed closer than 0.6 times the dowel length to the planned joint line. If the last regularly spaced dowel is closer than that dimension, it shall be moved away from the joint to a location 0.6 times the dowel length, but not closer than 150 mm to its nearest neighbor.

3. Is the Quality Manager figure mandatory, if so, is he/she required to be on the site at all times or just in when needed or required?

CE RESPONSE (31 MARCH 2015): A designated Quality Control Manager figure is not mandatory for this low-complexity construction project. QC duties can be performed by the Superintendent (which must be present at all times), or any other personnel.