Attachment 5 - Cost Breakdown
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_6_-_Past_Performance_Reference_List.doc | DOC document | |
| Questions_and_Answers_-_Pre-Bid_(REVISED).docx | DOCX document | |
| Amendment_001.doc | DOC document | |
| Amendment_1_Drawing_-_Slab_Dimension.pdf | ||
| Questions_and_Answers_-_Pre-Bid.docx | DOCX document | |
| Amendment_1_Drawing_-_Anchor_Footing_Options.pdf | ||
| Attachment_2_-_Spanish_Specifications.pdf | ||
| Attachment_4_-_Submittal_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_3_-_Project_Drawings.pdf | ||
| FA5575-15-B-0001 _Solicitation.pdf | ||
| Attachment_1_-_English_Specifications.pdf | ||
| FA5575-15-B-0001 _Synopsis.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ktor
| CONSTRUCTION COST ESTIMATE BREAKDOWN | |
| CONTRACTOR | ADDRESS |
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| CONSTRUCT CONCRETE SLAB AND ERECT LAMS SHELTER | ||||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| WR #15169 | MORÓN AIR BASE, SPAIN | |||||||||
| UNIT | MATERIAL COST | LABOR COSTS | OTHER | |||||||
| LINE | ITEM | OF | DIRECT | LINE | ||||||
| NO. | MEAS. | QUANTI. | UNIT | TOTAL | MH/MD | AV.RAT | TOTAL | COSTS | TOTAL | |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | |
| SITE PREPARATION WORKS | ||||||||||
| TRABAJOS DE ACONDICIONAMIENTO DEL TERRENO | ||||||||||
| Earth Works for Structures and Pavements | ||||||||||
| Movimientos de tierra para estructuras y pavimentos | ||||||||||
| 1 | Clean and clearing the shelter site place | |||||||||
| Limpieza y desbroce de la zona de la carpa | m2 | |||||||||
| 2 | Excavate down to the concrete slab laying level | |||||||||
| Excavar hasta la cota de asiento de la solera | M3 | |||||||||
| 3 | Compact the subgrade to obtain the 90% PM | |||||||||
| Compactar fondo de caja hasta obtener el 90% PM | SM | |||||||||
| 4 | Trench excavation for wall ring | |||||||||
| Excavación en zanja para viga perimetral | M3 | |||||||||
| 5 | Clean , level and compact to 90% PM the trench bottom | |||||||||
| Limpieza, perfilado y compact. 90% PM fondo de zanja | sm | |||||||||
| 6 | Provide and install 180gr/m2 geotextile | |||||||||
| Proveer e instalar geotextil de 180gr/m2 | SM | |||||||||
| 7 | Provide, extend & compact to 90% PM agreggate layer | |||||||||
| Proveer, extender y compactar al 90% PM capa zahorra | M3 | |||||||||
| 8 | Demolish and install irrigation pipe | |||||||||
| Demoler e instalar tubería de riego | LM | |||||||||
| 9 | Load and transport excavation material to disposal area | |||||||||
| Cargar y transportar material de la excavacion a verted | M3 | |||||||||
| Total Earth Works for Structures and Pavements | ||||||||||
| Total Movimientos de tierra para estructuras y pavim. |
| Cast-in-pace Concrete | ||
| Hormigón vertido in-situ | ||
| 10 | Provide and pour a 5 cm thick lean concrete layer | |
| Proveer y vertir capa de hormigón de limpieza de 5 cm | SM | |
| 11 | Provide materials and construct high concrete wall ring | |
| Proveer materiales y construir viga perimetral de HA | M3 | |
| 12 | Provide and install a 400 ga polyethylene layer | |
| Proveer y extender lámina de polietileno de 400 galgas | SM | |
| 13 | Provide materials and construct reinforced concrete slab 6' | |
| Proveer materiales y construir solera de HA de 6' | SM | |
| 14 | Provide materials and construct concrete sidewalk | |
| Proveer materiales y construir acera de hormigón | LM | |
| Total Cast-in-place concrete | ||
| Total hormigón vertido in-situ |
| Joint Seal for Concrete Slabs Joints | ||
