Questions_and_Answers_-_Pre-Bid.docx
DOCX document 14 KB Posted
- Attached to
- Construct Concrete Slab and Erect LAMS Shelter Federal contract opportunity
- Solicitation number
- FA5575-15-B-0001
About this file
Questions and Answers Part 1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_-_Pre-Bid_(REVISED).docx | DOCX document | |
| Attachment_6_-_Past_Performance_Reference_List.doc | DOC document | |
| Amendment_001.doc | DOC document | |
| Amendment_1_Drawing_-_Slab_Dimension.pdf | ||
| Amendment_1_Drawing_-_Anchor_Footing_Options.pdf | ||
| Attachment_5_-_Cost_Breakdown.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Spanish_Specifications.pdf | ||
| Attachment_4_-_Submittal_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_3_-_Project_Drawings.pdf | ||
| FA5575-15-B-0001 _Solicitation.pdf | ||
| Attachment_1_-_English_Specifications.pdf | ||
| FA5575-15-B-0001 _Synopsis.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA5575-15-B-0001, QUESTIONS AND ANSWERS
1. -In the Cost_Breakdown's Line#11 calls to construct high concrete wall ring. This high concrete all ring is missing in the drawing SB-101. We understand that details for this concrete wall ring have to be provided. FROM SEMI – 18 MARCH 2015
CE RESPONSE (18 MARCH 2015): The answer to the contractor question is detailed in the second one with the reference "5 Concrete Anchor at Ring Wall".
The ring wall, is to be constructed inside the edge to edge dimensions referred in the first attachments.
*DRAWINGS TO BE INCLUDED IN AMENDMENT 0001.