Attachment_4_-_Submittal_Schedule.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Construct Concrete Slab and Erect LAMS Shelter Federal contract opportunity
- Solicitation number
- FA5575-15-B-0001
About this file
Attachment 4 - Submittal Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_-_Pre-Bid_(REVISED).docx | DOCX document | |
| Attachment_6_-_Past_Performance_Reference_List.doc | DOC document | |
| Amendment_001.doc | DOC document | |
| Amendment_1_Drawing_-_Slab_Dimension.pdf | ||
| Questions_and_Answers_-_Pre-Bid.docx | DOCX document | |
| Amendment_1_Drawing_-_Anchor_Footing_Options.pdf | ||
| Attachment_5_-_Cost_Breakdown.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Spanish_Specifications.pdf | ||
| Attachment_3_-_Project_Drawings.pdf | ||
| FA5575-15-B-0001 _Solicitation.pdf | ||
| Attachment_1_-_English_Specifications.pdf | ||
| FA5575-15-B-0001 _Synopsis.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | |||
| WR #15169 | PROJECT TITLE | |||
| CONSTRUCT CONCRETE SLAB AND ERECT LAMS SHELTER | SOLICITATION / CONTRACT NO. |
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | ||||||||||||||||||||||
| SECTION 1 | |||||||||||||||||||||||
| 1 | Construction Schedule | 3 | NTP+5 | ||||||||||||||||||||
| 2 | Government furnished material request | 3 | Work-15 | ||||||||||||||||||||
| SECTION 2 | |||||||||||||||||||||||
| 3 | Warranty letter | 3 | Acceptance+15 | ||||||||||||||||||||
| 4 | Progress Schedule | 3 | NTP+10 | ||||||||||||||||||||
| 5 | Mobility Plan | 3 | NTP+15 | ||||||||||||||||||||
| 6 | Project sign | 3 | NTP+15 | ||||||||||||||||||||
| 7 | Waste & construction debris management certificate | 3 | Acceptance+15 | ||||||||||||||||||||
| 8 | As-Built drawings | 3 | Acceptance+15 | ||||||||||||||||||||
| 9 | Spatial Data | 3 | Acceptance+15 | ||||||||||||||||||||
| 10 | Key Personnel | 3 | NTP+15 | ||||||||||||||||||||
| 11 | Health and safety program | 3 | NTP+15 | ||||||||||||||||||||
| APPENDIX E | |||||||||||||||||||||||
| 12 | Backfill material | 3 | |||||||||||||||||||||
| APPENDIX F | |||||||||||||||||||||||
| 13 | Concrete Control Test Program | 3 | Before concreting | ||||||||||||||||||||
| 14 | Result of Concrete Control Tests | 3 | within 24 hours of receipt | ||||||||||||||||||||
| APPENDIX G | |||||||||||||||||||||||
| 15 | Joint backstop rod | 3 | Before procurement | ||||||||||||||||||||
| 16 | Primer | 3 | Before procurement | ||||||||||||||||||||
| 17 | Sealant | 3 | Before procurement | ||||||||||||||||||||
| APPENDIX H | |||||||||||||||||||||||
| 18 | Resilient sheet sport flooring system | 1 | 3 | 3 | Before procurement | ||||||||||||||||||
| APPENDIX I | |||||||||||||||||||||||
| 19 | PVC piping | 3 | |||||||||||||||||||||
| APPENDIX J | |||||||||||||||||||||||
| 20 | Conduits, 1 of each type | 3 | |||||||||||||||||||||
| 21 | Cables | 3 | |||||||||||||||||||||
| 22 | Buried warning and identification tape | 3 | |||||||||||||||||||||
| 23 | Ground wires | 3 | |||||||||||||||||||||
| 24 | Handholes | 3 | |||||||||||||||||||||
| 25 | Handohole covers | 3 | |||||||||||||||||||||
| 26 | Ground rods | 3 | |||||||||||||||||||||
| 27 | Exothermic welding | 3 | |||||||||||||||||||||
| 28 | Pre-manufactured concrete panelboard | 3 | |||||||||||||||||||||
| 29 | Circuit breakers | 3 | |||||||||||||||||||||
| 30 | Safety Switches | 3 | |||||||||||||||||||||
| 31 | Grounding Test/Bar Wells | 3 | |||||||||||||||||||||
| 32 | Grounding Bars | 3 | |||||||||||||||||||||
| 33 | Panel MDP | 3 | Before procurement | ||||||||||||||||||||
| 34 | Low Voltage Cagble Test | 3 | After installation | ||||||||||||||||||||
| 35 | Ground Resistance Test | 3 | After installation | ||||||||||||||||||||
| 36 | Load Analysis | 3 | After installation, before work acceptance | ||||||||||||||||||||
| 37 | O&M Manuals | 3 | After installation, before work acceptance |
&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N