| Sellado de juntas de soleras de hormigón | ||
| 15 | Empty the slab joints, clean and prepare the surfaces | |
| Vaciar juntas, limpiar y preparar superficies | LM | |
| 16 | Provide material and seal expansion joints | |
| Proveer material y sellar juntas de expansión | LM | |
| 17 | Perform retraction joint by cutting, clean and apply sealan | |
| Reaizar cortes de juntas de retracción, limpiar y sellar | LM | |
| Total Joint Seal for Concrete Slabs Joints | ||
| Total Sellado de juntas de soleras de hormigón |
| Finishes | ||
| Acabados | ||
| 18 | Preparation and cleanig of concrete floor slab surface | |
| Preparación y limpiea de superficie de solera de hormigón | LM | |
| 19 | Sports resilient rubber rolls sport, base and finishes | |
| Pav. Deport. Flexible rollos pegados, base y acabados | SM | |
| 20 | Sports resilien tiles glued | |
| Revestimiento uso deportivo flexible pegado | EA | |
| Total Finishes | ||
| Total Acabados | ||
| SITE PREPARATION WORKS TOTAL | ||
| TOTAL TRABAJOS DE ACONDICIONAMIENTO DEL TERRENO |
| ELECTRICAL SERVICE WORKS | ||
| TRABAJOS DE ACOMETIDA ELÉCTRICA | ||
| 21 | 4x400A 50kA Molded-Case Main Circuit Breaker in Transformer Sub-station | |
| Interruptor principal caja moldeada 4x400A 50kA en Centro de Transformación | Ea | |
| 22 | Underground service line to MDP Panelboard | |
| Acometida eléctrica a panel MDP | Lm | |
| 23 | New Manholes | |
| Nuevas arquetas | Ea | |
| 24 | Directional boring below paved sidewalk | |
| Paso subterráneo bajo acerado adoquinado | Ea | |
| 25 | New MDP Panelboard in outdoors concrete encasement | |
| Nuevo panel MDP en monolito de hormigón para exterior | Ea | |
| 26 | Underground service line to Load Center | |
| Acometida eléctrica a panel secundario | Lm | |
| 27 | Underground service 95 mm2 line to HVAC Units | |
| Acometida eléctrica de 95 mm2 udes. aire acondicionado | Lm | |
| 28 | Underground service 16 mm2 line to HVAC Units | |
| Acometida eléctrica de 16 mm2 udes. aire acondicionado | Lm | |
| 29 | Stranded bare copper cable, 35mm2 | |
| Cable trenzado desnudo de cobre, 35mm2 | Lm | |
| 30 | Copper-clad grounding rods Ø19x3000mm and handhole | |
| Picas de tierra acero cobreado Ø19x3000mm y registro | Ea | |
| 31 | Load Analysis and final field wiring adjustments | |
| Análisis de carga y ajustes de cableado en obra finales | Job | |
| 32 | Security/access system raceway | |
| Canalización sistema de seguridad/control de acceso | Lm | |
| ELECTRICAL SERVICE WORKS TOTAL | ||
| TOTAL TRABAJOS ACOMETIDA EL��ÉCTRICA |
| GFM INSTALLATION | ||
| INSTALACIÓN MATERIAL SUMINISTRADO POR EL GOBIERNO | ||
| 33 | Installation of GFM Shasta Shelter and Equipment | |
| Instalación de material y equipos suministrados por el Gobierno (GFM) | Job | |
| GFM INSTALLATION TOTAL | ||
| TOTAL INSTALACIÓN MATERIAL GFM |
| SUMMARY |
| RESUMEN |
| SITE PREPARATION WORKS |
| TRABAJOS DE ACONDICIONAMIENTO DEL TERRENO |
| Earth Works for Structures and Pavements |
| Movimientos de tierra para estructuras y pavimentos |
| Cast-in-pace Concrete |
| Hormigón vertido in-situ |
| Joint Seal for Concrete Slabs Joints |
| Sellado de juntas de soleras de hormigón |
| Finishes |
| Acabados |
| SITE PREPARATION WORKS TOTAL |
| TOTAL TRABAJOS DE ACONDICIONAMIENTO DEL TERRENO |
| ELECTRICAL SERVICE WORKS TOTAL |
| TOTAL TRABAJOS ACOMETIDA EL��ÉCTRICA |
| GFM INSTALLATION TOTAL |
| TOTAL INSTALACIÓN MATERIAL GFM |
| GRAND TOTAL |
| GRAN TOTAL |
TOTAL MATERIAL COSTS
TOTAL LABOR COSTS
TOTAL OTHER DIRECT COSTS
TOTAL DIRECT COSTS
OVERHEAD %
SUBTOTAL
PROFIT %
TOTAL PROJECT (EUROS)
DATE: FIRM NAME: