Attachment 4 - Submittal Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Construct Concrete Slab and Erect LAMS Shelter, newest first.
File Type Posted
Questions_and_Answers_-_Pre-Bid_(REVISED).docx DOCX document
Attachment_6_-_Past_Performance_Reference_List.doc DOC document
Amendment_001.doc DOC document
Amendment_1_Drawing_-_Slab_Dimension.pdf PDF
Questions_and_Answers_-_Pre-Bid.docx DOCX document
Amendment_1_Drawing_-_Anchor_Footing_Options.pdf PDF
Attachment_5_-_Cost_Breakdown.xlsx XLSX spreadsheet
Attachment_2_-_Spanish_Specifications.pdf PDF
Attachment_3_-_Project_Drawings.pdf PDF
FA5575-15-B-0001 _Solicitation.pdf PDF
Attachment_1_-_English_Specifications.pdf PDF
FA5575-15-B-0001 _Synopsis.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBER
WR #15169PROJECT TITLE
CONSTRUCT CONCRETE SLAB AND ERECT LAMS SHELTERSOLICITATION / CONTRACT NO.
(To be completed by Project Engineer)(To be completed by Contract Administrator)
NUMBER OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCESHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONMANUFACTURER'S WARRANTYCATALOG DATAOPERATING INSTRUCTIONSSCHEDULES, LISTINGS, REPORTS, PLANSTECHNICAL DATATEST REPORTSFIELD REPORTSREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERSDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
APPROVEDDISAPPROVED
SECTION 1
1Construction Schedule3NTP+5
2Government furnished material request3Work-15
SECTION 2
3Warranty letter3Acceptance+15
4Progress Schedule3NTP+10
5Mobility Plan3NTP+15
6Project sign3NTP+15
7Waste & construction debris management certificate3Acceptance+15
8As-Built drawings3Acceptance+15
9Spatial Data3Acceptance+15
10Key Personnel3NTP+15
11Health and safety program3NTP+15
APPENDIX E
12Backfill material3
APPENDIX F
13Concrete Control Test Program3Before concreting
14Result of Concrete Control Tests3within 24 hours of receipt
APPENDIX G
15Joint backstop rod3Before procurement
16Primer3Before procurement
17Sealant3Before procurement
APPENDIX H
18Resilient sheet sport flooring system133Before procurement
APPENDIX I
19PVC piping3
APPENDIX J
20Conduits, 1 of each type3
21Cables3
22Buried warning and identification tape3
23Ground wires3
24Handholes3
25Handohole covers3
26Ground rods3
27Exothermic welding3
28Pre-manufactured concrete panelboard3
29Circuit breakers3
30Safety Switches3
31Grounding Test/Bar Wells3
32Grounding Bars3
33Panel MDP3Before procurement
34Low Voltage Cagble Test3After installation
35Ground Resistance Test3After installation
36Load Analysis3After installation, before work acceptance
37O&M Manuals3After installation, before work acceptance

&"Arial,Bold"&8Schedule of Material Submittals, Feb 05 (SAF/AQCP) Page &P of &N

MSS Spanish

RESUMEN MUESTRAS DE MATERIALNÚMERO PROYECTO:
WR #15169TÍTULO DE PROYECTO:
CONSTRUIR LOSA DE HORMIGÓN Y ERIGIR CARPA LAMSSOLICITACIÓN / CONTRATO NO.
(A cumplimentar por el ingeniero del proyecto)(A cumplimentar por administrador del contrato)
NUMBER OF COPIES REQUIRED
LÍNEA NÚMEROPARTIDA O DESCRIPCIÓN DE PARTIDA, REFERENCIA DEL CONTRATO, TIPO DE PRESENTACIÓNCERTIFICADO DE CUMPLIMIENTOPLANOS DE TALLERMUESTRASSELECCIÓN DE COLORRECOMENDACIONES DEL FABRICANTEGARANTÍA DEL FABRICANTEDATOS DE CATÁLOGOINSTRUCCIONES DE FUNCIONAMIENTOPROGRAMAS, LISTADOS, INFORMES, PLANESDATOS TÉCNICOSPRUEBASINFORMES DE TRABAJOS DE CAMPOFECHA DE ENTREGAFECHA RECEPCIÓN EN CONTRATACIÓNFECHA EN INGENIERíA CIVILFECHA LÍMITE DE DEVOLUCIÓNNÚMERO DE MUESTRAFECHA NOTIFICACIÓN A CONTRATISTASEGUNDA PRESENTACIÓN DEL CONTRATISTAAPROBACIÓN FINALOBSERVACIONES
APROBADODESAPROBADO
SECCIÓN 1
1Programa de obra3NTP+5
2Solicitud de material suministrado por el Gobierno3Trabajo-15
SECCIÓN 2
3Carta de garantía3Aceptación+15
4Programa de avance de obras3NTP+10
5Plan de movilización3NTP+15
6Cartel de proyecto3NTP+15
7Certificado de gestión de residuos y escombros3Aceptación+15
8Planos As-Builts3Aceptación+15
9Datos espaciales3Aceptación+15
10Personal clave3NTP+15
11Plan de salud y seguridad3NTP+15
ANEXO E
12Material de Relleno3
ANEXO F
13Programa de Ensayos de Control de Hormigón3Antes de hormigonar
14Resultados de Ensayos de Control de Hormigón3En las 24 horas de su recepción
ANEXO G
15Fondo de Juntas3Antes de adquirir
16Imprimación3Antes de adquirir
17Sellante3Antes de adquirir
ANEXO H
18Sistema de Pavimento Deportivo Resiliente133Antes de adquirir
ANEXO I
19Tubería de PVC3
ANEXO J
20Conductos, 1 de cada tipo3
21Cables3
22Cinta de Aviso e Identificación3
23Conductores de Tierra3
24Arquetas3
25Tapas de Arquetas3
26Picas de Tierra3
27Soldadura Exotérmica3
28Armario Pre-fabricado de Hormigón3
29Interruptores Magnetotérmicos3
30Desconectadores Fusibles3
31Arquetas para Lecturas de Tierra3
32Barras Equipotenciales3
33Panel MDP3Antes de adquirir
34Pruebas de Cables de Baja Tensión3Tras instalación
35Pruebas del Sistema de Puesta a Tierra3Tras instalación
36Análisis de Cargas3Tras instalación, previa a aceptación del trabajo
37Manuales de Funcionamiento y Mantenimiento3Tras instalación, previa a aceptación del trabajo

&"Arial,Bold"&8Resumen de muestras de material, Feb 05 (SAF/AQCP) Página &P de &N