MSS Spanish
| RESUMEN MUESTRAS DE MATERIAL | NÚMERO PROYECTO: | |||
| WR #15169 | TÍTULO DE PROYECTO: | |||
| CONSTRUIR LOSA DE HORMIGÓN Y ERIGIR CARPA LAMS | SOLICITACIÓN / CONTRATO NO. |
| (A cumplimentar por el ingeniero del proyecto) | (A cumplimentar por administrador del contrato) | ||||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||||||||||
| LÍNEA NÚMERO | PARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓN | CERTIFICADO DE CUMPLIMIENTO | PLANOS DE TALLER | MUESTRAS | SELECCIÓN DE COLOR | RECOMENDACIONES DEL FABRICANTE | GARANTÍA DEL FABRICANTE | DATOS DE CATÁLOGO | INSTRUCCIONES DE FUNCIONAMIENTO | PROGRAMAS, LISTADOS, INFORMES, PLANES | DATOS TÉCNICOS | PRUEBAS | INFORMES DE TRABAJOS DE CAMPO | FECHA DE ENTREGA | FECHA RECEPCIÓN EN CONTRATACIÓN | FECHA EN INGENIERíA CIVIL | FECHA LÍMITE DE DEVOLUCIÓN | NÚMERO DE MUESTRA | FECHA NOTIFICACIÓN A CONTRATISTA | SEGUNDA PRESENTACIÓN DEL CONTRATISTA | APROBACIÓN FINAL | OBSERVACIONES | |
| APROBADO | DESAPROBADO | ||||||||||||||||||||||
| SECCIÓN 1 | |||||||||||||||||||||||
| 1 | Programa de obra | 3 | NTP+5 | ||||||||||||||||||||
| 2 | Solicitud de material suministrado por el Gobierno | 3 | Trabajo-15 | ||||||||||||||||||||
| SECCIÓN 2 | |||||||||||||||||||||||
| 3 | Carta de garantía | 3 | Aceptación+15 | ||||||||||||||||||||
| 4 | Programa de avance de obras | 3 | NTP+10 | ||||||||||||||||||||
| 5 | Plan de movilización | 3 | NTP+15 | ||||||||||||||||||||
| 6 | Cartel de proyecto | 3 | NTP+15 | ||||||||||||||||||||
| 7 | Certificado de gestión de residuos y escombros | 3 | Aceptación+15 | ||||||||||||||||||||
| 8 | Planos As-Builts | 3 | Aceptación+15 | ||||||||||||||||||||
| 9 | Datos espaciales | 3 | Aceptación+15 | ||||||||||||||||||||
| 10 | Personal clave | 3 | NTP+15 | ||||||||||||||||||||
| 11 | Plan de salud y seguridad | 3 | NTP+15 | ||||||||||||||||||||
| ANEXO E | |||||||||||||||||||||||
| 12 | Material de Relleno | 3 | |||||||||||||||||||||
| ANEXO F | |||||||||||||||||||||||
| 13 | Programa de Ensayos de Control de Hormigón | 3 | Antes de hormigonar | ||||||||||||||||||||
| 14 | Resultados de Ensayos de Control de Hormigón | 3 | En las 24 horas de su recepción | ||||||||||||||||||||
| ANEXO G | |||||||||||||||||||||||
| 15 | Fondo de Juntas | 3 | Antes de adquirir | ||||||||||||||||||||
| 16 | Imprimación | 3 | Antes de adquirir | ||||||||||||||||||||
| 17 | Sellante | 3 | Antes de adquirir | ||||||||||||||||||||
| ANEXO H | |||||||||||||||||||||||
| 18 | Sistema de Pavimento Deportivo Resiliente | 1 | 3 | 3 | Antes de adquirir | ||||||||||||||||||
| ANEXO I | |||||||||||||||||||||||
| 19 | Tubería de PVC | 3 | |||||||||||||||||||||
| ANEXO J | |||||||||||||||||||||||
| 20 | Conductos, 1 de cada tipo | 3 | |||||||||||||||||||||
| 21 | Cables | 3 | |||||||||||||||||||||
| 22 | Cinta de Aviso e Identificación | 3 | |||||||||||||||||||||
| 23 | Conductores de Tierra | 3 | |||||||||||||||||||||
| 24 | Arquetas | 3 | |||||||||||||||||||||
| 25 | Tapas de Arquetas | 3 | |||||||||||||||||||||
| 26 | Picas de Tierra | 3 | |||||||||||||||||||||
| 27 | Soldadura Exotérmica | 3 | |||||||||||||||||||||
| 28 | Armario Pre-fabricado de Hormigón | 3 | |||||||||||||||||||||
| 29 | Interruptores Magnetotérmicos | 3 | |||||||||||||||||||||
| 30 | Desconectadores Fusibles | 3 | |||||||||||||||||||||
| 31 | Arquetas para Lecturas de Tierra | 3 | |||||||||||||||||||||
| 32 | Barras Equipotenciales | 3 | |||||||||||||||||||||
| 33 | Panel MDP | 3 | Antes de adquirir | ||||||||||||||||||||
| 34 | Pruebas de Cables de Baja Tensión | 3 | Tras instalación | ||||||||||||||||||||
| 35 | Pruebas del Sistema de Puesta a Tierra | 3 | Tras instalación | ||||||||||||||||||||
| 36 | Análisis de Cargas | 3 | Tras instalación, previa a aceptación del trabajo | ||||||||||||||||||||
| 37 | Manuales de Funcionamiento y Mantenimiento | 3 | Tras instalación, previa a aceptación del trabajo |